The first floor of Qishan station building is the ticketing area and waiting area, and the second floor is the platform floor and office area. There are four manual ticketing windows and perfect customer service equipment such as security check, elevator and automatic ticket vending machine. There are 2.5 pairs of Beijing-oriented EMUs, which start at 8: 00 a.m.15 a.m., pass Xi 'an North, Zhengzhou East, Shijiazhuang and other stations along the way, and finally arrive at Beijing West, running for 6 hours and 56 minutes. Run in the direction of Xi 'an 15.5 pairs, pass through Yanglingnan and Xianyang Qin Dou, and finally reach Xi 'an North; Drive in the direction of Baoji 15.5 pairs, and finally reach Baoji South; 2 pairs in Taiyuan direction, passing through Xi 'anbei, Dali North, Yuncheng North, Linfen West and other stations, and finally reaching Taiyuan South Station; There is a 1 pair in the direction of Yan 'an, passing through Yanglingnan, Xianyang North and Xi 'anbei, and finally reaching Yan 'an. The station plans to build supporting infrastructure such as squares, commercial areas, residential areas, passenger stations and hotel catering services, and will become a modern railway passenger station with complete supporting facilities.
Station location: