if it is rough, write the percentage of the designed production capacity; if it is detailed, describe in detail the production process at the time of detection and the process stage in the monitoring process (such as tire factory, which usually only does one process for a certain period of time), and analyze the pollution sources and the pollutants that may be produced at this stage.