3 Model clauses of air conditioning installation contract
Air conditioning is also called air conditioning. So what should I pay attention to when signing an air conditioning installation contract? The following is the air conditioning installation contract I compiled, please refer to it.

Model air conditioning installation contract 1

Party A:

Party B:

Article 1 In accordance with the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and other relevant regulations, in line with the principles of equality, voluntariness, honesty and credit, and in combination with the actual needs of this project, both parties have reached the following agreement on the rights, obligations and responsibilities during the construction of this project: Article 1 Project name.

Article 2 Project Location:

Article 3 Contract Price (excluding tax): ¥ (in words)

Article 3 Term of the Contract:

Start date:

Article 5 Project contracting method: contracting for work and materials.

Article 6 Project contracting scope: installation and commissioning of air conditioning system. Personnel training: daily operation and maintenance of air conditioning system. Article 7 Documents constituting a contract

1, this contract.

2. Quotation.

3. Wiring diagram of equipment installation (provided by the manufacturer). 4, visa change information and technical documents.

Article 8 Responsibilities and obligations of Party A:

1 article 9, organize the blue prints.the design work.

2. Supervise the overall production and management of Party B's safe and civilized construction site.

3. Be responsible for providing Party B with on-site office space and warehouse or place for materials and equipment.

4. Be responsible for providing water and electricity cooperation for Party B during the construction period.

5. Be responsible for providing temporary accommodation for Party B's construction personnel, but Party B shall be responsible for bedding and accommodation.

6. Responsible for organizing the quality inspection and acceptance after completion.

7. Pay in strict accordance with the contract requirements, otherwise Party B has the right to stop work, and will not bear the responsibility for delaying the construction period. When Party A fails to pay off all the money, Party B will keep all the equipment installed by itself until all the money is paid off.

Responsibilities and obligations of Party B:

1, must obey the site management measures specified by Party A. 2. Participate in the blue prints.the design and technical disclosure.

3. Strictly organize the construction scientifically and reasonably. Party A agrees to adjust or modify the drawings, but it must meet the normal use of Party A, ensure the use effect, ensure the engineering quality and ensure accurate and timely after-sales service.

4. Organize concealed engineering inspection in time for subsection construction, and make acceptance records and construction organization design for concealed engineering.

5. Strengthen the construction safety management, and be responsible for organizing the safety education, training and daily supervision of the workers entering the site.

6. Responsible for safe and civilized construction, quality inspection and control, schedule control, and report relevant information, and provide completion details (the distribution direction of equipment installation lines is indicated, etc.). ).

7. Be responsible for organizing Party A's inspection and acceptance of product certificates of all incoming materials. Unqualified materials are strictly prohibited from entering the site for use, and Party B shall be responsible for the direct economic losses caused by material quality problems.

8. In case of life safety, property loss and quality accidents during construction, Party B shall be responsible.

Article 10 Payment of Contract Price:

1. Payment method of project funds under this contract: transfer or cash settlement.

2. Payment method: the project payment shall be made immediately after the contract is signed, the equipment and materials will be delivered to the site, the project payment shall be made before the main engine is hoisted, the project payment shall be made immediately after the installation and debugging, and the rest shall be used as the quality guarantee for a period of one and a half years. (The warranty period of the mainframe is 18 months)

Article 11 Warranty period:

Warranty period: from the date of completion acceptance and commissioning 18 months (or according to industry standards). During the warranty period, if there are quality problems with the products, Party B shall do a good job of maintenance in time to ensure the normal use of Party A. ..

Article 12 Supply of materials and equipment

1. All materials shall be purchased according to the contract and inspected by both parties. It can only be used after inspection. However, the contractor shall be responsible for site storage. The contractor shall keep and use spare parts, special tools, equipment and instructions before completion, and hand them over to Party A for preservation in time after completion of the project.

2. All equipment and engineering materials in this project must have factory certificates, and their quantity, specifications and models must meet the technical requirements.

Article 13 For matters not covered in this contract, both parties may make supplementary provisions or requirements through consultation, which have the same effect as this contract. The change of this contract is invalid, and all changes of this contract shall come into effect after both parties reach a written opinion and are signed and sealed by the representatives of double legal persons.

Article 14 Party A shall pay in strict accordance with the requirements of the contract, otherwise Party B has the right to stop work and will not bear the responsibility for delaying the construction period. When Party A fails to pay all the money, all the equipment installed by Party B shall be owned by Party B until all the money is paid.

Article 15 Ways to settle disputes

Disputes arising from the performance of this contract shall be settled by both parties through consultation. If negotiation fails, it can be settled in the following ways: 1. Bring a lawsuit to the local people's court according to law. 2. Submit to Changzhi Arbitration Commission for arbitration.

Article 16 The number of copies of a contract and its entry into force

This contract is made in triplicate, two for Party A and one for Party B, and shall come into effect after being signed and sealed by the representatives of both parties (legal persons).

Party A: Address:

Representative: Tel:

Address: Representative: Telephone Party B.

Model essay on air conditioning installation contract II

Employer: (hereinafter referred to as Party A)

Contractor: (hereinafter referred to as Party B)

According to the Contract Law of People's Republic of China (PRC), Regulations on Construction and Installation Contract and other relevant laws and regulations, Party A and Party B sign this contract on the general contracting of central air-conditioning installation project of Qingzhou Electric Power Dispatching Center on the principles of equality, voluntariness, consensus and mutual benefit for common compliance.

I. Overview of the Project:

1, project name: central air conditioning project of Qingzhou electric power dispatching center

2. Project address: comprehensive business district on the north side of Huadu Avenue, Qingzhou City.

Second, the contracting method: double contracting, that is, contracting for work, materials and installation.

Third, the construction period:

Commencement date: 20_ year 65438+1 October 1 _ day completion date: 20_ year 65438+1October1(excluding air outlet installation).

Four. Scope and content of the contract: procurement and installation of all quantities included in the design and construction drawings of central air conditioning. Note: (All pumps in the heat exchanger, cooling tower and machine room shall be purchased by Party A ... and the expenses shall be borne by Party A.) Party B is not responsible for the construction of strong current and weak current. For details, please refer to the Appendix "Partial Bill of Quantities".

Verb (abbreviation of verb) project price and payment method

1. project price: the project price of this contract is a fixed total price of RMB 240,000 (in words: two million four hundred and ten thousand yuan only). (excluding tax price) The above lump sum price includes: labor cost, machinery cost, site lease fee, temporary facilities cost, civilized construction measures fee, installation fee, measures fee, hoisting fee, fees, test fee, water and electricity fee, coordination fee, comprehensive management fee, profit and all risks during the construction period, which is a fixed lump sum price, and will not be adjusted during settlement regardless of market changes; On the premise of not changing the design drawings, no matter whether the engineering quantity of Party B exceeds the bill of quantities, no adjustment will be made during settlement; If the engineering quantity is increased or decreased due to the change of design drawings, the increase or decrease shall be settled according to the comprehensive unit price of the corresponding project in the attached bill of quantities, and the corresponding increase or decrease shall be determined by both parties through consultation.

2. Payment method:

(1) 300,000 yuan (in words: three hundred thousand yuan only) shall be paid in advance within three working days after the signing of the contract.

(2) Party B shall pay 80% of the total price of materials, about 10000000 yuan, within seven working days after all materials of Party B enter the site. Note: This amount includes an advance payment of 300,000 yuan.

(3) After the pipeline concealed works are completed, Party A shall organize the concealed works acceptance and pay 70% of the total contract price within seven working days, that is, about 65,438 yuan+0,700,000,000 yuan (in words: one million seven hundred thousand yuan only).

(4) After the project is completed, the main engine can be installed and debugged normally, and the whole system runs well. After passing the inspection by the quality supervision and inspection department and obtaining the inspection certificate, 25% of the total project price shall be paid within 15 working days after the comprehensive completion acceptance, that is, about RMB 600,000 (in words: six hundred thousand yuan only).

(4) The remaining 5% is the quality deposit, which will be paid after the expiration of the quality guarantee period. If there is any amount payable, it shall be paid after deducting the corresponding amount.

3. When Party A makes payment to Party B, Party B shall issue a receipt issued by the financial department of its company, otherwise, Party A has the right to refuse payment. Party B shall ensure that the documents provided by it are true, legal and effective, otherwise all economic disputes and legal responsibilities arising therefrom shall be borne by Party B. ..

Verb (abbreviation of verb) engineering quality and acceptance standard

1, engineering quality: excellent

2, the project completion acceptance, should be based on construction drawings, design change notice, construction acceptance specifications and quality inspection standards issued by the state.

3. Party B shall, according to Party A's requirements, provide technical information about the project quality in time, such as materials, equipment certificates, experiments, pressure tests and test reports.

4. After the project is completed and accepted, Party B shall be responsible for the quality hidden dangers such as water leakage caused by the project quality.

The rights and obligations of both parties of intransitive verbs.

(I) Rights and obligations of Party A

1. Appoint (Tel:) as the on-site representative of Party A, responsible for coordinating and handling related matters on the construction site.

2. Provide Party B with connection points for construction water and electricity.

3. Guide, supervise and inspect Party B's project quality, progress and safety, and put forward rectification opinions.

4. Organize the project acceptance and confirm the final quantities.

(II) Rights and obligations of Party B

1. Party B has provided Party A with the business license, organization code, tax registration certificate, qualification certificate and safety production license stamped with the official seal of the company, and guaranteed that they are true, legal and effective.

2. Assign relevant matters to the construction site.

3. Prepare the construction design and construction scheme, construction progress plan, water and electricity utilization plan, notice of commencement and completion, and concealed works acceptance list, and send them to Party A in time, and implement them after being approved by Party A, the designer and the supervisor.

4. Carry out the construction in strict accordance with the construction drawings, instructions and the Code for Ventilation and Air Conditioning Engineering issued by the state to ensure the quality and safety of the project, meet the requirements of national environmental protection and relevant functional departments, and ensure that it can pass the comprehensive completion acceptance.

5. Party B must complete the project in strict accordance with the brand and project schedule agreed in the drawings, and shall not cut corners or use fake and inferior products. In case of the above situation, deduct this part of the project payment, and impose a fine of twice the amount of this part, which will be directly deducted from Party B's project payment.

6. The equipment purchased by Party B must be products that meet the national standards and have passed the inspection by relevant departments, and Party B shall provide Party A with the certificates of relevant products.

7. Party B shall obey the command and management of Party A, consciously abide by the relevant management system of the construction site, and shall not operate illegally.

8, responsible for the construction of water and electricity lap, and bear the relevant water and electricity costs;

9. Protect the finished or semi-finished products by itself, and Party B shall be responsible for any damage or loss.

10, coordinate the relationship with other subcontractors, maintain the construction order, ensure the smooth completion of the project on schedule, and bear relevant expenses.

1 1, do a good job in construction organization and management, remove installation garbage in time, achieve civilized construction, and clean up after work.

12. During the project construction, Party B must make construction records and sort out the construction technical data, test data and experimental data. Party B shall fill in the self-inspection data after each working procedure of each sub-project is completed, and the form used for filling in the data must conform to the implementation guide of the Code for Acceptance of Construction Quality (Second Edition), and deliver six sets of complete and qualified completion data to Party A after the construction is completed (the data provided by Party B shall meet the requirements of project completion acceptance and filing).

Seven, production safety responsibility

Party B must strictly implement the current national, Shandong and Weifang codes for safe and civilized construction; Ensure safe and civilized construction, strictly control construction noise and dust pollution, and remove construction waste in time; All accidents (including but not limited to safety accidents, accidents inside and outside the construction site and work-related injuries) occurring during the performance of this contract shall be borne by Party B, and all economic and legal responsibilities arising therefrom shall be borne.

Eight. Warranty period: the warranty period is 18 months, counting from the date of comprehensive completion acceptance. If there is any quality problem within the warranty period, Party B shall enter the site within six hours after receiving Party A's notice, and all expenses shall be borne by Party B. If Party B fails to enter the site within six hours, Party B has the right to entrust others to handle it, and the expenses shall be borne by Party B and deducted from the quality guarantee fund. Party A has the right to recover the insufficient part.

Nine, after-sales service

1. Party B shall guarantee the designed cooling and heating capacity of the project. The warranty standard is implemented according to the national "Three Guarantees" standard. During the warranty period, Party B will receive the maintenance notice from Party A and handle it at home within six hours. Party A shall operate correctly according to the instructions. During the maintenance period, Party B shall ensure that Party A's original decoration equipment and facilities are in good condition, and repair them in time if they are damaged.

2. Outside the warranty period, Party B shall handle it at home within six hours after receiving the maintenance notice from Party A. Party A shall bear the corresponding expenses. (The specific expenses shall be negotiated by both parties)

3. The warranty period of the whole project is 18 months, counting from the date of completion acceptance (except for the damage caused by Party A and natural disasters). The whole project is maintained free of charge twice a year during the warranty period.

4. If there are quality problems during the warranty period, if there are installation and equipment quality problems, Party B shall be responsible for solving them; (Except the equipment provided by Party A), Party A shall bear the expenses of improper operation and use.

Nine. responsibility for breach of contract

1. If Party B fails to complete the project within the time stipulated in this contract, Party B shall pay Party A a penalty of 2‰ of the total contract price for each day overdue.

2. If Party B's construction quality does not meet Party A's requirements, Party B shall be responsible for rectification until it meets Party A's requirements, and the required expenses shall be borne by Party B. If the construction period is delayed, Party B shall pay Party A 2‰ of the total contract amount as liquidated damages for each overdue day.

3. If this contract cannot be performed due to force majeure, both parties shall not be liable for breach of contract.

4. Party A shall not be liable for breach of contract if the construction is cancelled, terminated or suspended according to Article 10 of this contract.

5. Where Party B unilaterally proposes to dissolve or terminate this contract, it shall be deemed as breach of contract. After the contract comes into effect, if Party B unilaterally proposes to terminate the contract before entering the site for construction, it shall pay liquidated damages to Party A at 65,438+00% of the total contract amount; After this contract comes into effect, if Party B proposes to dissolve or terminate this contract, it shall pay liquidated damages to Party A at 10% of the total contract amount, and the project payment shall be settled at 50% of the actual workload.

6. If Party A fails to pay the project payment to Party B within the time stipulated in the contract, Party A shall pay liquidated damages to Party B at the rate of two ten thousandths of the overdue payment for each day overdue.

X. Contract dispute settlement methods

Any dispute arising from the performance of this contract shall be settled by both parties through consultation. If negotiation fails, a lawsuit shall be brought to the people's court according to law.

XI。 others

1. This contract shall come into effect after being signed and sealed by the representatives of both parties.

2. For matters not covered in this contract, both parties shall sign a supplementary agreement through negotiation, and the supplementary agreement and the contract annex shall have the same legal effect as this contract.

3. This contract is made in duplicate, one for each party, with the same legal effect, and both parties shall abide by it.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Model air conditioning installation contract 3

Buyer: Liangshan Trading Center of Lefen Shopping Mall (hereinafter referred to as Party A)

Supplier: (hereinafter referred to as Party B)

According to the Contract Law of People's Republic of China (PRC), the Building Law of People's Republic of China (PRC) and related regulations, in line with the principles of equality, voluntariness, honesty and credit, combined with the actual situation of this project, and based on the central air conditioning installation contract of the reception center, the following agreement is reached on the rights, obligations and responsibilities of both parties during the construction of this project:

Article 1 Project Name Lefen Shopping Mall Liangshan Trading Center

Article 2 Project location: Shuihu Cultural Square faces south.

Article 3 Contract Price:

RMB: 43,764.00 Yuan (in words: forty-three thousand seven hundred and sixty-four Yuan only), including all related expenses such as equipment, installation materials and freight (see the quotation for details).

Article 4 Construction period of the contract: Party A calls to start construction, and the construction period is within 7 days after the signing of the contract.

Article 5 Project contracting method: contracting for work and materials.

Article 6 Project contracting scope: installation and commissioning of air conditioning system.

Personnel training: daily operation and maintenance of air conditioning system.

Article 7 Responsibilities and obligations of Party A:

1. Supervise the overall production and management of Party B's safe and civilized construction site.

2, responsible for organizing the quality inspection and acceptance after completion.

Article 8 Responsibilities and obligations of Party B:

1, and must obey the site management measures specified by Party A. ..

2, according to the site design and construction drawings, to participate in the blue prints.the design and technical disclosure.

3. Strictly organize the construction scientifically and reasonably. Party A agrees to adjust or modify the drawings, but it must meet the normal use of Party A, ensure the use effect, ensure the engineering quality and ensure accurate and timely after-sales service.

4. Strengthen the construction safety management, and be responsible for organizing the safety education, training and daily supervision of the workers entering the site.

5. Be responsible for safe and civilized construction, quality inspection and control, schedule control, and report relevant information, and provide detailed completion drawings (the distribution direction of equipment installation lines is indicated, etc. ).

6. Because there is no suspended ceiling in some places in Lefen Mall, all pipelines should be beautiful and keep a straight line in the east, west, north and south directions.

7. In case of life safety, property loss and quality accidents during construction, Party B shall be responsible.

Article 9 Payment of Contract Price:

Do not pay the deposit, and settle the account after the installation and debugging are qualified.

Article 10 This contract is made in duplicate, one for each party, and shall come into effect after being signed and stamped by the representatives of both parties.

Party A: Liangshan Trading Center of Lefen Shopping Mall Party B:

Address: Address:

Representative: representative:

Date: Year Month Day Date: Year Month Day

Air conditioning installation contract model article 3 related articles:

★ Demonstration air conditioning installation contract

★ Demonstration air conditioning installation contract

★ air conditioning installation contract template (2)

★ The latest three demonstration clauses in the air-conditioning sales contract

★ Essay on General Edition Air Conditioning Sales Contract Model 3 Latest 2020

★ The latest central air conditioning equipment supply contract model 3 pieces.

★ Sample of labor contract of air conditioner installer

★ 5 copies of installation project contract template.

★ Central air conditioning construction contract template

★ The latest version of the air-conditioning sales contract in 2020 has three model clauses.