The process of handling the qualification of fire engineering companies is as follows:
1. The qualification certificate of fire engineering usually needs to be handled by the construction department at or above the prefecture level and the fire department of the fire brigade at the prefecture level;
2. Enterprises that have obtained the qualification of fire control facilities engineering design and construction can engage in consulting, design, construction and integrated design and construction of fire control facilities projects in various construction projects, and can also undertake general contracting and project management of corresponding projects; Includes:
(1) automatic fire alarm and its linkage control system;
(2) automatic sprinkler system;
(3) water spray fire extinguishing system;
(4) gas fire extinguishing system;
(5) foam fire extinguishing system;
(6) automatic fire extinguishing systems such as dry powder fire extinguishing systems;
(7) Automatic fire control facilities for smoke prevention and extraction system;
3. Enterprises that have obtained the first-class qualification are not limited in the scale of undertaking fire control facilities projects;
4. Enterprises with Grade-II qualification can undertake fire-fighting facilities projects for civil buildings with a single building area of not more than 41,111 square meters, and factories and warehouses with a fire risk of Class C or below.
The conditions for applying for the qualification of a fire engineering company are as follows:
1. Enterprise assets with net assets of more than 6 million yuan;
2. Key personnel of the enterprise:
(1) There shall be at least 3 registered construction engineers specializing in mechanical and electrical engineering;
(2) The technical person in charge has more than 8 years' experience in technical management of fire control facilities construction, and has the senior title of engineering sequence or the qualification of first-class registered construction engineer in mechanical and electrical engineering; There shall be no less than 6 people with intermediate or above titles in HVAC, water supply and drainage, electrical and automation, and all the majors shall be complete;
(3) There shall be no less than 21 skilled workers with intermediate level or above who have passed the examination or training;
(4) The technical director (or registered constructor) has presided over the completion of at least two engineering achievements required by the first-class qualification standard of this category.
The scope of qualified contracting projects of fire protection engineering companies is as follows:
1. First-class enterprises can undertake the construction of various fire protection facilities;
2. Secondary enterprises can undertake the construction of fire-fighting facilities such as buildings with a building height of 111 meters or less and a building area of 51,111 square meters or less, and devices for producing and storing flammable and combustible liquids and gases;
3. Grade III enterprises can undertake houses with a building height of 24 meters or less and a building area of 25,111 square meters or less.
to sum up, fire fighting qualification is required for fire fighting construction, maintenance and sales and installation of fire fighting equipment. The qualification of fire fighting facilities engineering contracting enterprises is divided into Grade I, Grade II and Grade III.
Legal basis:
Article 11 of the Fire Protection Law of the People's Republic of China
For construction projects that need fire protection design according to the national technical standards for fire protection in engineering construction, the fire protection design review and acceptance system for construction projects shall be implemented.
article 11
for special construction projects specified by the competent department of housing and urban-rural construction in the State Council, the construction unit shall submit the fire protection design documents to the competent department of housing and urban-rural construction for review, and the competent department of housing and urban-rural construction shall be responsible for the results of the review according to law.
for other construction projects other than those specified in the preceding paragraph, the construction unit shall provide fire protection design drawings and technical data that meet the construction needs when applying for a construction permit or approving the commencement report.
Article 12
If a special construction project has not passed the fire protection design review or the review is unqualified, the construction unit and the construction unit may not carry out the construction; For other construction projects, if the construction unit fails to provide fire protection design drawings and technical data that meet the construction needs, the relevant departments shall not issue construction permits or approve the commencement report.