Electrical contracting contract

In today's society, people pay more and more attention to contracts, and more and more people mediate civil relations through contracts, which is also an important measure to reduce and prevent disputes. There are different types of contracts, of course, they also have different purposes. The following is a sample contract for electrical contracting, which I have compiled for you. You are welcome to learn from and refer to it. I hope it will help you. Electrical contract 1

Party A:

Party B:

In accordance with the Contract Law of the People's Republic of China, the Construction Law of the People's Republic of China, the Labor Contract of the People's Republic of China and other relevant laws and administrative regulations, the responsibilities are defined. Both parties sign this contract on the principle of voluntariness and mutual benefit.

1. General situation of the project, contract content and price:

1.1 Project name:

1.2 Project location:

1.3 Project structure: construction area is about M2. (subject to the actual area)

1.4 Contract work contents: lighting system: contents included in construction drawings such as pipeline reservation and embedment, threading, lighting lamps, sockets, switches, distribution boxes and meters, lightning protection and grounding installation and debugging; power system: contents required by construction drawings such as pipeline and bushing reservation and embedment, cable tray installation, cable laying, and power distribution equipment installation and debugging. Weak current system (TV, telephone, broadband, etc.): reserved and embedded pipelines and sleeves, reserved and embedded pipelines of fire fighting system, installation and debugging of emergency lighting.

1.5 contract price: 18 yuan /m2 (excluding temporary electricity) 18.5 yuan /m2 (including temporary electricity) (calculated according to construction area).

1.6 contract method: labor cost, auxiliary materials (iron wire, nails, insulating tape and plastic tape, etc.), tools (hand-held electric tools and steel tape, marking pen, line pressing pliers, etc.), package quality, package safety, package construction period and package civilized construction

1.7 payment method:

1. Pay or borrow according to the progress of the project image.

2. When Party B receives or borrows the project progress payment, it shall truthfully provide the payroll roster for employees. When I receive the salary, I must sign it myself for confirmation. I can't receive it on my behalf, and I can't misappropriate the artificial salary without permission. If the contractor is found to misappropriate the artificial salary, Party B shall bear all the responsibilities by itself.

II. Rights and obligations of both parties to the contract:

1. Party A is responsible for the supply of main materials.

2. Party B must carry out the construction according to the design documents, current construction and acceptance specifications, construction organization design, construction technical disclosure and safety disclosure requirements. Report material quality problems found in construction in time.

3. Party B shall put forward a material plan one week in advance, and the material plan shall be accurate. Party A shall supply materials according to the material plan provided by Party B. If the actual usage exceeds Party B's material plan, Party B shall be responsible for the excess, and Party A shall have the right to deduct the excess material cost from the project contracting fee.

4. party b is responsible for the establishment, maintenance and dismantling of temporary electricity facilities on site. All kinds of electrical holes are reserved and blocked.

5. The incoming materials shall be checked and accepted with Party A's keeper (including model and specification), and the quality problems, models and specifications of the materials shall be reported in time.

6. Party B shall be responsible for unloading and warehousing the mobilization materials, and cooperate with Party A in keeping the mobilization materials. Avoid loss and damage.

III. Time limit:

Organize the construction on time according to the time limit specified by Party A, and complete the construction from the actual commencement date to the time limit specified by Party A..

iv. responsibilities of party a:

1. technical and safety disclosure to party b. Provide temporary warehouse for Party B at the construction site.

2. Be responsible for providing a set of construction drawings and relevant design change notices.

3. Allocate the project payment to Party B according to the progress of the project.

4. supervise and inspect party b's quality, safety, progress, use of materials and machines, and put forward rectification requirements for the problems, and punish them according to the seriousness.

5. Be responsible for the overall progress of the project and the progress coordination of all subcontractors, responsible for relevant project meetings, and coordinate the contradictions in the construction of all cooperative units.

6. check the operation of party b's construction equipment, the storage and use of materials at any time, and check the valid certificates and certificates of party b's on-site management personnel and operators. When Party B violates the regulations or fails to meet the required standards, Party B is required to make rectification and repair.

V. Responsibility of Party B:

1. Party B shall carefully check the construction drawings provided by Party A, and shall be obliged to point out the possible defects and omissions in the construction drawings provided by Party A and inform Party A of the errors and omissions found in the drawings in time before construction to avoid losses, otherwise, all changes caused by Party B's unfinished responsibilities during the construction process will not increase the cost.

2. When entering the construction site, Party B's construction personnel must obey Party A's safety and production management, unified management and command, abide by various rules and regulations, and put an end to illegal construction.

3. Strictly implement Party A's technical disclosure, carry out construction according to disclosure and design practices, and carefully understand and implement Party A's disclosure and notice (including oral notice).

4. strictly abide by the management systems of party a's construction site, and accept party a's reasonable punishment for the construction period, quality, safety, civilized construction and the use of materials and machines.

5. Party B must establish a sense of economy, so that the site will be cleared after work. Party A will impose a fine on Party B according to the actual situation.

6. Party B shall immediately rectify the rectification requirements and notices put forward by the supervision company and Party A without negative delay. If Party B fails to carry out rectification and rectification after Party A puts forward the problem, Party A will impose a fine of not more than 511 yuan on Party B according to the seriousness of the case. If the case is serious, Party B will clear the scene, and Party B must organize sufficient and high-quality labor to carry out the construction. Party B must replace the poor-quality labor in time after Party A puts forward it.

7. Party B must ensure safe and civilized construction, organize the construction in strict accordance with Party A's requirements, and workers must wear safety helmets. Seat belts must be used correctly when working at heights. Materials should be piled up carefully, and garbage should be cleared in time. For Party B's violation of operating rules and site management requirements, Party A will punish Party B according to the seriousness of the case: a fine of RMB 111 per person for not wearing a safety helmet, and a fine of RMB 111 for not carefully stacking materials to ensure the creation of a civilized site.

8. if party a finds potential safety hazards during the construction, it shall promptly propose rectification to party b. if party b fails to make rectification, party a has the right to stop work. Party B's violation of safety operation rules and relevant regulations and savage construction cause casualties at its own risk.

9. Party B must implement Party A's progress plan. If it cannot be completed on schedule due to Party B's reasons, 511 yuan will be fined for each day of delay.

11. Party B's personnel must submit the roster of personnel entering the construction site of Party A for filing within 7 days, and each person shall submit two 1-inch color front photos and a copy of ID card; And ensure that the workers entering the site have no criminals. Be responsible for all the responsibilities that arise at your own risk. Party A does not recognize the working relationship of those who fail to submit the roster, photos and ID cards to Party A.. According to Party A's requirements, organize enough construction personnel who have passed the training and obtained the post operation certificate for some special jobs to enter the site.

11. Party B is not allowed to gamble, drink too much or fight at the construction site. Party A will impose a fine of RMB 1,111 on Party B every time it happens. If there is a fight with other subcontractors, if the circumstances are minor, the responsible party will be fined 1111 yuan each time, and the public security organ will handle it in violation of the law, and the project department will not bear any responsibility.

12, ensure the cleanliness of the working face and the construction site, and achieve Nissin; After the completion of the project, the turnover materials, tools, machinery and equipment of the project will be removed. Do a good job of protecting semi-finished products and finished products before the completion of the project, and be responsible for repairing the damage caused. (especially the damage to the plastered wall caused by changing the line) Participate in the completion acceptance, be responsible for the defects raised during the completion acceptance, and make free repairs until the completion acceptance is qualified.

VI. Liability for breach of contract:

1. If Party B breaches the contract, it shall be responsible for repairing or reworking the works that do not meet the requirements free of charge until they meet the requirements, and bear the losses or responsibilities caused thereby. If the acceptance fails to meet the quality requirements due to Party B's construction, each single project shall be deducted from the labor cost according to the actual loss value. If the completion of a single project is delayed, 511 yuan will be fined for each day of delay.

2. During the construction, the quality of Party B's team is too low to meet the requirements of the construction contract, the construction period can't be guaranteed, and there are few skilled workers. When the project quality and construction period can't meet the requirements, Party A can ask Party B to leave at any time, and can't ask Party A to increase the price or stop work during the construction, otherwise Party A has the right to change the construction team, and Party A can only settle accounts at 61% of Party B's workload.

3. Party B shall prepare sufficient labor force when entering the construction site, so as to ensure that the labor force is not affected by seasons and holidays. In case of stoppage due to labor shortage or other reasons, Party A has the right to terminate the contract at any time. When Party B gives up completing the contracted content of this project, Party B shall bear the economic consequences caused thereby, and Party A will only pay Party B 61% of the completed project amount.

4. If Party B subcontracts the project and Party B's personnel do not obey Party A's transfer arrangement, and the technology, quality, progress and safe and civilized construction fail to meet the requirements of this contract, or violate the law, violate the rules or steal, damage Party A's machines, facilities and waste materials, Party A has the right to unilaterally terminate the contract; If Party B's personnel do not leave after the termination of the contract and make trouble, Party B must bear all the economic losses and related responsibilities caused by this.

VII. Construction quality

1. According to the national engineering quality inspection and evaluation standards, all the projects within the scope of work of this contract must meet the qualified standards, and the engineering quality shall be subject to the acceptance of Party A and the supervisor;

2. Party B must carefully organize the construction in strict accordance with the construction acceptance specifications, design drawings and relevant requirements to ensure the realization of quality objectives. If the parts fail to meet the quality standards, Party B shall repair them in time as required by Party A until the quality requirements are met.

3. If both parties disagree with the project quality, the project quality supervision department will make a ruling. The arbitration fee and the losses caused thereby shall be borne by the responsible party.

4. quality inspection: when completing the agreed project, Party B shall seriously follow the requirements of standards, specifications and design and the instructions issued by Party A's representative, adhere to the system of self-inspection, mutual inspection and handover inspection, provide convenient conditions for inspection, accept the inspection and inspection of Party A and quality inspection departments at all levels at any time, rework and modify as required, and bear the expenses of rework and modification caused by its own reasons.

5. Acceptance of concealed works: Party B shall notify Party A to organize the acceptance 24 hours before the acceptance after passing the self-inspection. After the acceptance by the supervision company, the concealed works can be carried out and the construction can be continued only after the acceptance record is signed. If the acceptance does not meet the quality requirements, Party B shall carry out the self-inspection of repair according to the rectification opinions put forward by the acceptance, and notify the acceptance again after passing the inspection. Party B shall bear the repair expenses, and shall not conceal itself without acceptance. If it does, Party B must peel and open its mouth according to the acceptance requirements of Party A or relevant units, be responsible for recovery, and bear the expenses and losses arising therefrom.

VIII. Safety and civilized construction:

1. For the construction according to the current safety inspection standards and civilized construction standards on site, Party B must wear the labor protection articles required for entering the site according to the regulations, and the safety helmet and safety belt required for working at height are collected from Party A, and returned to Party A in full after the completion of the project. If Party B is lost, Party A shall compensate at the original price. If Party B fails to wear the labor protection articles according to the regulations and uses them correctly, Party A has the right to impose penalties, and all the fines shall be paid by Party B manually.

2. Party B must carry out the construction in a civilized and safe manner. During the construction process, on the way to and from work, and on the construction site, Party B shall be entirely responsible for any major or minor safety accidents, and Party A shall not be responsible for any expenses or responsibilities. The person in charge of Party B must stick to the construction site, otherwise, Party A has the right to fine 511 yuan for one day of absence. (No penalty without affecting the consent of work leave).

IX. Logistics:

Party B shall be responsible for its own accommodation, and Party A shall not bear the expenses.

X. Others:

1. If there are any matters not covered in the contract, both parties shall settle them through friendly negotiation. When both parties fulfill their full obligations and the labor remuneration is paid, other terms will be terminated except the warranty terms. After the warranty period expires, the warranty matters are completed and the warranty money is settled, the relevant warranty terms are terminated.

2. Party B must read and abide by the Project Quality Warranty Agreement.

Xi. dispute resolution: if both parties fail to reach an agreement, they may submit the dispute to the arbitration commission in the place where the contract is signed or bring a lawsuit to the local people's court.

This contract is made in triplicate, with Party A holding two copies and Party B holding one copy, and both parties shall sign it, which has legal effect.

Party A:

Party B:

Date of signing: Contract for electrical contracting 2

Employer (hereinafter referred to as Party A):

Contractor (hereinafter referred to as Party B):

To ensure the project quality, it will be completed on schedule. Following the principles of equality, voluntariness, fairness and good faith, both parties reached the following agreement through negotiation:

1. Project overview:

1. Project location: Yijing West Street, Taiyuan City

2. Project name: multi-storey residential building of Shanxi Institute of Chemical Technology

3. Project structure: frame-shear structure

4. Construction area:.

2. Scope of contract

1. Construction project: all installation works of contracting and packaging machinery (all machinery and hand tools needed for installation works) such as water supply, drainage, heating and electrical lightning protection and grounding, and all reserved holes, reserved holes and sleeves for fire fighting.

2. Party A will contract out to Party B in the form of labor contract and material package machinery. If the contract is dead at one time, Party B will organize the purchase of materials by itself, and submit the inspection report and certificate of main materials to Party A before construction. Construction can only be started after approval. (Party B includes all water heating and electricity test fees) Water supply and drainage, heating, electrical and lightning protection and grounding contracting and material installation works, including all contents of design and joint review drawings.

III. Commencement and completion date

21xx starts on August 5th and is completed on May 5th.

iv. contract price and payment method

the contract is contracted out to party b for construction at the price of xx yuan. payment method: after the completion of the three-story structure, party a will pay the contractor 1.15% of the total contract price with the construction area (heating, water and electricity contracting) per square meter

, and 25% of the total contract price after the acceptance of the main unit project, and the pipeline project (including