In recent years, especially since the establishment of the leadership team of the new company in early 2000, the group company has established new working ideas and development plans under the new situation of China's entry into WTO and increasingly fierce competition in the coal market, the gradual reduction of coal resources within enterprises and the single industrial product structure, and the industrial policies of the state and provincial governments, and under the condition of in-depth investigation, demonstration and full analysis of the market. Insist on stabilizing the main coal industry, speed up the development of new areas, vigorously develop non-coal industries, and actively implement the "three strategic tasks" of converting production, transferring and relocating. Since 2000, relying on the advantages of resources, we have raised more than 2.2 billion yuan in various ways to start the construction of "Ten Major Projects" such as coal gangue thermoelectric, electrolytic aluminum, pulp and gypsum, and actively create a "three-in-one integration" of coal-fired aluminum, coal-fired chemical industry and coal-fired building materials. After more than four years' efforts, the non-coal industry has achieved leap-forward development, and its output value, sales revenue and economic benefits have increased substantially for four consecutive years, which has become a bright spot in the economic development of Feicheng mining area, further developing and strengthening the overall economic strength and improving the enterprise's ability to resist risks. A number of key construction projects have started or been completed and put into operation. Among them, Liangbaosi Mine with an annual output of 4 million tons started construction in July 2002. In 2003, the main shaft, auxiliary shaft and air shaft were dug to the end, and the main shaft and auxiliary shaft were safely connected. At present, the main underground development projects such as mine bottom, water bunker, pump house, substation, powder magazine, two coal bunkers in the east wing and belt conveyor lane have been fully completed, and the auxiliary shaft hoisting system, permanent ventilation system, underground permanent drainage, power supply system and main transportation system of upper and lower shafts have been put into normal operation. In March, major systems such as mine main shaft hoisting, upper and lower well coal flow line will be formed as scheduled, and the joint trial operation of upper and lower wells will be organized comprehensively. The development of the first mining face is accelerating, and it is expected that the installation and trial production conditions will be available at the end of March or April. It is expected that the official trial production of coal in this mine will be two months ahead of the overall goal of putting into production in three years. This year, it can produce more than 65,438+300,000 tons of coal, in 2005, it can produce 2 million tons of coal, and in 2006, it will reach the level of annual output of more than 3 million tons. By then, Feikuang Group will enter the ranks of large companies producing coal10 million tons; The coal gangue thermal power project with a total installed capacity of 378MW is planned. Eight power plants have been built to generate electricity, and the internal power grid of the mining area has been built. Progress has been made in the project construction and formalities of Jiaokou Aluminum and Coal Company. After the feasibility study report of alumina project passed the evaluation on July 25 last year, the environmental assessment, water resources demonstration and land pre-examination of alumina project were completed in August, and the bauxite exploration license was obtained. Shanxi Provincial Economic Commission approved the feasibility study report of the first phase of alumina project on June 4th. The supporting project of alumina was built smoothly, and the construction of self-owned power plant and coking plant was basically completed as planned. Guo Zhuang MDF Project was completed and put into operation on September 1, with stable output and quality. The production line of household paper in Yangzhuang Mine was put into trial production in June165438+1October, and the production capacity was gradually improved. Through the construction and commissioning of these key non-coal projects, the mining industry and product structure have been continuously optimized, and a new industrial pattern of "integration of coal, aluminum, coal chemical industry and coal building materials" has gradually taken shape, and the economic strength and core competitiveness of enterprises have been greatly improved.
Since 2003, with the rise of a new round of rapid economic development in the whole country and the whole province, Feicheng Mining Group Company has also adjusted its enterprise development plan in time and put forward the overall goal of "May 12th" and the overall idea of "April 3rd". "May 122" means: after five years of struggle, the annual sales income will be 654.38+0 billion yuan, and the profits and taxes will be 654.38+0 billion yuan. The main indicators such as per capita output value, per capita sales revenue, per capita profit and per capita salary will strive for the best level in the same industry in the province and the first-class level in the same industry in the country; "Four Three" means: implementing three major tasks of actively stabilizing old mining areas, accelerating the development of new mining areas and vigorously developing non-coal industries, building three industrial bases of Feicheng mining area, Liangbaosi mining area and Jiaokou mining area, building a new industrial pattern of "three integration" of coal, electricity, aluminum, coal-electricity chemical industry and coal-electricity building materials, and realizing "three multi-industries, diversified operations and various forms of ownership" super-large modern.
In March this year, the Provincial State-owned Assets Supervision and Administration Commission (SASAC) adjusted the leading group of Feicheng Mining Group Company, with Comrade as the chairman and party secretary and Comrade Su as the general manager. At present, under the leadership of the new team of the group company, the broad masses of cadres and workers in the mining area are conscientiously implementing the spirit of the 16th National Congress of the Communist Party of China, the Third and Fourth Plenary Sessions of the 16th National Congress of the Communist Party of China and the National "Two Sessions", adhering to Scientific Outlook on Development's correct outlook on achievements, deepening enterprise reform, accelerating enterprise development, actively building a harmonious mining area according to the requirements of taking a new road to industrialization, and promoting the sustained, rapid, healthy and coordinated development of enterprises.