Three-party renovation agreement model
How to write a three-party renovation agreement? Below I have compiled a three-party renovation agreement model, welcome to read!
Three-party renovation agreement model a
Owner unit (hereinafter referred to as Party A): Guangxi xxx company
General contracting unit (hereinafter referred to as Party B): Guangxi xxx company
Sub-contracting unit (hereinafter referred to as Party C): Guangxi xxx company
According to the actual need for the project, after consultation with Party A agreed to the B party to the ? Sunshine Century Commercial Complex? The outer wall decoration project subcontracted to party C, in order to ensure the successful completion of the project, to achieve the goal of high quality, high efficiency, low consumption and civilized construction, the development of this tripartite agreement. Clearly their respective responsibilities and rights, in order to *** with the compliance.
A project overview:
Project name: ? Sunshine Century? Commercial Complex Building Facade Decoration Project
Project Location: Nanning City, xxx35
Project Content:? Sunshine Century? Commercial Complex Building Glass Curtain Wall, Aluminum Composite Panel Curtain Wall
Second, the scope of the project and contracting method:
Party C according to Party A, Party B approved program and the requirements of the construction drawings of the commercial complex building of the exterior wall decoration works of the work package construction.
Third, the settlement mode:
1, Party A directly with Party C settlement, the settlement mode of the two sides to determine a separate agreement. Party B to Party C in the settlement procedures to provide facilities (such as visas and settlement information for Party C stamped, etc.).
2, Party A and Party C settlement of the total price of 5% of the project department to give Party B project with the fee and 2% of the project management fee.
3, the project's tax is included in the contract price of party C, party C is responsible for the excitement. The tax of the project department's project management fee is included in the management fee, and Party B is responsible for paying it.
4, Party B and Party C and then another subcontract to determine the responsibilities of both parties, no additional costs.
5, to 20xx month 30th Sunshine Century workers living area water, electricity costs by Party B is responsible for payment, and thereafter the workers living area water, electricity costs by Party A is responsible for payment.
Fourth, project management:
Party B and Party C to improve the subcontracting procedures, Party B to the project throughout the tracking and control management, and with the construction of Party C, the completion of the data by Party C is responsible for the collection, collation and submission to Party B, Party B summarized by the unified declaration of the completion and acceptance.
V. Project payment:
1. Project payment is entrusted by Party B to Party A to pay Party C directly. Need to pay the progress of the project, by party C application, party B signed and issued a letter of authorization for payment reported to party A for review.
2, Party A in the progress of works to Party C at the same time, according to the payment of 5% of the amount paid to Party B with the fee.
Sixth, the tripartite responsibility agreement:
1, Party A's responsibility: Party A in accordance with the contract payment treaty, according to the progress of the project to Party B and Party C, respectively, with the allocation of the fee and progress of the project. If Party A fails to make payment in time, Party A shall bear the loss caused and the construction period shall be postponed.
2, Party B's responsibility: improve the relevant subcontracting procedures with Party C and for the record, according to the subcontract to fulfill the rights and obligations of the general contractor, is responsible for Party C's construction of the whole process of comprehensive management. Assist with Party C to do a good job on-site protection of finished products, fire and theft prevention, safety, civilized construction management.
3, Party C accepts Party B's management, according to the requirements of the subcontract to complete the construction tasks on time and in accordance with the quality, and to ensure that the provision of materials brand, specifications, models and samples and Party A requirements are consistent. Party C is responsible for the quality warranty of the subcontracted works contracted by Party C. Party C shall be responsible for the quality problems of the works during the warranty period, and shall go to the site within 24 hours after receiving the warranty notification to carry out the free repair, otherwise Party A shall have the right to repair and deal with the works on its own and deduct the corresponding warranty deposit. Warranty period, due to the quality of the project caused by the loss of party C bear the corresponding liability, party C should do a good job of safe production, civilized construction, to ensure the safe management of the project and personal safety, party C caused by the personal safety of the responsibility of party C is responsible for.
VII, this agreement during the fulfillment of the dispute, three-party negotiation to resolve the consultation fails, can be to the local people's court.
VIII, this agreement is a copy of the land, a, b, c three parties each of the two, this agreement shall enter into force from the date of conclusion of the warranty period expires, this agreement is terminated.
Party A: Party B:
Legal representative (or delegate): Legal representative (or delegate):
Open Bank: Open Bank:
Three-party renovation agreement model twoI. Agreement tripartite p>
Party A: telephone: Party B (owner's name): Building No.: Building Unit No. room p>
Party B (owner) ID card number: telephone: Party B Name of client: telephone: ID card number: p>
Party C (renovation unit): Name of person in charge: p>
ID card number: telephone: p>
II. General
1, in order to ensure the smooth progress of residential renovation construction of the owners of the district, to maintain the owners of the district's **** the same interests, and district buildings, residential adjoining
Neighborhood and the district's overall public **** interests are not infringed upon, the Guangxi Qinzhou Hengxiang Huayuan Property Management Limited Liability Company for the owners of the district's indoor
Interior renovation has the right to manage, now A, B. C three parties on the management of the renovation phase, C three parties on the management of the renovation phase reached the following agreement, and signed with the property company this agreement,
to *** with the compliance, as follows.
2, the three parties to this agreement have understood the same, on the basis of voluntary, equal, consensus, sign this agreement.
3. Laws, regulations and documents on which this Agreement is based
IV. Rules of this Agreement
1. Declaration and approval of renovation works
(1). The owner shall lead the decoration unit to declare the decoration to the property service center before the decoration, and fill in the "Owner's Indoor
Decoration Declaration Form" with the person in charge of the decoration unit*** and attached with the decoration construction plan, water and electricity diagrams and other drawings, as well as the qualification certificate of the decoration construction unit and a copy of the business license.
(2). The contract of decoration and renovation works shall be subject to the "Owner's Interior Decoration Declaration Form" approved by Party A.
(3). The service center receives the owner's declaration within 3 working days to complete the approval of the owner or the person in charge of the renovation unit to the service center to handle the relevant formalities
and sign the "three-party agreement on renovation and construction", to obtain the "renovation permit" issued by the service center before the renovation.
2. Management Regulations
(1). The property service center supervises and inspects the renovation construction based on the Temporary Convention of Owners and this Agreement, and the renovators must obey the management of the service center
.
(2). Party A hires a professional removal company to remove and dispose of the decoration garbage, and the charge is as follows: 3 yuan/㎡ per floor area.
(3). The construction time is stipulated.
Monday through Friday 8:00 a.m.-12:00 p.m. 14:30-18:00 p.m. (summer)/15:00-18:00 p.m. (winter)
Saturdays and Sundays 9:00 a.m.-12:00 p.m. 15:00-18:00 p.m.
Construction is not permitted on national holidays.
(4). Decoration appearance requirements: Party B decoration is limited to the door within the household, all the facade landscape shall not make any changes, can not close the balcony or change the design of the balcony use function; strictly prohibit the outdoor installation of canopies; strictly prohibit the change of the color of the balustrade and stickers on the glass;
(5). Indoor shall not be arbitrary holes, cancel the partition wall; strictly prohibit the barbaric construction, heavy hammering walls, floors; strictly prohibit the alteration of external walls; strictly prohibit the damage to the beams, columns and load-bearing walls; strictly prohibit the alteration of the leaping staircase; shall not be arbitrarily increase the floor, the ground loads, such as the addition of masonry partition walls, the installation of large lamps and lanterns, and so on.
(6). Shall not destroy or change the kitchen, toilet, balcony of the waterproof layer, before the renovation of the bathroom, balcony water test to see if there is a blockage leakage phenomenon. (7). Kitchen is not allowed to install window-type direct exhaust fan, kitchen fumes must be unified by the pipeline exhaust device discharged into the flue; strictly prohibit the closure of the household of the various inspection ports, floor drains.
(8). Pre-buried visual intercom and other weak power lines are strictly prohibited to change; gas pipeline changes need to apply to the gas company, is strictly prohibited to change their own.
(9). When installing air conditioning, please inform the service center and install the external host according to the designated location, it is strictly prohibited to install the host outside the air conditioning shelves; the import and export of the water heater is recommended to install angle valves and check valves.
(9). Indoor decoration garbage must be removed in a timely manner, not piled up in the community or outside the door;
3, decoration site regulations
(1). Renovators must post the Renovation Permit outside the entrance door, renovators must be neatly dressed, and accept the supervision and inspection of security personnel; (2). Smoking, drinking, cooking, playing and lodging are strictly prohibited at the construction site.
(3). Transportation of decoration materials must be packed, and then use the elevator to transport; for super-high, large, heavy materials, must be according to the size of the staircase size, pre-split, split good, not in the community anywhere in the split, split processing.
(4). Due to the transportation of materials caused by the public **** area pollution, damage, the owner is responsible for cleaning up, resulting in losses, at the price of compensation; property companies to clean up on behalf of the cost borne by the owners.
4, the provisions of the renovation site safety
(1), the renovation site must strictly comply with national fire laws and regulations.
(2), the renovation site is strictly prohibited to store a large number of flammable, explosive, toxic and other items; each renovation site must be equipped with fire extinguishing equipment, the renovation unit must be configured with the standard of not less than an effective fire extinguisher 2 kg / 50 square meters.
(3), the renovation of electricity shall not use ultra-high-power machines, is strictly prohibited indiscriminate pulling, haphazard wiring, must use qualified mobile cable, not to use the flower line instead of the use of public *** part of the valves and fire facilities.
(4), it is strictly prohibited to throw objects in the air, if the above behavior is found, in addition to compensation for the corresponding losses, the service center has the right to pursue the responsibility for breach of contract.
5, project acceptance provisions
(1), hidden works and water and electricity works in the construction is completed before the completion of the service center must declare acceptance. If concealed by itself without acceptance, the service center has the right to forcibly remove the covering layer, and the owner will be responsible for any damage caused.
(2), the completion of the renovation project, the owner and the person in charge of the renovation team must go to the service center to apply for acceptance, acceptance, the service center to sign the acceptance of qualified opinions, normal use of three months after the re-inspection of the qualified, the renovation unit or the owner of the service center for the relevant procedures.
6, elevator operation regulations
(1), all renovation materials, renovation garbage, set of doors, sliding doors, the whole kitchen, combined furniture must be transported using a special freight elevator, not borrowed or stolen passenger elevator. (The height and width of materials and furniture shall not exceed the flat size of the elevator opening).
(2), the use of freight elevators to carry sand, cement, garbage, etc., must be packaged in a good bag, with a cloth pad on the floor of the car before placing the decoration materials, material placement must be balanced to avoid tilting of the car, affecting the operation, can not be overlapped and stacked. If there is sand and gravel garbage fall into the car door track, must be cleaned up immediately, do a good job of cleaning.
(3). Into the elevator goods, the height shall not exceed 200cm; width shall not exceed 130cm.
(4), the elevator in the process of loading, can only be held down by hand to open the door button, it is strictly prohibited to use a hard object to hit the button (such as: keys, screwdrivers, etc.), impact on the door plate, not leaning on the car door with the body or use objects to block the door of the car, and shall not be allowed to stand for a long time in the middle of the door.
(5), waiting for the use of freight elevator handling, please consciously wait in an orderly manner, not barbaric handling. The goods shall be placed lightly in the car and shall not be thrown. Goods can not be stacked in the waiting hall, lobby and corridor. When handling, please do not obstruct other people's access, and must give courtesy to owners and pedestrians to use the elevator first. (6), the use of the elevator should consciously accept the supervision of the property staff, there are violations of the provisions of the staff have the right to stop.
(7), if there is any violation of the management regulations and damage to the elevator equipment during the delivery of goods, the loss caused will be borne by the parties concerned.
(8), the owners and decorators should be civilized to take the elevator, when taking the elevator, it should be kept clean and tidy. No spitting, smoking, littering and carving in the elevator.
V. The rights and obligations of the three parties
(1), Party A's rights and obligations:
① Party A has the right to manage all the renovation of the district, the development of relevant management regulations, the right to maintain the majority of the owners of the 's interests, the right to stop bad renovation behavior.
② Party A has the obligation to publicize the relevant provisions of the management of the renovation, for Party B to do a good job, to remind Party B of the precautions to be taken in the work, for Party B to do a good job in the inspection and acceptance.
③ Party A needs to regularly clean up the renovation garbage; Party A needs to monitor the renovation garbage removal personnel to ensure the safety of the community.
(2), the rights and obligations of the owners of Party B
① owners have the right to their own homes within the provisions of the renovation activities; owners have to be hired by their own renovation units or individuals in the renovation of the period of damage to the public ****, the interests of others bear joint and several civil liability.
② The owners are obliged to comply with relevant state laws and regulations and the provisions of the property community, to accept the supervision and management of the Party.
③ Owners in the renovation, the renovation of the garbage need to be carried to the designated storage point, and voluntarily pay the renovation of the garbage removal fee to Party A in accordance with the above fee standards;
and keep the bagged state, and handed over to Party A to remove out of the district.
④Owners are obliged to educate the renovation units or individuals they hired about safety and renovation regulations, and are obliged to comply with this Agreement. ⑤ Owners are responsible for all the negative consequences brought by the decoration to their own houses and adjoining houses.
⑥ The owner or renovation party will be held responsible for any failure to follow the regulations on the operation of the elevator.
(7) If the owner or renovator intentionally damages or improperly uses the elevator or causes any damage, accident or injury to any person, the owner or renovator shall bear full responsibility and compensate for all the losses caused.
(3), the rights and obligations of party C
①, party C before signing this agreement should be a thorough understanding of the "Property Management Ordinance", "Tenants Handbook", and other ancillary agreements of the management office; ②, party C agrees to carry out the construction in accordance with the above provisions, and comply with the party's management and supervision, in case of violation, party C bears all the responsibility to agree to the party to take appropriate measures, and delayed renovation of the project progress and other losses bear all the responsibility. Project progress and other losses bear all the economic and legal responsibility;
③, party C in the owner's request for unauthorized renovation, should be explained to explain, do not renovate, or need to bear the corresponding responsibility;
④, renovation is completed by the owner and party C to the property service center to apply for acceptance, such as no violation of the record, after three months, in the conditions of acceptance of the two sides of the A, B and the neighboring tenants; if not, party A will be in accordance with the agreed upon acceptance. does not meet, Party A will be required to restore the original status as agreed, and pursue other responsibilities of Party C.
Six, other matters
(1), this agreement does not provide for matters, according to this agreement specified laws, regulations and documents, this agreement specifies the laws, regulations and documents have not been provided for, the three parties to solve the problem by negotiation.
(2), this agreement in triplicate, A, B, C, each party to sign a copy, since the date of signature and seal of the three parties to take effect, the three parties have the same legally binding. Supplementary provisions: the installation of security nets shall be in accordance with the unified style and specifications of the service center.
VII. Commitment The owner/renovation party undertakes to abide by this "Tripartite Agreement on Renovation and Construction" and to bear the consequences arising therefrom.
Party A: (seal) Party B (owner):
(commissioner):
Date: January, December, December
Party C (decoration unit):
Date: January, December
;