In order to do a good job in energy conservation and emission reduction, and ensure the smooth progress of production and energy conservation and emission reduction, the leading group for energy conservation and emission reduction is headed by the top leader, and the competent leaders of relevant functional (professional) management departments are members. There are energy offices and emission reduction offices, staffed with full-time management personnel, which implement unified management, supervision, inspection, coordination and service of energy conservation and emission reduction for grass-roots units according to actual conditions, and each grass-roots unit also has corresponding part-time energy conservation and emission reduction management personnel.
2 system construction and implementation
In order to adapt to the new form of energy conservation and emission reduction, we should constantly analyze and summarize the problems found in management practice, formulate energy conservation and emission reduction systems such as energy management system, environmental protection management system and air conditioning management system, and clarify the relationship between responsibility, right and benefit. The formulation and improvement of these systems can ensure that the management of energy conservation and emission reduction has rules and evidence to follow.
Three measures are in place
3. 1 Strengthen energy metering management to prevent leakage, leakage and leakage.
Energy consumption such as gas, water and electricity shall be metered and charged. There are aging problems in the water supply and gas supply network of the construction unit, which should be checked irregularly. Long-term buried pipe network is damaged by corrosion, resulting in different water, gas and oil.
To solve the leakage problem, it is necessary to invest a lot of money and manpower in maintenance and repair, and make comprehensive statistical analysis of the data every year, which can effectively reduce the waste of energy and environmental pollution.
3.2 Strengthen energy management and rational scheduling.
In terms of power dispatching, the principle of centralized and unified arrangement is adopted for the production with high energy consumption, and the heavy-load production is arranged in the low-power valley section to minimize the power consumption in the peak section, which can not only reduce the no-load loss of transformers and reduce the unit energy expenditure, but also meet the peak-shaving requirements of the state grid, thus achieving the purpose of energy saving.
3.3 Strengthen energy-saving technical transformation.
New technologies such as modular automatic control technology in workshop control room and time-sharing control of workshop street lamps can not only save energy, but also ensure safety.
3.4 adopt new technical means to strengthen the monitoring and monitoring of pollution discharge.
Environmental monitoring is the eye of environmental management. To do a good job in emission reduction, we must attach importance to environmental monitoring. In addition to routine monitoring of the general discharge outlet and workshop discharge outlet, online monitors such as COD should be installed at the general discharge outlet, and new monitoring means should be used to further strengthen the monitoring and control of pollutant discharge.
4. Realize cleaner production
Control pollution from the source, use clean energy such as natural gas, reduce the emission of exhaust pollutants, and reduce the contribution of SO2 to the atmosphere.
5 the environmental management of construction projects must be standardized
We must strictly implement the system of "environmental impact assessment" and "three simultaneities" to control pollution from the source. Formulate environmental management measures for construction projects. All new, modified and expanded construction projects shall be subject to "environmental impact assessment" in the early stage of construction, and the "three simultaneities" system shall be strictly implemented in project construction.