Safety and civilized construction guarantee 1 project name: _ _
General contractor: (hereinafter referred to as Party A)
Employer: (hereinafter referred to as Party B)
Project location: _ _ _ _ _ _ _
In order to implement safety management measures and ensure the safe and orderly implementation of the project, Party B made the following commitments during the project construction:
(a) Before the start of work, safety education must be given to subordinates, and safety precautions and measures should be disclosed. Personnel without safety education are not allowed to enter the workplace.
(2) Educate its own construction personnel to strictly abide by Party A's safety and security rules and regulations and various construction technology specifications, and consciously obey the on-site safety management of Party A's project management director and security personnel.
(3) Strictly abide by the safety production rules and regulations, consciously accept the safety supervision, management and guidance of Party A's unit, and do a good job in safe and civilized construction.
(4) All construction personnel entering and leaving the site must wear temporary passes issued by Party A's security department and accept the supervision and inspection of Party A's management personnel.
(5) Implement the construction progress. If the construction is carried out outside the planned time (Party A's abnormal working hours), an application shall be made to Party A's project leader in advance and reported to Party A's security department for approval and filing. Except for approved special circumstances, all construction personnel shall leave the site before 19: 00 every day.
(six) do not engage in any form of commercial activities in the construction site.
(seven) consciously protect the property of the construction site and fire, electrical appliances, network, public facilities, decoration and other equipment and facilities in good condition.
(8) With the consent of Party A, temporary electricity, water and hot work laid in accordance with relevant safety specifications shall be equipped with safety facilities such as leakage protection and fire prevention, and wires shall not be connected without authorization.
(9) For complex and dangerous engineering projects, separate safety technical measures shall be formulated and implemented after being examined and qualified by Party A's unit.
(ten) shall not be arranged without the relevant departments of the training and assessment of undocumented personnel engaged in special types of work.
(1 1) When working at high altitude, safety protection must be carried out under or above the working platform, and special personnel shall be assigned for supervision. Personnel must wear safety belts and helmets correctly, and scaffolding or ladders must be safe and reliable, with anti-dumping measures. (12) Keep the construction site clean, do not pile up construction sundries everywhere, and properly place flammable materials for construction.
(13) Don't talk loudly, make noise, boo and fight. At the construction site.
(fourteen) not smoking, drinking, gambling and uncivilized behavior that affects others at the construction site.
(15) Do not stay at the construction site. In case of special circumstances, it must be approved by Party A. ..
(16) If a safety accident occurs due to our reasons, we will bear all the consequences.
(17) If the above commitment is violated, we agree to deduct relevant expenses from the final accounts of the project.
Unit name:
July XXX 14
Guarantee of Safe and Civilized Construction 2 In order to successfully complete the construction task of the sixth bid section (Fengtai No.8 Middle School) of the second batch of 20xx school building safety project, we guarantee as follows:
Article 1 The construction site shall be fenced neatly, and set up frontage and important parts according to the requirements of the construction unit, and ensure safety and beauty. The content of the construction slogan should be recognized by the construction unit. The site layout is reasonable and tidy, free of weeds, stagnant water and peculiar smell, and the roads in the site must be kept clear; All kinds of materials should be piled up neatly, and construction waste should be piled up at fixed points and removed in time. It is forbidden to pile up materials and garbage outside the construction site.
Article 2 Noise and lighting control should be considered in the layout and process arrangement of the construction site, and it should be strictly implemented in accordance with the relevant regulations of Beijing to avoid disturbing people. Special toilets must be set up on the construction site and managed by special personnel. Do not urinate at will. Life, production waste water and construction waste water are unqualified, and shall not be discharged into the school sewer; Don't destroy the trees and green spaces on campus; In the process of earthwork transportation, the procedures should be strictly followed, and it is not allowed to spill inside and outside the school. At the same time, measures should be taken to avoid dust.
Article 3 Foreign construction personnel must hold relevant certificates, and it is forbidden for non-construction personnel to spend the night at the construction site. It is forbidden to gather people at the construction site to play cards, drink and make trouble, and spread obscene articles. Construction personnel are prohibited from walking around in non-construction areas at will, and conflicts with students and faculty are prohibited.
Article 4 Construction vehicles should pay attention to campus traffic safety when entering and leaving Fengtai No.8 Middle School, and must drive slowly. Large machinery should negotiate with the construction unit in advance to avoid the campus traffic peak. When the road construction must be closed, the consent of the construction unit must be obtained, and obvious warning signs should be set at the intersection.
Article 5 Temporary electricity consumption on the construction site must conform to the Technical Specification for Safety of Temporary Electricity Consumption on the Construction Site. The fixed distribution box should be fenced with obvious safety warning signs. Non-professionals are forbidden to connect and disconnect wires to prevent electric shock accidents. It is forbidden to use electric appliances such as electric furnaces that hinder site safety.
Article 6 Fire fighting equipment such as on-site fire hydrants shall be fully equipped, in a reasonable position, with obvious warning signs, and it is strictly prohibited to misappropriate them to ensure the smooth flow of fire fighting roads; Smoking is strictly prohibited in the construction site, and there must be a special person responsible for the management of toxic, flammable and explosive materials and hot work in construction.
Seventh site construction personnel must dress neatly, wearing badges, it is forbidden to enter the construction site; You must wear a safety helmet (red is the owner's special color) when entering the construction site, and you must fasten your seat belt when working high above the ground. Workers are forbidden to work under the influence of alcohol, climb scaffolding or throw objects down when working at height.
Article 8 The installation of scaffolding, foundation pit support, tower cranes, elevators and other large-scale machinery must have a construction plan approved by the superior safety department, and all kinds of construction machinery's certificates, inspection certificates and safety protection devices are complete, so as to prevent all construction safety accidents such as falling objects and earth collapse.
Article 9 The staff canteen must be clean and tidy, free of flies and rats, with complete licenses for operators, and conscientiously implement the relevant provisions on food hygiene and safety to prevent food poisoning for staff; The dormitory of construction personnel should be clean and tidy, and it is forbidden to pull wires at will to keep warm in winter to prevent workers from gas poisoning.
Article 10 The construction unit shall have management personnel specially responsible for on-site safe and civilized construction, who shall conduct regular inspections and make timely rectification when problems are found; Other issues related to safe and civilized construction put forward by the construction unit must be actively cooperated and seriously implemented.
If there is any violation of the above terms, our unit is willing to accept any punishment from the project department and bear all civil or criminal responsibilities arising therefrom.
Guarantor:
Person in charge of the unit (signature):
Date:
Safe and civilized construction guarantee 3 1. Actively participate in publicity and education activities on safety production and civilized construction, consciously carry out and actively participate in publicity and education activities on safety production and civilized construction, and implement the policy of "safety first, prevention first".
Safety first, prevention first. "
2. Study hard, strictly implement safety laws and regulations, study safety in production seriously, strictly implement safety laws and regulations and technical disclosure of all employees, and require everyone to correctly use technical disclosure of personal safety and personal protective equipment.
Protective equipment.
3. Abide by the responsibility system for production safety, safety operation rules and safety production management system, abide by the responsibility system for production safety, safety operation rules and standards, obey safety guidance, maintain all safety fire control facilities on site, and set fire signs and all safety fire control signs on site.
Shall not be dismantled, altered or misappropriated without authorization.
Signs, signs.
Shall not be dismantled, altered or misappropriated without authorization.
transfer
4, special type of work operators must hold relevant certificates, abide by post regulations, special type of work operators must hold relevant certificates, fan.
5. Strictly implement the laws and regulations on safety fire control, strictly implement the system of safe electricity consumption and fire control, and strictly implement the system of safe electricity consumption and fire control equipment.
Don't use fire fighting equipment at will.
Fire?Extinguisher?
6. Colleagues should unite and cooperate, help each other and supervise each other, so as to achieve "three no harm, unity and cooperation among colleagues, help each other and supervise each other" (no harm to themselves, others and others).
Hurt "don't hurt yourself, don't hurt others, and don't hurt others."
7. Abide by rules, regulations and disciplines, and have the right to stop others from directing or operating illegally or refuse to direct, operate illegally or direct illegally.
Chapter command.
8, do a good job in the construction site, living quarters, dormitory hygiene and food hygiene, prevent diseases, do a good job in the construction site, living quarters, dormitory hygiene and food hygiene, prevent diseases and food poisoning on the construction site.
Disease and food poisoning.
9. Report potential safety hazards in time, and evacuate the site in time or take decisive and effective measures in case of distress.
Effective measures.
10, seek truth from facts, and put forward reasonable suggestions conducive to safe and civilized construction.
The above ten articles are guaranteed to be observed.
Unit: Date:
Security and civilized construction guarantee 4 1. Actively participate in publicity and education activities on safety production and civilized construction, and consciously implement the policy of "safety first, prevention first".
2, study hard, strictly implement the laws, regulations, systems and safety technical disclosure of production safety, so that everyone can use personal safety protection articles correctly.
3, abide by the responsibility system for production safety, safety operation procedures, safety production management system, obey the safety guidance, and maintain all safety fire control facilities and safety signs and signs. Shall not be dismantled, altered or misappropriated without authorization.
4, special type of work operators must hold relevant certificates, abide by job specifications.
5. Strictly implement fire safety laws and regulations, strictly implement the system of safe use of electricity and fire, and do not use fire-fighting equipment at will.
6. Colleagues should unite and cooperate, help each other and supervise each other, so as to achieve "three no harm" (no harm to themselves, no harm to others, no harm to others).
7. Abide by rules and regulations and discipline, and have the right to stop others from directing, operating or refusing illegal command.
8, do a good job in the construction site, living quarters, dormitory hygiene and food hygiene, to prevent diseases and food poisoning.
9. Report potential safety hazards in time, and evacuate the site or take decisive and effective measures in case of distress.
10, seek truth from facts, and put forward reasonable suggestions conducive to safe and civilized construction.
Letter of Guarantee for Safe and Civilized Construction 5 In order to further implement the Safety Production Law, Regulations on the Administration of Safety Production in Construction Projects and other laws, regulations and rules, and ensure the safety of construction production on the project site, I, as the first person in charge of project safety, am fully responsible for the safety work, and hereby solemnly promise as follows:
1. Strictly abide by national laws and regulations, adhere to the safety production policy of "safety first, prevention first, comprehensive management", earnestly implement the responsibility system for safety production of personnel at all levels, and strive to achieve controllable, controllable and controllable safety production.
The second is to establish and improve the safety production guarantee system and supervision system, improve the safety production command system, improve the safety management and assessment system, formulate key requirements and measures to achieve the annual safety production work objectives and follow up.
Third, do a good job in the analysis and pre-control of dangerous points, vigorously carry out standardized operations, scientifically analyze the safety situation at the project site, find out the weak links and hidden dangers of accidents, and take effective preventive measures in time.
Four, to ensure the full investment of funds needed for safety in production, focusing on the extraction and use of funds needed for anti-accident measures and safety technology and labor protection measures plan (hereinafter referred to as the "two measures" plan), the establishment of safety production incentive fund, to ensure the extraction and use of funds needed for safety incentives.
Five, in accordance with the "Regulations on the Administration of Work Safety in Construction Projects" and other laws and regulations and the requirements of relevant industry safety standards, formulate construction plans and preventive measures, effectively protect dangerous parts of the construction site, put an end to illegal command and operation, and ensure that all parts and links of the construction site meet safety requirements.
6. Organize regular safety work meetings, analyze the shortcomings and problems existing in safety work, and formulate corresponding rectification measures and management plans; Organize regular internal safety inspections, and timely organize rectification for problems found by superior units, owners, supervision units and internal inspections.
Seven, organize employees to participate in safety education and training on a regular basis, improve the safety awareness of employees, ensure that employees are familiar with the rules and regulations related to safety production and safety operation procedures, and master the safety operation skills of this position.
Eight, formulate emergency plans for major casualties, equipment damage and other safety accidents, establish a systematic, hierarchical, consistent, clear division of labor and coordinated emergency system for safety accidents, and organize their implementation.
Nine, the investigation and handling of major accidents, strictly implement the principle of "four pass".
For major or typical accidents, timely grasp the accident situation, hold a special accident analysis meeting, put forward measures to prevent accidents from happening again and conscientiously implement them.
Ten, strengthen the construction of enterprise safety culture, closely around the situation of enterprise safety production, carry out ideological and political work, take various vivid and effective forms to educate employees on safety thought, professionalism and discipline, so that employees can establish a firm "safety first" thought.
Guarantor (official seal):
Signature of the first person in charge of safety:
Signature of other members of the leadership team:
Guarantee time: year month day.
Authorized unit of guarantee (official seal):
Signature of the first person in charge of safety:
Date of approval: year month day.
The guarantee of safe and civilized construction 6. The guarantee of construction safety and construction quality of building projects cannot be separated from civilized construction. In order to realize civilized construction, our company has formulated the following measures according to the relevant regulations of the state and Liuzhou City, and guaranteed to carry out the construction according to the formulated measures.
A, civilized construction management measures
1, conscientiously implement the notice spirit of xxNo. Xx city construction site management regulations (for Trial Implementation) and current construction safety inspection standards.
2. The construction site is closed with dense mesh. Do a good job of underground pipeline protection in the construction site, achieve civilized construction, and put an end to major safety accidents.
3. Site construction must be "two-way, three noes and four musts". Two-way means that the driveway and sidewalk of the construction site are unblocked, and the entrance and exit of the factory should be kept unblocked. Three "none" means that there is no accident of damaging underground pipelines on the construction site, no accumulated water on the construction site and roads, and no "yellow, gray and white dragon" pollution on the construction site. Fourth, the construction area and non-construction area must be strictly separated, and specific measures should be marked with signs of construction area and non-construction area. The isolation method can adopt a complete set of isolation fences. Construction personnel must hold relevant certificates and do a good job in pre-job education. Construction materials must be neatly stacked, the measurement is guaranteed, and the production and living environment on site must be clean, civilized and conform to sanitary conditions.
4. Set up the enterprise logo gatehouse at the entrance of the construction site, and post the eye-catching "one map, three certificates and five cards" (construction plan, planning, construction, safety permit, general situation of the project, list of management personnel and supervision telephone number, fire protection, safety production and civilized construction cards).
5, all kinds of materials piled up according to specifications, all kinds of mechanical equipment and parts, non-standard products have obvious signs. Sand and gravel shall be piled up with loaders in time, steel bars shall be listed and piled up neatly according to specifications and varieties, all kinds of scattered materials shall be sorted and concentrated in time, temporarily unused equipment, facilities and materials shall be recovered and put into storage in time, and the turnover materials after construction shall be cleared and piled up in time.
6, mixing station hanging mortar, concrete signs, where there is equipment hanging operation procedures.
7. Get off work in time before work every day. Vehicles and trucks transporting residual soil and construction waste should be properly closed to prevent road pollution. The dumping site shall be implemented according to the requirements notified by the supervision engineer, and it is forbidden to dump it indiscriminately.
8. Set up temporary facilities, mechanical layout, stacking of building materials, laying of water and electricity lines, etc. In strict accordance with the general layout, timely drainage of temporary roads and sites, keep the site clean and not muddy. Temporary power lines are used for corridor protection, and it is strictly forbidden to pull and connect wires and hang items.
9. According to the requirements of the schedule, reasonably arrange the construction time and try to avoid construction at night. If the process requires continuous construction, obtain the consent of Party A, minimize the noise generated by construction machinery, and do a good job in explaining and guiding the surrounding residents in advance.
10, drinking, talking loudly, fighting and making trouble at the construction site are strictly prohibited. Once it happens, it will be punished in strict accordance with the Regulations on the Administration of Public Security on Construction Sites.
1 1. The construction site shall be uniformly equipped with flush toilets, and all construction personnel shall not defecate anywhere.
12. Often send someone to clean and sprinkle water on the pedestrian lane of the construction site to reduce dust pollution. The construction site should be uniformly equipped with appropriate garbage bins, and the garbage should be cleaned up in time and transported to the designated place for burial or incineration.
Second, the site safety measures
1, improve the organization.
Select personnel with good political quality, high professional level, high policy level and strong working ability to form the on-site security department. Set up ministers, deputy ministers, public security, fire protection and traffic safety professionals to be fully responsible for on-site safety work. The project department and subcontractors of the secondary company set up corresponding institutions, equipped with complete security personnel, and form systematic management.
2. Establish and improve various rules and regulations.
(1) regulations on access card, use and management.
② Admission education system.
(3) Regulations on public security, fire safety and traffic safety management.
(4) Regulations on the management of fire and electricity for welding on the construction site.
(5) stipulate the security and patrol of the construction site, reservoir area and key parts.
⑥ Key, valuables and anti-theft regulations of accounting department.
All landowners articles out of the rules.
⑧ Strictly control the entry regulations of inflammable and explosive articles.
Pet-name ruby finished product protection should be zoning, classification, fire prevention, theft prevention and damage prevention. Implement the provisions of the "operation certificate" examination and registration of electric and gas welders.
Attending to apply for "fire certificate" management regulations.
3. Security system
(1) Around the construction site, a solid metal fence shall be set according to the standard.
(2) The entrances and exits of the construction site and the reservoir area should be strictly guarded. The financial room is equipped with anti-theft doors and windows and alarm devices.
(3) Guard patrol With the progress of the project, the sentry post and nursing target are adjusted to increase the guard force.
(4) All employees' certificates for entering and leaving the construction site shall be made and issued with "passes" by the General Contracting Department.
⑤ When all units enter the site, before the stage project starts, they will generally conduct entrance education and give the system, regulations and requirements to the masses. During the education, they will invite relevant departments of the territory and the security department of Party A to participate.
⑥ Check carefully during major festivals and activities, and put forward plans and preventive measures.
4, regular inspection, eliminate hidden dangers.
5. Deal with public security issues such as fighting, theft and disputes in time.
(1) constitutes a case and promptly reports it to the superior business or the local public security fire department for detection.
(2) For fighting or disputes, distinguish between primary and secondary responsibilities. Handling should be realistic, fair and reasonable, and finally a ruling document should be written and signed by both parties.
(3) generally cheating, the unit and the responsible person shall be punished as appropriate.
Three. Environmental protection and health management
1, the garbage on the construction site should be cleaned up and transported away in time, and an appropriate amount of water should be sprayed during cleaning and transportation to reduce dust.
2, the construction site should be combined with the design of the permanent road layout construction road, road base practice according to the design requirements, the surface can be used reef slag, fine stone asphalt or concrete to reduce road dust, at the same time, at any time to repair the pavement damaged by construction, in order to prevent floating soil.
3, easy to float in the sky of granular materials should be arranged in the library as far as possible, such as open storage should be closely covered, transportation and unloading, to prevent falling float in the sky to reduce dust.
4. Transport vehicles shall not be overloaded. The maximum earthwork volume of the transportation project shall not exceed 50㎝ of the upper edge of the trough, and the edge shall be lower than the upper edge of the trough 10㎝. The loading of construction dregs or other bulk materials shall not exceed the upper edge of the tank.
5, the construction site should be designated persons to manage vehicle material transportation, to prevent earthwork sinotrans. Before the transport vehicle drives out of the field, it must pat down the soil and wash the groove edge and wheels of the vehicle to prevent the soil from getting on the road and scattering.
6, the construction site to develop sprinkler dust suppression system, equipped with sprinkler equipment, designated persons responsible for on-site sprinkler dust suppression and clean up the aggradation in time.
7. The mixing equipment on the construction site must be enclosed and installed with spray dust removal device.
Four, the construction site to prevent water pollution measures
1, when mixing operations are carried out on the construction site, sedimentation tanks must be set at the mixer front desk and the cleaning place of transport vehicles. The discharged wastewater should be discharged into the sedimentation tank for secondary sedimentation before being discharged into the municipal sewage pipeline or recycled for sprinkling water to reduce dust. Untreated mud water is strictly prohibited to be directly discharged into drainage facilities and rivers in the plant area.
2. It is forbidden to backfill toxic and harmful wastes with earthwork, so as not to pollute groundwater and the environment.
Five, the construction site environmental sanitation management measures
The environmental sanitation management on the construction site involves a wide range, is not well done and has great influence, and must be strictly implemented in accordance with the relevant environmental sanitation management regulations of the company. We should gradually realize scientific and standardized management. No epidemic or other economic losses may be caused by poor management.
1, the construction site should be clean and tidy, without water, and vehicles entering and leaving the site should not be scattered or entrained with sediment.
2. When legal infectious diseases and food poisoning occur on the construction site, they must report to the health and epidemic prevention and administrative departments in time and take measures to prevent the spread of infectious diseases.
3, the construction site should be set up tea stove or electric water heater, to ensure the supply of boiling water, and managed by personnel, regular cleaning, keep health.
4. Office, dormitory, kitchen, drinking station, smoking room, garbage station, toilet, etc. , there must be a unified production of signs.
5. The public houses on the construction site should be clean, tidy and beautiful.
6. Windows should be opened in the dormitory to ensure indoor air circulation. There should be mosquito and fly prevention equipment and electric fans in summer.
7. The dormitory bed should be hung with the ID card of the construction personnel, and the bed should be clean and tidy. Storage room (cabinet), tableware, toiletries cabinet and shoe rack should be set indoors.
8. The garbage in the living area must be concentrated in the designated place and cleaned up in time. If conditions permit, closed dustbins should be used.
9, the construction site shall not be arbitrarily scattered kitchen, kitchen unified design by the general contractor, unified management. Clean fuel must be used.
10, the kitchen must have a hygiene license, and the chef should have a health check once a year, and can only take up his post after holding a health certificate and training in hygiene knowledge. Anyone who suffers from other diseases that hinder food hygiene shall not be exposed to the production, sale and washing of directly imported food.
Six, the construction site noise, pollution and nuisance measures
1, the construction site shall comply with the noise reduction limit specified in the Noise Limit of Construction Site, and establish a noise reduction system.
2, advocate civilized construction, establish and improve the management system of man-made noise control, try to reduce man-made noise, and enhance the consciousness of all construction personnel to prevent noise from disturbing people.
3, where noise operations are carried out in densely populated areas, the operation time must be strictly controlled.
4, should choose low noise equipment and reasonable arrangement, at the same time take measures such as noise elimination, sound insulation and shock absorption, in order to minimize the equipment noise pollution in the construction process.
Guarantor: XXX
XXXX,XXXX,XX,XX
Guarantee of Safe and Civilized Construction 7 When the project construction unit undertakes various projects of Baiguang Co., Ltd. or carries out engineering construction within the company scope, the construction unit and contractor promise to the property management center of Baiguang Co., Ltd. to ensure strict compliance with the following provisions:
First, obey the management of the management department and site management personnel. Before construction, complete the relevant project declaration, approval and decoration admission procedures, and post the construction permit in a conspicuous place on the construction site. Construction personnel and management personnel must wear white temporary passes when entering the construction site, and offenders will confiscate their certificates and please leave the construction site. Building tools, instruments, etc. It shall conform to the safety standards issued by relevant state departments and be kept in good condition before entering the site.
The second is to do a good job in fire prevention and electricity safety. The construction site must be equipped with fire fighting equipment according to regulations; Before any hot work such as gas, electric welding, heating, etc., go to the property management department to apply for a hot work permit according to regulations, and equip with sufficient fire-fighting equipment and designated supervisors before construction, and offenders will be fined 20xx yuan/time; The connection of electricity and water for construction shall be carried out under the guidance of the management personnel of the white light property department, and the wires shall not be connected indiscriminately, and the offender shall be deducted from the liquidated damages of 300 yuan/Zong; Smoking, burning sundries and cooking with fire are strictly prohibited in the construction site, and offenders will be fined 100 yuan/person; Decoration materials should be selected according to the provisions of the municipal or district fire department. When materials or finished products enter the site, a copy of the invoice for purchasing flame retardant materials should be submitted to the safety supervisor for review. Materials or finished products that do not meet the requirements shall not enter the site, and shall be responsible for the completion and delay of the construction period.
3. Before the concealed works in construction are closed, they must be checked and approved by the management department and management personnel before the construction can continue; When modifying drawings or plans, it must be reported to the property management department in written form, and construction can only be started after approval; Otherwise, the illegal project must be stopped, and the illegal part will be restored to its original appearance, and the required expenses will be paid by the construction unit.
Four, strictly abide by the relevant provisions of the state "family planning" management. Construction units must strengthen the management and education of family planning for employees, do not recruit "three noes" and those who violate the provisions of family planning, and bear the responsibility for violating family planning.
Five, in the shopping mall construction, business hours shall not produce big dust, noise and pungent smell. If the above operations are required by the process, it is necessary to apply to the operation management department in advance and arrange the construction after the night closure.
Six, regularly clean up mud, waste, garbage, sewage, etc. Keep the site environment clean and tidy, do not urinate or urinate, dump sewage, dyes, garbage and sundries, and offenders will be fined 100 yuan/time, and be responsible for cleaning and repairing. If the sewer is blocked due to the above reasons, it will be responsible for all cleaning costs.
Take care of the public facilities of the building. When transporting materials and removing silt and garbage, public facilities such as freight elevators and stairs shall not be damaged, and compensation shall be paid for the damage according to the price. All decoration garbage and building materials must be placed in a safe place, avoiding being placed in high places, so as not to fall from high places and endanger passers-by.
Eight, in violation of safety operation procedures and tools and equipment accidents caused by casualties and fire accidents take full responsibility.
Nine, after the completion of the construction, close all the windows, water pipes and temporary power switches before leaving.
This letter of guarantee shall come into effect as of the date of project implementation, and shall naturally become invalid after the project is completed and accepted. If this guarantee is not returned in time, your construction project in Baiguang will be stopped immediately.
Project Owner: (Seal) Project Contracting Department: (Seal)
Person in charge: person in charge:
Year, month, sun, moon, sun.
Guarantee of Safe and Civilized Construction 8 Our company will carry out the construction of basement and 3~4# buildings in the first phase of "Two-sided Needle Changfeng Yazhu" residential quarter. In order to do a good job of civilized construction on site, ensure the civilized and orderly construction process and establish a good image of metallurgical construction company, we hereby make the following guarantees to the construction company:
1, to ensure compliance with and implementation of the relevant provisions of the Building Safety Scoring Standard, the Guangxi Zhuang Autonomous Region Construction Safety Civilized Site Selection Law and the Guangxi Zhuang Autonomous Region Metallurgical Construction Company Site Civilized Construction Management Law.
2. Ensure that enough manpower, financial resources and material resources are invested in civilized construction to meet the requirements of civilized construction inspection score table (and attached table), in which the total score of each project is guaranteed to be above 40 points.
3. Designate a comrade as the person in charge of civilized construction to ensure that civilized construction reaches the standard and creates excellence.
4. The inspection of civilized construction on site shall be conducted at least once a week by the project department and at least once a month by the engineering company. During the inspection, you should fill in the Grid Table of Construction Management of Building Engineering carefully. Every inspection should be recorded and divided equally, and the person in charge of rectification and the time requirement for rectification should be indicated.
5. Accept the inspection of the construction company and the superior department at any time, take the problems found in the inspection seriously and make timely rectification.
6. Actively do a good job in the inspection, acceptance and appraisal of the superior construction administrative department. Our unit must actively and seriously do all the preparatory work to ensure that the reputation of the construction company will not be damaged.
7. Establish a 2.5-meter-high beautiful and generous fence at the frontage site located in the main street and the city entrance and exit roads, and write the name and slogan of the site to establish a good image of the construction company.
8. Accept the supervision and management of relevant departments of the construction company and law enforcement agencies.
9, according to the provisions of the construction company, pay the civilized construction deposit.
The above guarantee, as a promise to do a good job in civilized construction on site, will be punished by the original construction company in accordance with relevant regulations and bear all economic responsibilities in case of any violation of laws and regulations during construction.
This letter of guarantee is made in triplicate, one for the construction technology department, the engineering company and the project department of the construction company.
Construction unit: (official seal)
Manager of construction unit:
Project leader:
Date, year and month