Total investment: 654.38+067 billion yuan.
The newly-built Terminal 3 is the work of norman foster, an architect who once designed the Hong Kong Airport. Experts believe that this is an outstanding design with the architectural functions and characteristics of a world-class airport. Equipped with the latest technical system, Terminal 3 will become the most advanced airport in the world.
T3B roof of Terminal 3 is hyperboloid, flying. It is about 958 meters long from north to south and 775 meters wide from east to west. Its projected area is about 1 10000 square meters, and the roof signboard is 42M (counting from plus or minus 0.00). A temperature joint is set at the joint between the finger gallery and the main body of the terminal building, which divides the whole roof steel structure of the terminal building into three parts.
The project is a large-area and long-span vacuum triangular cone steel reticulated shell structure with novel and unique architectural shape and herringbone layout.
Cctv new building
Total investment: 5 billion yuan
The new site of CCTV is located in the east of East Third Ring Road, north of Guanghua Road and south of Chaoyang Road, within the planning scope of CBD. The new CCTV site has a total land area of187,000 square meters, a total construction area of about 550,000 square meters, and the tallest building is about 230 meters, with a total investment of about 5 billion yuan. The design scheme of Dutch OMA was adopted in the construction of the new CCTV site. The expert judges believe that this scheme can not only establish the iconic image of CCTV, but also open a new page for the construction industry in China.
National stadium-bird's nest
Total investment: 31.500 million yuan.
As the main stadium of the 2008 Beijing Olympic Games, the "Bird's Nest" has a total construction area of 258,000 square meters, covering an area of 20.4 hectares and a ground height of 69.25438+0 meters. The whole building is oval saddle-shaped, and the concrete structure is mainly divided into one basement and seven floors above ground, forming a three-layer bowl-shaped inclined stand, which can accommodate 9 10000 people.
Shanghai shimao international plaza
Total investment: over 3 billion yuan.
Shanghai Shimao International Plaza, located at the starting point of Nanjing Road Pedestrian Street (near People's Square), has a total construction area of nearly 6.5438+0.7 million square meters, and the main building is 333 meters high, ranking first in Puxi, with a panoramic view of the prosperity of Shili Nanjing Road. Its distinctive and unique architectural art will surely become another landmark landscape of Nanjing Road.
Shanghai Shimao International Plaza 1 1 to 60th floors are five-star Le Meridien Shimao Hotel (with more than 7 10 luxury suites). Its floor-1 to 10 is positioned as a brand-new high-end shopping center on Nanjing Road, which includes a series of functions such as catering and entertainment. The underground shopping mall is near Nanjing Road 165 meters, with elegant indoor space design and dazzling array of goods, becoming another shopping paradise on Nanjing Road. Standing on Shanghai Shimao International Plaza, looking up into the distance, all kinds of customs on the beach are vivid.
Wuhan Tianxingzhou Yangtze River Bridge
The sixth Yangtze River Bridge in Wuhan. The main bridge is 4657 meters long. The highway bridge is a two-way six-lane cable-stayed bridge with a design speed of 80km/h, a main span of 504m and a main tower height of189 m. It is the world's largest span cable-stayed bridge for highway and railway, and the railway bridge can run four trains (two passenger lines and two freight lines) side by side. Because of its unique design and construction difficulties, the bridge is praised as a milestone of the river-crossing bridge by the bridge community.
National Centre for the Performing Arts
Total investment: 2.7 billion yuan
The National Grand Theatre project is located in the west of the Great Hall of the People in Beijing and south of West Chang 'an Avenue, with a total area of 1 1.893 hectares, a total construction area of149,520 square meters and a total investment of 2.688 billion yuan. The main building is surrounded by a steel shell and an interior.
2,465,438+06 opera houses, 2,065,438+07 concert halls, 65,438+0,040 theaters, public halls and supporting rooms. The shell of the outer steel structure is semi-ellipsoid, with the long axis length in the east-west direction of 212.20m, the short axis length in the north-south direction of143.64m, the building height of 46.285m, and the deepest part of the foundation of-32.5m. The ellipsoid roof is mainly decorated with titanium plates, and the glass curtain wall is gradually opened in the middle. Around the ellipsoid shell is an artificial lake with an area of 35,500 square meters, and all kinds of passages and entrances are located underwater.
The National Grand Theatre is 46.68 meters high, 3.32 meters lower than the Great Hall of the People. But its actual height is much higher than the Great Hall of the People, because the underground height of the National Grand Theatre is as high as 10 floor, and 60% of its buildings are underground.
Nanjing Shi Lang City Plaza
Total investment: 2 billion yuan
Shi Lang City Plaza has a total land area of 32,778.7 square meters and a total construction area of about 220,000 square meters. There are super high-rise pure office buildings, star-rated hotels and high-grade businesses in the city square. The main building is 228 meters high and has 45 floors above ground. complete
This design follows the principles of elegance and simplicity. Elegant appearance, the super high-rise main building adopts shiny glass facade, and the top is surrounded by independent glass walls.
National swimming pool-water cube
Total investment: 654.38+0 billion yuan.
The design scheme of the National Swimming Center is the "Water Cube" ([H2O]3) scheme produced by the global design competition. The scheme was jointly designed by China State Construction Engineering Corporation, Australian PTW Architects and ARUP Australia Limited. The design embodies the design concept of [H2O] 3 ("Water Cube"), which integrates architectural design and structural design. The design is novel, unique in structure, coordinated with the national stadium, fully meets the requirements of the 2008 Olympic Games in function, and is easy to operate after the game.
Wuhan qintai cultural art center
Total investment: 560 million yuan.
Qintai Culture and Art Center has a total construction area of 60,000 square meters, mainly including 1.800-seat Grand Theatre, 1.600-seat Concert Hall and ancillary facilities. The cultural square across the lake from the Grand Theatre consists of a hydrophilic platform, a dance floor near the water and landscaping, which can accommodate 30,000 people at the same time. Upon completion, it will become one of the few cultural and artistic centers in the world with a area of 2. 15 square kilometers.
Nanning Wang Di International
Total investment: 500 million yuan
Wang Di International, the tallest building in southwest China, is 276 meters high and has 58 floors. It is located in the only international 5A pure office building in Nanning.