Current location - Recipe Complete Network - Catering franchise - Introduction of Dingtao Station Construction Project?
Introduction of Dingtao Station Construction Project?
Railway travel is closely related to people's daily life, so what are the construction scale and architectural characteristics of each station? The following is a detailed introduction of China Railway Station, Railway Station and high-speed railway station brought by Zhong Da Consulting.

Jinan West Railway Station, also known as Jinan West Railway Station, is located in Qilu Avenue, Huaiyin District, Jinan City, Shandong Province, to the west of Zhangzhuang Airport, and is under the jurisdiction of Jinan Railway Bureau. Jinan West Railway Station is the passenger station of Beijing-Shanghai high-speed railway and Shijie passenger dedicated line under construction, and Ji Jiao passenger dedicated line is introduced into Jinan West Railway Station through tie lines.

The foundation stone of Jinan West Railway Station was laid on July, 2009 12. On June 30, 20 1 1, it was completed and put into operation with the Beijing-Shanghai high-speed railway. Jinan West Railway Station is one of the five starting stations of Beijing-Shanghai high-speed railway. There are 8 lines with a total station scale of 17, including 1 basic platform and 7 island intermediate platforms, with 2 main lines and 15 arrival and departure lines.

The high-speed railway station building project of Jinan West Railway Station includes the main station building, elevated waiting hall, underground exit area and urban corridor, no platform column and platform canopy, etc. The main building has three floors above ground, four floors locally and two floors underground.

Building structure

primary structure

Jinan West Railway Station is located in Qilu Avenue, Dianzhen Town, Huaiyin District, Jinan City, including high-speed railway station House, the square in front of the station, an elevated platform for entering the station, civil reservation for rail transit, underground parking and commercial facilities, long-distance transportation hub, bus hub, taxi and social vehicle parking system and surrounding supporting facilities.

High-speed railway station House Project of Jinan West Railway Station includes the main building, elevated waiting hall, underground exit area and urban corridor, canopy without platform columns and platform. It is a five-level structure with high middle and low sides and symmetry along the central axis. High-speed railway station House is a five-level structure, high in the middle and low on both sides, and symmetrical along the central axis. Among them, the main station building is located in the easternmost part, with an area of 62,534 square meters, with 3 floors above ground and 2 floors underground; The maximum height of the station building at the north and south ends is 32m, the maximum height of the station building at the middle section is 38. 1m, and the maximum height of the station building at the middle section is 44.2m The total construction area of the main station building is about 6,543,800 square meters, and the area of the column-free canopy is 65,000 square meters.

Above ground part:

The main building on the first floor is divided into five parts by function. In the middle is the transfer hall, and on the north and south sides of the transfer hall are ticket offices. The southernmost part of the main station building is set as reserved passenger service room, and the northernmost part is set as public security and production service room. The second floor on the ground is the platform floor, which is 8 meters high. The viaduct in front of the station is attached to the east side from south to north. The station building on this floor is divided into five parts: the entrance hall in the middle; On the north side is the ticket office, and on the south side is the waiting room of the basic platform; The northernmost part of the main station building is the station service room and VIP room; The southernmost tip is reserved for passenger service facilities. The third floor above ground is an elevated floor, the center of the main station building is a * * * enjoyment space, and the north and south sides of the * * * enjoyment space are waiting areas. On the west side of the main station building is an elevated waiting hall with a total width of 107m and a total length of 192m. In addition, reserved passenger service mezzanines with a height of 7.5m and a width of16.5m are set on both sides of the waiting hall. Here, the future will be the main waiting place for passengers to take the high-speed train, where they can buy food or have fun.

Underground:

From east to west, it is the underground part of the station square, the lower space of the main station building and the underground corridor with a width of107m below high-speed railway station yard. The ground of the main station square is a function and landscape square, and the underground of the square is divided into three floors; The basement is reserved for subway transfer space and commercial space; The second floor underground is a social parking lot, and the local second floor underground is the subway 1 line. The third floor underground is Metro Line 6. The middle of the lower space of the main station building is the connecting link between the urban corridor and the subway transfer hall, underground social parking lot and ground square, and its north and south ends are the high-speed rail equipment room. The corridor with a width of107m below high-speed railway station Yard is, from south to north, a south taxi lane, a south exit lane, a city corridor, a north exit lane and a north taxi lane.

The square in front of Jinan West Railway Station is divided into East Square and West Square. The west square is 470 meters long from north to south and 1 10 meters wide from east to west, with a total area of 52,000 square meters. It consists of two parts: building area and square area. The square area mainly includes south and north parking lots, bus hubs and distribution squares. East Square of Jinan West Railway Station, also known as "Ritual Square", was put into use on 20 13. The building area of East Plaza is about 79,000 square meters above ground and 90,000 square meters underground. The area of the East Square is equivalent to three West Square, which can evacuate up to 30,000 people. The East Plaza has two floors underground, one is the food and beverage business district, and the other is the parking lot. There are 947 parking spaces on the second floor for passengers.

jinanxi railway station

For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.