In school or society, unexpected events or accidents sometimes occur. In order to reduce the harm caused by accidents, it is often necessary to make emergency plans in advance. So how should we prepare the emergency plan? The following is a sample essay (generally 5 articles) of "Safety Emergency Plan for Sudden Power Failure of Property" collected by me, for reference only, and you are welcome to read it.
Emergency plan for sudden power failure of the property 1 When the high-voltage line fails or the power supply bureau suddenly loses power, the following emergency plan is formulated for the personal safety and property safety of the community owners:
(a), the personnel on duty found that the community suddenly power failure, should immediately notify the maintenance personnel and other relevant personnel rushed to the scene;
(2) Take corresponding measures according to the power outage range;
(3) Contact all elevator cars by elevator communication walkie-talkie or other means to determine whether there are trapped people in the elevator cars and check them one by one;
(4) starting the generator set;
(5), turn off the elevator and each unit master switch, finally turn off the transformer load side master switch, if necessary, also can turn off the high voltage isolating switch;
(6), close the generator power output master switch;
(7), check whether the double switch is in the standby gear;
(8), turn off the switch of each circuit in turn;
(9) Before sending, check whether all power switches and control switches are closed, and send power step by step after confirmation, so as not to burn out electrical components;
(10), stop, power transmission must have the necessary protective measures, at least two people cooperate, single operation is prohibited;
(eleven), observe the operation of elevators, pumps and other facilities;
(12), one person in the main distribution room and one person in the generator room shall be on duty until the power supply returns to normal;
(13), timely post warm tips in public * * * areas such as each channel and unit entrance to inform the owner.
The emergency plan for sudden power failure of the property is to deal with the situation of water and power failure and ensure the normal working life of the community. The emergency plan for water and power failure is specially formulated for the reference of relevant departments.
First, the principle of emergency treatment
The community can be divided into planned water and power cuts and sudden water and power cuts, and relevant work should be arranged reasonably to make the community work return to normal as soon as possible.
Second, the water and electricity treatment process
1. In case of planned water and power failure, the owner (residents) and each work unit shall be notified 24 hours in advance, and notices shall be issued in all buildings, bulletin boards in the lobby and electronic display screens in the community. Register the notice on the posted notice and save it.
Maintain the relevant equipment normally, and patiently explain to the owner (resident) for support and cooperation. If the water is cut off, use the domestic water tank to supply water temporarily. If the water supply is cut off for a long time, it is necessary to contact water supply, fire fighting and other units to solve the water supply problem. Power failure automatically starts, and the generator temporarily supplies power.
2. In case of sudden water and power failure, a brief notice shall be given within ten minutes, and a written notice shall be given within 1 hour, including the reasons and the expected time to resume water and power failure. And inform Zhang to put towels in a conspicuous position in the lobby of each building and save the documents. Repair and maintain related equipment, patiently explain to the owner (resident) and get support and cooperation. If the water is cut off, use the domestic water tank to supply water temporarily. If the water is cut off for a long time, it is necessary to contact water supply, fire fighting and other units to solve the water supply. Power failure automatically starts, and the generator temporarily supplies power.
Third, the management division of labor requirements of each team
(1) office
1. Print and post the notice of water and power failure in time.
2. Arrange the standby water source and start the temporary power supply device.
3. patiently explain to the owner (resident) the reasons for the water and power outage.
(2) Escort class
1, strengthen patrol security during water and power outages.
2, guide the water and electricity maintenance of vehicles, assist in maintenance services.
(3), maintenance class
1, do a good job of normal maintenance during water and power outages.
2. If water and power are cut off due to failure, it shall be repaired and eliminated in time, and the water and power shall be resumed.
Fourth, prepare emergency supplies.
1, water storage tank and domestic water tank
2, emergency lights, generators
Emergency plan for sudden power failure of property 3 I. Purpose
In order to prevent the sudden power outage from hurting the employees in the mall and ensure the safety of goods.
Second, the scope of application
Suitable for shopping mall properties in this area.
Three. accountability
1. The staff of the high-voltage power distribution project are responsible for understanding the causes of power failure, and promptly informing the monitoring center and important tenants to do a good job of sending standby power and restoring normal power supply.
2. The monitoring personnel are responsible for explaining the reasons for power failure and closely monitoring key parts, and cooperating with security personnel to prevent personal injury and loss of items.
3. The security personnel are responsible for the security work of the entrances and exits and the security patrol work in the power outage area, and cooperate with the floor management personnel to do a good job in the evacuation of customers and the safety of goods.
4. Managers should organize, coordinate and deal with the aftermath.
5. Floor managers and shop assistants should do a good job of guiding customers to evacuate to ensure the safety of goods in the merchant's cabinet.
Fourth, the processing flow
(1) Electric power emergency procedures:
1, engineering measures
2. Safety measures
(2) Emergency treatment plan for power failure:
1. When there is a power failure accident in the shopping center, the engineering technical director must immediately go to the high-voltage distribution room, and the on-site (on duty) high-voltage distribution technicians should take the following measures in time:
1. 1 belongs to the power outage in the shopping center area.
1. 1. 1 Maintenance technicians will inform the monitoring center of the power outage area and situation while checking the equipment failure of the shopping center, so as to take relevant measures. (Important tenants in the power outage area should also inform them at the first time).
1. 1.2 Go to the power outage area and check the cause of the failure. Check the running status of the equipment, record the working parameters, and turn off the electromechanical equipment or the heavy-duty electricity-using unit to avoid the damage of the instantaneous current to the equipment when the power supply is restored.
1. 1.3 After finding out the fault, the engineering department will organize manpower to repair it.
1. 1.4 At the same time, the normal operation of the undamaged area should be restored.
1.2 power failure caused by external power supply (high voltage power loss)
1.2. 1 Start the standby power supply of the shopping center (under normal circumstances, the main and standby power supplies are automatically switched), and the power supply of the fire elevators, fire walkways, water pumps, evacuation lighting and other important parts must be guaranteed.
1.2.2 technicians call the power supply department to check the cause of the failure and save the reply.
1.2.3 notify the monitoring center and important tenants.
1.2.4 organize personnel to inspect and maintain facilities and equipment before power supply is restored. (See Annex I for specific operations)
2, property personnel safety measures are as follows:
2. 1 monitoring and security personnel
2. 1. 1 After receiving the power outage reason (or finding or receiving the power outage report), notify the property management personnel and the engineering supervisor in time.
2. 1.2 Focus on monitoring power outage areas.
2. 1.3 notify the security supervisor (staff) to rush to the power outage business area immediately and strengthen the care (especially the cashier). (The transfer of its staff shall be the unified responsibility of the safety supervisor)
2. 1.4 when necessary (after the total value is confirmed), notify the personnel present through the fire broadcast. (The specific content should be confirmed by the total value).
2. 1.5 Maintain order, strengthen patrol in power-off areas, control employees' access, and close access when necessary (gross value confirmed).
2. 1.6 after receiving the evacuation decision, assist the property management personnel and floor management personnel to guide the shoppers and VIPs present.
2.2 Property management personnel
2.2. 1 rushed to the scene at the first time after receiving the power outage report.
2.2.2 Organize and coordinate on-site work and decide whether to evacuate (total reported value to be determined).
2.2.3 In case of power failure, if the owner needs special services, the management personnel shall provide necessary services, such as transporting the wounded.
2.2.4 If an employee is injured or facilities and equipment are damaged, he shall apply to the insurance company for compensation in time.
3. The safety measures for floor managers, shop assistants and cashiers are as follows
3. 1 In case of power failure, keep calm, avoid leaving the business site, and ensure the safety of articles and property.
3.2 When necessary, notify the customer to suspend business.
3.3 After receiving the evacuation notice, guide the customers to take the safe passage to leave the mall.
3.4 After the power supply is restored, assist the management personnel to do a good job of inventory.
(3) Matters needing attention in emergency treatment of power failure:
1, in case of power failure, it is necessary to verify whether there are passengers trapped in the elevator, and if necessary, carry out rescue according to the emergency plan for people trapped in the elevator.
2, electrician should check the telephone, weak current monitoring, fire control system, make it in normal working condition.
3. The power provided by the standby power supply in the shopping center cannot meet the normal operation needs, and the lighting in the secondary places may be insufficient. Property staff should pay close attention to the traffic conditions on sidewalks and lanes, and place lighting objects and warning signs when necessary to facilitate pedestrians.
4, in the absence of emergency lights, secondary positions such as cleaning personnel should hold a flashlight, protection under the unified coordination of the property manager, send guests in and out.
5. The management department should adjust the entry and exit routes of employees in time.
Safety emergency plan for sudden power outage of property 4 I. Temporary power outage:
1. After sudden power failure, the engineering department shall immediately contact the power supply company to find out the reason and time of power failure and notify the owners one by one;
2. Check all facilities and equipment in the public * * * part, and cut off the power supply in time to prevent sudden calls from being dangerous;
3. If there is power failure at night, the Security Section will strengthen the patrol of the community. As the monitoring center has UPS standby power supply, the personnel on duty should pay special attention to the neighborhood and monitoring system, and notify the patrol personnel to check it in time.
Second, the power outage notice has been obtained in advance:
1. Print the power outage notice immediately after receiving it and post it on the bulletin board of the community and the unit, so that the owner can know the power outage information in time;
2. After the engineering department of the company knows the specific time of the power outage, check all public facilities and equipment, and cut off the power supply after the power outage to prevent sudden calls;
3. If there is a power outage for a long time and the owner needs to order food or carry goods, our company will arrange personnel to contact or help carry them in time;
If there is power failure at night, the engineering department will strengthen the patrol of the community. As the monitoring center has UPS standby power supply, the personnel on duty should pay special attention to the neighborhood and monitoring system, and notify the patrol personnel to check it in time.
Third, the treatment measures:
1, the power supply company shall promptly urge the power supply company to carry out emergency repair.
2. In case of internal reasons in residential areas, immediately organize engineers to record the time, causes, countermeasures and losses caused by power failure accidents in detail, and do a good job in emergency repair and aftermath.
Safety emergency plan for sudden power failure of property 5 I. Emergency treatment of sudden power failure
1. After the power failure, the operators are divided into two groups. A group of transformer room, according to the second or third processing. The other group should immediately go to the power outage area and check the elevator with the order maintenance department. If the elevator is trapped, it will be handled in accordance with Article (Provisions on Rescue of Trapped Elevator). At the same time, notify the maintenance director of the engineering maintenance department and the customer service center. In case of external power failure, the maintenance supervisor or customer service center of the engineering maintenance department will immediately contact the power supply bureau by telephone to inquire about the reason of power failure and the call time.
2. External power failure: the main power supply fails, and the standby power supply (generator) is automatically put into use. When the main power supply is cut off due to external fault, the personnel on duty should check the disconnection of the high and low voltage circuit breakers, check the voltage and indicator light, exit the main power supply from the circuit breaker after the power failure and voltage loss, and hang a warning sign of "No Closing". Close the contact switch of the generator and check the running state of the generator (fuel, water temperature, etc.). ) every 15 minutes.
3, check the low voltage distribution cabinet, standby power supply is normal.
4. Monitor the incoming voltage of the mains, report to the power supply bureau, and understand the external power outage. Once the commercial power is restored, the power generation will be stopped immediately and the commercial power supply will be restored.
5. Make records and report the situation to all departments in time.
Second, the internal fault power emergency treatment
1. Turn off the load switch of the faulty cabinet (if there is a fire, call the fire center immediately and put out the fire with a portable fire extinguisher).
2. If there is a 1 household circuit breaker in the low-voltage distribution cabinet, the low-voltage bus will be operated by another transformer with two loads to ensure the electricity consumption of residential facilities.
3. Report the handling process and failure to the maintenance supervisor and the foreman of the engineering maintenance department.
4. Make records and report the situation to all departments in time.
5. The engineering maintenance department held an accident analysis meeting, invited the power supply bureau, the construction party and relevant parties to participate, analyzed the cause of the accident and the treatment measures, and made a written summary report to the relevant departments.
;