Construction safety inspection implementation plan
Safety management in construction industry has always been one of the problems that hinder the sustained and stable development of China's national economy. Strengthening construction safety management can promote the development of construction industry and the harmonious development of society. The following is the implementation plan of building safety inspection that I have compiled for you. Let's have a look!

Implementation Plan I of Building Safety Inspection

Village (neighborhood) committees and enterprises:

According to the requirements of Meng 'an Office [20 * *] 14 "Notice on Carrying out Special Renovation Activities for Construction Safety in the County", the town government has formulated the implementation plan for special actions for construction safety inspection as follows:

First, set up organizations and strengthen leadership.

At present, it is in the centralized construction period of construction projects, with many projects under construction and heavy construction safety supervision tasks. Facing the current situation of building safety, the town party committee fully realized the importance and urgency of building safety work and set up a leading group to strengthen safety supervision:

Team leader: Chen Yuying (Party Secretary and Mayor)

Deputy Head: Wang Yong (member of the Party Committee)

Member: Liang (Director of Safety Supervision Office)

Li Kui (Director of DangZhengBan)

Ge Qiang (Director of Police Station)

Mainly carry out safety inspection and supervision on existing construction enterprises.

Two, according to the law to rectify illegal construction, and vigorously standardize the order of construction safety production.

In accordance with the law, illegal scaffolding and hoisting machinery are not inspected for a long time, and the hidden dangers of collapse and electric shock, formwork components and falling accidents in the field of earthwork construction are deeply dug, and the main responsibility of safety production of the construction unit is fully implemented. The construction unit did not receive safety training, and urged the construction unit to seriously carry out safety education and training. If the management of the construction unit is chaotic and the safety precautions are not implemented, the construction shall be stopped immediately and rectified within a time limit to prevent all kinds of accidents on the construction site.

Three, clear responsibility, pay close attention to the responsibility of construction safety supervision.

The main person in charge of the village and the construction enterprise is the first person in charge of production safety. They should take overall responsibility for the construction safety inspection of their own areas and units, conduct in-depth investigation of hidden dangers, leave no dead ends, and follow up immediately when hidden dangers are found? Personnel, time and measures? Three principles for rectification, effectively eliminate hidden dangers, ensure construction safety, and effectively prevent production safety accidents.

Sanyi Town People's Government

Implementation Plan II of Building Safety Inspection

Danyang Construction Safety Supervision Station:

Nearly four months? Construction safety inspection? The activity has ended. In this activity, our company closely revolves around? Take multiple measures and check frequently to ensure safety? The theme of the activity is to carry out the work according to the contents of the Work Safety Inspection Activity Plan issued by our company on June 26th, 2065438. Through this activity, the safety production of our company was ensured, the safety awareness of all employees was strengthened, the production operation skills of front-line workers were improved, and the high temperature construction in summer was successfully passed. Of course, behind this activity, we also saw many shortcomings of ourselves: for example, the safety awareness of some employees is still very weak, and the influence of the idea of attaching importance to progress over safety; The safety inspection of the project department is not active enough, the rectification and closure of hidden dangers are not thorough enough, and the coverage of special types of work and licensed mechanical operators is not enough. How is our company this time? Security check? These activities are summarized as follows:

(1) From June 22 to June 25, the general manager of the company was in charge of the safety production manager, and relevant personnel such as Quality and Safety Department, Equipment Department and Marketing Department * * * combed and summarized the safety production responsibility system at all levels of the company and the number of projects under construction, and explained and arranged the "Safety Production Inspection Activity Plan" of our company. Through the discussion and analysis of our company's current safety production situation, in the safety management of engineering construction, we should strengthen the company's supervision and corresponding inspection in the following aspects.

1. Strictly review the qualifications and safety certificates of the project subcontracting team and the labor service ZuoYeDui; Must be able to meet the construction management requirements of the project.

2. Review the project management structure of the subcontracting team and the labor operation team, and require them to be equipped with full-time safety officers and related management personnel according to the document JJ [2008] No.91.

3. For the project department and subcontracting team under construction, before entering the site, disclose the safety management system, safety management objectives, project overview and key points to all construction personnel, and monitor the implementation of their safety responsibility system and relevant rules and regulations at any time, strengthen process management, and prevent all kinds of casualties.

4. According to the national, provincial and municipal regulations on the dynamic management of construction project safety production, it is necessary to urge the company's principal, main project personnel and full-time safety officers to truly fulfill their post safety production responsibilities and ensure that the leadership shift system can be truly implemented.

5. Require all project departments and subcontractors to provide dynamic, publicity and learning materials about safety production according to the key points of safety production in different periods, and all functional departments of the company should actively cooperate to carry out safety production work.

6. The functional departments of the company should guide and assist the project department and subcontractors to improve the safety education management system for construction personnel, urge them to carry out safety education and training for employees, and improve their safety awareness and safety production skills.

7. All functional departments should provide guidance and assistance to the project department, and the subcontracting team should do a good job in collecting and managing safety management data in accordance with regulations, and often conduct periodic inspection and guidance on safety data.

8. When conducting safety inspection, the company shall follow the Safety Inspection Standard for Building Construction (JGGG59-2011) and the company's penalty rules. When there are major hidden dangers to the project department and the subcontracting team, a written notice of safety hidden dangers rectification shall be issued in time, requiring them to rectify in time; If the rectification is not timely or not in place, you can inform the general manager and project manager of the company.

The main person in charge of the subcontracting team has a meeting to talk and deal with it within a time limit.

9. The company should also assist and urge the project department and subcontractors to establish the project emergency management system and the preparation of emergency rescue plans according to the requirements of emergency management, and urge them to conduct emergency plan drills.

10. The functional departments of the company should control the use of the safety production facilities fee by the project department according to the Management Measures for the Safety Production Measures Fee of Construction Projects and the requirements of the general contract signed by our company and the construction unit, and use it for special purposes according to the progress, and handle work-related injury insurance for all construction personnel.

1 1. All project departments, professional contracting teams and labor subcontracting teams should strictly abide by the relevant labor protection laws, take all reasonable measures to prevent their workers from any illegal and disturbing public order, and require them to strengthen labor hygiene and health protection, strictly implement the employment system, and register the wages of workers in real-name registration system according to the relevant requirements of the state, province and city, and pay them on time.

12. Special cranes and special operators shall comply with Regulations on Management of Special Operators in Construction (J.J. [2008] No.75), Registration Measures for Construction Lifting Machinery (J.J. [2008] No.76), Regulations on Safety Supervision and Management of Lifting and Handling in Construction No.0/66 of Ministry of Construction, and Regulations on Construction Lifting and Handling. According to the Management Form of Safety Data of Construction Hoisting Machinery and other documents and regulations, the project department must sign professional subcontracts and safety agreements for leasing, erection, hoisting and dismantling with professional units with relevant qualifications of our company, and submit valid copies to our company for filing, and go to the mechanical testing center of the municipal safety supervision station for inspection and daily maintenance as required. When using mechanical equipment, you should abide by the relevant regulations on safe use and make safety disclosure to employees.

13. Various construction safety measures (schemes) and safety formulated by the project department and subcontractors.

All special plans and construction plans shall be examined and approved according to the relevant procedures of the company, and put on record for implementation as required.

14. The project department under construction is required to abide by the project inspection and internal acceptance system established by our company, and organize the establishment and implementation of the project site inspection system, and must submit the safety management information to the quality and safety management department of our company every month.

15. The Project Department will report the possible dangerous or harmful factors and their preventive measures in the construction process to our company for the record, and notify other construction parties on site to take preventive measures.

16. Each project department shall abide by the safety inspection standard for building construction (jggj59-2011) and other national or industry-related safety management laws and regulations, as well as the relevant safety evaluation standards of the competent department of our city, and fill in relevant safety records in combination with the provisions of information in our company's safety management, and sort them out and hand them over to the company within the specified time.

17. Does the project department have to seriously implement the fire control work? Prevention first, combining prevention with elimination? Based on self-prevention and self-rescue, I consciously abide by the fire prevention management regulations of our company on the construction site and do a good job in fire prevention on the construction site.

18. During construction, the project department should pay attention to protecting underground pipelines, high voltage and overhead lines and the environment. If there is any situation, you should contact the relevant departments in time and take the initiative to take corresponding protective measures.

19. The labor protection articles of the project department and subcontractors in the process of production and operation must comply with the relevant provisions of the state, and urge the field personnel to wear protective articles consciously.

20. Before the project construction, each project department shall conduct safety education for all personnel on site, and the technical director of the project shall conduct safety technical disclosure for all participants, and conduct safety technical disclosure and inspection according to the requirements of partial items in the construction process, so as to urge the construction personnel to strictly abide by and recognize it.

It was really executed.

2 1. At the same time, in principle, all project departments are required to report, investigate and handle accidents in strict accordance with the relevant provisions of Regulations and Investigation Report on Handling of Production Safety Accidents No.493 issued by the State Council Order of the People's Republic of China.

(2) From June 26th to June 30th, all departments and projects under construction of the company carried out hidden dangers investigation and management activities. After analysis, there are still some hidden dangers in the investigation of office staff in our company: people who ride non-motor vehicles sometimes don't wear or forget to wear helmets, motorcyclists sometimes drink and drive, and some people forget to turn off the office power switch and lock the door after work. The project department mainly has the following problems in the investigation of construction hidden dangers: safety protection and labor insurance supplies can not be implemented or purchased in time, which is lagging behind; The temporary electricity consumption on site is not standardized enough; The disclosure of construction safety measures is not serious enough and thorough enough; Some special construction schemes were not strictly implemented in the implementation process. In view of the main problems, the company requires all departments and project departments to conduct self-examination and self-correction, formulate rectification plans and implement rectification measures.

(3) From July/KLOC-0 to the end of September, our company adopts objective construction seasons such as high temperature in summer, typhoon prevention and lightning protection. As a reference, combined with Jian Dan Safety Supervision (20 13) 65438. Notice on immediately stopping all projects under construction and carrying out centralized inspection of safety production? He Anjian (20 13)No. 13? Urgent notice on doing a good job in heatstroke prevention and cooling? , organized and carried out four major inspections of the company's production safety. At ordinary times, there are also irregular inspections and supervision of the site by the functional departments of the company. The inspection is mainly carried out in accordance with the supervision rules formulated by our company, from two aspects: the safety account data and the safety status of the project site. Through inspection, it is found that the safety awareness of office workers in our company has changed greatly: they can be disciplined in driving, driving and departmental safety precautions.

Fan behavior; Functional department personnel have inspection records at the construction site; When major hidden dangers are found, a rectification notice is issued, requiring the project department to rectify within a time limit; At the same time, some major divisions, key processes, applications of new technologies and new materials, and heard and heard safety cases are also disclosed, analyzed and emphasized to the project department in time. The main inspection contents and parts of the project under construction are:

1. Whether the project construction procedure is legal, and whether its procedures and the project manager's practice activities conform to the Provisions on Further Strengthening the Management of the Construction Market in Our City (2065438+03) No.39. After investigation, all the projects under construction in our company have gone through the construction permit and quality and safety intervention procedures in advance according to the regulations, and the project manager can engage in practice activities within the prescribed scope and is only responsible for individual projects.

2. Whether the temporary houses and enclosures on site are firm. All the projects found to be unstable and not tightly closed were rectified.

3. Check the registration, reliability and sensitivity of limit devices and safety devices of cranes, such as tower cranes and construction cargo elevators, check whether their foundations have abnormal settlement, check whether the anchor bolts are loose, check whether the attached walls of cranes are firm and reliable, check the calibration of safety devices for preventing falling of construction elevators, and check the rotation and ropes of various machines and other main components. During the inspection, we asked the project department to temporarily close the entrance protection door of the construction elevator for people and goods in the 20# building of Xue Jia affordable housing and the 2# workshop of Gewitt Tools Co., Ltd. and install safety doors; Tian Hong Fishing Gear 1# Workshop site tower crane positioning requirements deviate from the high-voltage line beside the North Highway, limiting sports cars. At the same time, most of the rotating parts of the construction site and ropes that no longer work normally have been inspected and replaced. During the inspection of the R&D building of Runda Traffic Maintenance Company, we found that the subcontractor operated the construction freight elevator for unlicensed personnel. We stopped their behavior in time and issued a rectification notice within a time limit.

We also made a special inspection on the use of the towers in the first phase (the fourth bid section) of the Lotus Pond Community of Monroe Real Estate Development Company, and found that it met the requirements of the use specification.

4. In addition, the settlement of the scaffold wall, the foundation of the vertical pole, the closure of the safety net and whether the scaffold board of the operation layer is covered and fixed firmly are also checked. For the R&D building project of Runda Communications, because the subcontractor dismantled some scaffolding and wall parts without authorization during the external wall dry-hanging construction, our company and the relevant personnel of the municipal safety supervision station conducted many inspections, and urged the project department to restore the wall parts in time, thus avoiding accidents such as scaffolding overturning caused by too few wall parts.

5. Strictly compile and review the formwork construction scheme, and check the overall stability of the formwork support system, whether the vertical and horizontal support Rachel is firm, and whether the support base is firm, flat and firm. We are interested in the 3# workshop project of Wodeli Electrical Materials Co., Ltd. because it is located in ①? ⑤ The vertical shaft is 8m high, which is a very dangerous formwork support project. Our company made a special construction plan in advance, and then sent it to Danyang Civil Architecture Society for expert demonstration of high formwork. At the same time, the amendments put forward in the demonstration were revised and supplemented in time to ensure that the special construction plan can really guide the project construction. Full-time safety officers of the functional departments and project departments of the company can also conduct a detailed investigation on the support and base of the formwork after stormy weather. If there are too few walls, loose fasteners or local subsidence, they will also promptly remind the carpentry team leaders of various project departments to urge them to seriously rectify according to the rectification requirements.

6. Whether there is a special person to manage the temporary electricity consumption, whether there is a special person to test the sensitivity of the leakage protector, and check whether the repeated grounding is reliable or missing, and whether the cable has peeling and aging. When we inspected the site of 3# workshop of Kexin Optoelectronics Company, we found that the company had

The rented workshop staff temporarily connected some wires in the secondary distribution box on the construction site due to the need of electricity, resulting in one wiring device connecting multiple wires. Our company requires the project department to dismantle it in time. If similar situations are found again, the project department will be fined and shut down, and the project department will carry out rectification. When we checked the teaching building project of Jianshan School, we found that a cable outside the west foundation (passing through the school canteen) was exposed in the foundation. Our company also asked the project department to protect and overhead the cable in time to avoid being damaged by foundation construction or causing accidents such as electric shock.

7. In view of the 40-day continuous high-temperature construction from July to August this year, our company not only distributed some heatstroke prevention and cooling drugs, but also frequently checked whether the project department received the notice from Jian Dan Safety Supervision (2065 438+03) 13: do a good job in heatstroke prevention and cooling, and urge the project department not to work continuously at high temperature; Do not arrange outdoor overtime in high temperature season, grab both ends and rest in the middle to ensure that there are cool and refreshing drinks such as mung bean soup and tea every day; The temporary living facilities on the construction site should be safe, ventilated and sanitary, and provide a good rest place or living environment for the construction personnel; For some high-temperature operations, some young people with good physical fitness are selected to carry out the work, and at the same time, all construction sites are required to strictly control the operation time; At the same time, it also checks the hygiene of the staff canteen and asks to buy fresh vegetables to prevent food poisoning and infectious diseases.

8. From September 20th to September 30th, our company carried out a major inspection of production safety, mainly from the aspects of employees' safety awareness, site entrance boundary protection, temporary electricity consumption and the use of machinery and equipment. After investigation, most of the projects under construction can be standardized, and very few construction sites have not attracted enough attention in concept. Our company will pay attention to the projects and project managers who have performed well this time. Activity plan? Commend and notify the company; On the other hand, for the construction site with outstanding problems and major hidden dangers, the project manager should be educated about informed criticism and fines.

? Security check? Although the curtain has fallen, but the safety work is still? We have a long way to go, and our company will strengthen it? National day? 、? Winter? During the period of safe production, carry out in-depth safety management, civilized construction and normalization inspection on the construction site, conscientiously implement various special rectifications carried out by provincial and municipal authorities in the field of engineering construction, and adhere to the principle of? Safety first, prevention first and comprehensive treatment? The in-depth development of safety production standardization has fundamentally improved our company's safety production, safety technology, equipment management and system construction. , further improve the enterprise safety production guarantee system, so as to comprehensively improve our company's construction safety production level and effectively prevent and contain the occurrence of construction safety production accidents.

Jiangsu xinxi construction engineering co., ltd

Implementation Plan III of Building Safety Inspection

With what? Theory of Three Represents theory? Guided by important thoughts, adhere to? Safety first, prevention first? Policy. Taking the opportunity of publicizing and implementing the Regulations on the Administration of Work Safety in Construction Projects, we will focus on the implementation of the responsibility system for work safety and the supervision and management of work safety. In-depth development of civilized construction site creation activities, strengthen the safety management of the construction site, increase the intensity of spot checks and inspections of production safety, and ensure the full implementation of production safety work.

The main objectives of the county's construction safety production work are:

1, according to the "Building Safety Inspection Standard" issued by the Ministry of Construction, the qualified rate of construction sites of construction enterprises reached 100%.

2. According to the Interim Provisions on the Administration of Safety and Civilized Construction Sites in Anhui Province, more than three standardized construction sites for safety production will be established to drive the county's construction sites to meet the standards.

3, put an end to the use of cranes designated by relevant state departments.

4, reduce the general accidents in construction projects, curb the occurrence of major accidents above level 3, and put an end to serious accidents. In order to achieve the above objectives, we will focus on the following aspects:

First, conscientiously publicize and implement the "Regulations" and strengthen the safety work of construction projects according to law.

"Regulations" is the first administrative regulation to regulate the safety production of construction projects in China, which is of great significance for strengthening the safety production of construction projects according to law. In order to do a good job in the publicity and implementation of the regulations, further improve the safety production management level of the construction system in our county, and enable the broad masses of cadres and workers to deeply understand the spirit of the regulations, the Construction Committee should actively carry out publicity and make full use of newspapers, internet and other news media for extensive publicity. All units should conscientiously formulate and implement the work plan of the Regulations, and enterprises should hold multi-level and multi-form training courses. In particular, the construction industry and engineering supervision enterprises should carry out all-staff learning activities according to the actual situation, focusing on pre-job training and education for front-line workers.

Second, fully implement the responsibility system for production safety.

The establishment and implementation of the responsibility system for production safety in enterprises is a key point in the inspection of production safety in 2009. All enterprises should establish and improve the strict responsibility system for production safety and implement it step by step. At the same time, we should work hard on the implementation of the responsibility system, constantly explore and formulate implementation methods that meet the characteristics of enterprises, so that the responsibility system for safe production can be truly implemented.

Three. Further intensify inspection, supervision and punishment.

In 2009, we will continue to extensively carry out activities to meet the safety standards of construction sites and create civilized construction sites. At the same time, change the focus and methods of work, from focusing on the supervision and inspection of the entity safety in the process of enterprise construction to focusing on the establishment and implementation of the enterprise safety responsibility system, as well as the implementation and enforcement of laws, regulations and standards on safety production; From informative inspection to spot check. Spot checks and inspections are carried out continuously throughout the year to implement the work of safety in production. Inform all units and persons responsible for major accidents within the county, and take the evaluation results of safety production conditions as the basic conditions for the annual inspection of enterprise qualifications and the promotion of qualification level. The one-vote veto system will be implemented for enterprises with major safety accidents, and the accident-prone enterprises and responsible persons will be severely punished according to law until the construction market in Jixi County is cleared.

Fourth, do a good job in safety education and training.

Do a good job in safety training and education, and organize the training, assessment and certification of the main responsible persons, project managers and full-time safety production management personnel and special operations personnel of construction and engineering supervision enterprises; Organize and train the "Regulations" formulated by the Ministry of Construction and the "Safety Production Evaluation Standard for Construction Enterprises"; Guide enterprises to carry out safety production training for all employees and training for new workers and workers to change jobs; Actively coordinate relevant departments to carry out vocational skills appraisal of migrant workers, and at the same time carry out safety knowledge and safety skills training.

Five, continue to deepen the special rectification of production safety, focus on solving multiple accidents and outstanding problems.

In 2009, the focus of special rectification was system construction, improving the establishment of safety technical scheme demonstration, making a fuss about strictly implementing standards and technical schemes and effectively controlling key links, so as to achieve the goal of treating both the symptoms and the root causes. First, it emphasizes the implementation of the responsibilities of all parties, focusing on the implementation of the responsibility system of examination and approval, acceptance and inspection. The second is to see if there is any plan for earthwork excavation, deep foundation pit support and ground.

Whether the technical schemes of underground excavation engineering, dewatering engineering, tall formwork engineering, overweight hoisting and scaffolding engineering have been demonstrated and reviewed, and the technical schemes demonstrated and reviewed shall not be changed at will. Third, strict acceptance and inspection of construction and supervision, especially key links and key contents, to ensure the implementation of standards and norms.

Six, do a good job in the construction enterprises and equipment leasing enterprises special equipment registration, licensing and installation and removal of enterprise qualification examination and approval, supervision and guidance of special equipment testing institutions in accordance with the law of housing construction special equipment testing. Do a good job in the safety supervision and management of demolition projects, and strengthen the qualification management of demolition teams and the review of demolition plans.

Guess you like:

1.20 17 safety inspection implementation plan

2.20 17 safety inspection scheme

3. Safety inspection implementation plan

4. Annual work plan for production safety inspection

5. Safety production implementation plan

6.20 17 safety inspection plan