1, covering an area. The planned land of Mu Bai Swimming Pool Project is 6924.4 1 m2, and the construction land is 7493.08 m2. Beitai Swimming Pool Project covers an area of about 6,200 square meters with a total construction area of 5,700 square meters. In terms of area, Mu Bai Swimming Pool is better.
2. There are many projects. Mu Bai Swimming Pool is a fashionable high-end sports and leisure center integrating swimming, catering, leisure, fitness and medicated bath. There are many projects. The construction of Beitai Swimming Pool includes a 50m×25m standard swimming pool, a 2 1m×25m recreational swimming pool and a 25m× 10m leisure swimming pool. At the same time, it is not a comprehensive swimming pool, and there are few projects.