Current location - Recipe Complete Network - Catering franchise - 5 summaries of maintenance personnel's work
5 summaries of maintenance personnel's work
Summary is a kind of written material to review and analyze the completion of a certain stage of work or a certain work afterwards, including achievements, existing problems, experiences and lessons, etc., to provide help and reference for future work. The following is a model essay that I have carefully sorted out for everyone. I hope you like it!

Model essay on work summary of maintenance personnel 1

20__ The first half of the year passed, and with a youthful dream, I stepped onto the stage of the monitor with a fiery heart. The first half of the year passed. In the past six months, I deeply realized the hardships and happiness of being a monitor. I dedicated my youth to my favorite career and to every colleague. The work in the first half of the year has ended and gained a lot. Let me write a little about the first half of the year and set new goals for the second half of the year.

First, ideological understanding

In the first half of the year, as a monitor, I was strict with myself ideologically and loved my career. I was strict with myself according to the monitor's requirements and urged myself to set an example in my colleagues' minds and work. Actively participate in various activities organized by factories and companies, such as lectures by factory supervisors. Over the past six months, I have obeyed the leadership and cooperated with the leadership to do a good job in the production department. I believe that in my future work, I will overcome my own shortcomings and make greater progress through my own efforts with the care of my leaders and the help of my colleagues. In the second half of the year, I will work harder, study hard and practice hard, so that I can truly become a monitor who can stand any test.

Second, the maintenance work

In terms of maintenance work, the task in the first half of the year is very heavy, but in any case, in order to improve my maintenance level, I insist on reading some related books frequently, and often find some mechanical maintenance materials on the Internet, and also strive for opportunities to chat with colleagues and learn from others' strengths. Usually, I also humbly ask experienced teachers. Often go to the equipment site to see, communicate with the production department, understand their defects in equipment operation, take notes and deal with them in a unified way. If it cannot be handled, it shall be reported to the Equipment Power Department through OA process to request technical support.

Third, the work of the monitor.

I am strict with myself, work hard and can complete all the tasks assigned by the leaders. As we are mechanics, this special occupation determines that we still have a lot of work to do. I obey the arrangement of the leader and work hard, mainly to complete the monthly equipment maintenance plan and daily maintenance work, and also to deal with some unexpected accidents. And well completed the tasks assigned by the leaders. In the future work, I will, as always, be down-to-earth, more actively cooperate with the leaders to complete all the work, and work harder for Huafeng's bright future.

Fourth, the attendance rate

I strictly abide by the company's rules and regulations while doing all the work well. Handle the relationship between company work and individuals. So far, I'm still working out the attendance system, adding some actual work conditions to the previous machine maintenance system. I will gradually improve the attendance system in the least time. In the second half of the year, I will be more diligent, work harder for myself, learn professional knowledge and make my business level go up a storey still higher.

To sum up the above points, there are still shortcomings. As the saying goes, "no one is perfect", I will use my time to lead all my mechanical maintenance colleagues to develop their professional skills and find a bigger development stage for themselves and them.

Model essay on work summary of maintenance personnel II

How time flies! It has been nearly half a year since I turned away from the power distribution room in a blink of an eye. Over the past six months, with the correct leadership and care support of the factory department and various departments, I have been working hard and learning new knowledge with a positive working attitude and enthusiastic service spirit. I have done some tangible things for electromechanical groups and departments and achieved certain results. But there are still some shortcomings, which need to be improved. The related work in the past six months is summarized as follows:

I. Work content

My work is roughly divided into mechanical and electrical group work and equipment department work.

Electromechanical group work:

1, organize team members to do a good job of inspection, maintenance and repair of workshop equipment;

2. Participate in patrol inspection and key maintenance work;

3. Responsible for on-site specification and management of electromechanical group and distribution room.

Department work:

1. Safety work: fill in safety inspection records, safety rectification records, monthly safety reports and quarterly safety reports;

2. Quality work: sorting out and maintaining equipment files; Collect and sort out the operation records of ice maker, boiler, power transformation and distribution, equipment oil consumption records and workshop equipment maintenance records; Statistics of equipment integrity rate and efficiency of monitoring and measuring devices;

3, complete other work arranged by the leadership.

Second, the main achievements

1. The placement of personal items, such as teacups and work shoes, is standardized in the electromechanical group.

2, public tools, spare parts and materials should be arranged by special personnel;

3. Organize members of electromechanical group to complete the inspection, maintenance and repair of workshop equipment in time, so as to ensure the normal operation of workshop production equipment;

4. Organize teams and groups to participate in the installation, pay-off, wiring and debugging of new equipment in the workshop in hot summer, so as to prepare for the early production of new equipment;

5. Participate in the local maintenance of energy group equipment to ensure the operation of energy equipment;

6. When the liquid level control system of q 10 machine failed, the liquid level control system of Q10 machine was reformed and the original liquid level controller was repaired. After the liquid level is controlled by the original controller, it runs normally and there is no abnormality so far.

7. Participate in the installation of electrical parts for the transformation of homogeneous cooling water system in pretreatment section;

8. Participate in the installation and debugging of electrical and pneumatic components in the system transformation of cip central station;

9, complete the change of workshop equipment inspection table, increase the intensity of equipment inspection;

10, various records and reports of safety work;

1 1, maintain equipment files and collect equipment operation, equipment oil and workshop maintenance records; Do a good job in the statistics of equipment integrity rate and efficiency of monitoring and measuring devices.

Third, experience

1, improve professional skills in a down-to-earth manner.

As a technician, professional and technical level is fundamental. There is no end to learning technology, and we should carry forward the spirit of hard work and hard work. We should not only learn theoretical knowledge from books, but also explore and accumulate in practice in combination with reality. At the same time, we should also consult modestly and master all kinds of relevant professional knowledge.

2. Study hard and improve management ability.

For me who just engaged in the management of electromechanical group, everything I face is brand-new and full of challenges. I need to enrich myself. In my spare time, I often read some books related to management, or look up some management information and previous management experience on the Internet. It is most important to apply these management knowledge to my work, otherwise it is "an armchair strategist". I have done enough in this respect, and I need to work harder.

Pay attention to thinking, sometimes encounter the same problem, some people handle it properly, and some people handle it hastily. As a manager, to form the habit of being diligent in thinking is to be diligent in thinking when encountering problems at ordinary times and lead the team to solve problems with new solutions.

At the same time, we should communicate with the staff in the class regularly and encourage members to put forward their own views and problems in the department. In order to improve in time!

3. Pay attention to details and grow up gradually.

In the work, any minor mistake may lead to the failure of the whole work. So we should pay attention to every link and do it meticulously. Learn to record everything, every important link, and provide materials and basis for future study and review.

Four. Existing problems and deficiencies

1, sometimes a little careless and careless;

2. Insufficient professional and technical research;

3. Insufficient organization and management.

In view of the above problems, in the future work, we should overcome carelessness, strengthen the study of professional technology and skills, and strive for greater progress. At the same time, we should strengthen the application of the management knowledge we have learned in our work, give full play to the strength of the team, and make our work by going up one flight of stairs.

In short, half a year's work, there are achievements and shortcomings, joy and bitterness, but harvest is the theme. Although I didn't do anything earth-shattering, I reflected the meaning of work and the value of life in every little thing. In order to exercise myself and grow into a useful person. In the future work, I will work harder, constantly improve myself and improve myself.

Maintenance personnel work summary model essay 3

In the busy work, 20 years passed quickly. In a year's time, with the care and help of leaders and colleagues, I have given full play to my work skills, and my work and business level have made great progress through my continuous efforts. Continuously improve working methods and improve work efficiency. Summarize the past and learn good work experience. Below I will make a summary of all the work in 20__ years.

1, working conditions

Our main job is to cooperate with maintenance, emergency rescue, spare parts collection, or clean up the garbage, scrap steel and old spare parts left over from on-site production and maintenance. Can complete the tasks assigned by the leader, check spare parts quickly and safely, and clean up. Sometimes equipment maintenance can actively cooperate with maintenance work. When the equipment maintenance is busy, most of them are fighting in the workplace for more than 14 hours a day. Because the car use plan is not standardized and the demand is tight, they have to run back and forth in the workshop hundreds of times every day, sometimes it takes a long time to fix it, and they can't rest after working overtime. In addition, my car is noisy, the cab temperature is high and the heat dissipation is poor, so the whole person is like taking a bath. Moreover, under the working environment of narrow road surface and poor road conditions in our workshop, we all have no complaints, can treat them correctly, work hard and complete various tasks seriously.

2. Security aspects

At work, we can be strict with ourselves, consciously abide by labor discipline and safety operation rules, study traffic regulations seriously, and strictly abide by traffic regulations and factory rules and regulations. Earnestly complete their own work, so as to achieve the safety production policy of sounding the alarm, putting safety first and putting prevention first. It plays a preventive role. There was no violation of discipline and discipline and no liability accident in the whole year. Under the condition of ensuring driving safety, we have achieved: study hard and constantly improve safety quality. As a driver, when the motor rings, I concentrate and turn the steering wheel, I try my best to ensure safety. Although the driver's job is monotonous, he needs a strong sense of responsibility and cannot be careless when driving. He should concentrate on driving a good car, always want to be safe, prevent accidents everywhere and be safe.

3. Respect discipline and discipline

Strictly abide by the rules and regulations formulated by the company, do not fight, steal, do anything that will damage the corporate image, respect leaders, unite colleagues and work hard. Concentrate on work, do not violate labor discipline and factory rules and regulations, take the factory as the master and safeguard the interests of enterprises.

4. Main problems and next steps.

I. Main issues

1, lack of serious work, lack of initiative, and little understanding of unsafe factors in the workshop.

2. Due to the poor road conditions, narrow roads and many intersections in our workshop, there are overspeed behaviors caused by unsafe factors.

3, vehicle maintenance, maintenance, repair and other work is not in place.

Second, the next step.

1. In the new year, we will face the production of two engines, which is twice as busy as this year. Then we must do our job well, do not overspeed, overload and other illegal acts, ensure safe production, and strengthen the maintenance, inspection, repair and maintenance of vehicles. Only good maintenance can ensure safe driving. Provide favorable conditions for production and maintenance.

In the new year, we should study traffic laws and regulations harder and strengthen our safety awareness. We should correct our shortcomings, unite as one, do our own work well, strive to better complete the tasks assigned to us, and strive for a higher level of military work.

Maintenance personnel work summary model essay 4

The work of the equipment department was completed in 20__. Looking back on this year, with the guidance and help of department managers and supervisors, my business skills have advanced by leaps and bounds. At the same time, under the direct leadership of the manager and supervisor, my work has been carried out smoothly. As an equipment man in the equipment department, I must first improve my skills in order to work better. In order to improve my skills, I want to sum up my personal work in the past year, so as to better carry out my work next year.

I. Daily inspection

In the face of 24-hour uninterrupted operation of equipment, only by strengthening inspection can we better understand the health status of equipment, eliminate hidden dangers in advance, and prevent problems before they happen. Before going to work every day, I will check the operation of each fan in the paint line, check whether the motor and shaft of the fan are abnormal, and whether the fixed seat and bolt are loose or fall off; Check the heat exchanger of EN air intake system for cracks and water leakage; Check whether the water cooler works as an alarm; Check whether the air pressure, water pressure and working temperature of the incinerator are normal and whether the motor is noisy; Check whether the pressure difference of the dehydrator is within the range and whether there is an alarm (if there is an alarm, solve it according to the fault); Check whether the motor in the dewatering area is running normally (I have been monitoring the abnormal operation of a motor in the dewatering area); Check whether the chain line runs normally; Check the pressure, temperature and working conditions of four air compressors and two dryers in the air compressor room; Check the water temperature and water pressure of steam room and softened water room, and check whether the motor water pump is running normally. Through the inspection of the whole spraying line equipment, I can know the running state of each equipment at any time, and carry out maintenance work according to the actual situation of each equipment, so as to prolong the service life of the equipment, reduce the production and maintenance costs, and finally realize the maximization of enterprise benefits.

Second, the equipment operation and maintenance records

In addition to the inspection of equipment, I also advocate good interaction between equipment maintenance personnel and production operators, strive to realize early detection and timely maintenance of equipment defects, fully understand the temper and focus of each equipment, so as to facilitate rapid and predictable equipment maintenance, and focus on tracking the inventory of vulnerable and consumable parts and spare parts. Lubricate each refueling point of the equipment regularly, so as to avoid increasing the failure rate due to equipment wear caused by poor lubrication. I not only check the exhaust fan in each spraying room of the spraying line every day, but also regularly monitor the temperature of the fan shaft and motor with infrared thermometer and make records. Not only that, I keep records of bearings, belts, water pipe fittings, screen cotton, water pump seals and all other commonly used things. And track the inventory situation at any time, so that maintenance and replacement can be more timely and rapid. Also cooperate with department leaders to formulate work instructions, maintenance procedures, equipment operation, inspection and maintenance records, etc.

3. Equipment maintenance

The hidden dangers I found in the normal production process of the company have been eliminated in time if they can be solved in time. Write down some problems that need to be solved when the line is stopped, and eliminate them at the first time. If it can't be solved, please consult the manager and supervisor. For example, in the middle of the year, I usually monitored the vibration of the exhaust fan in the spray booth. Under the leadership of the manager, all the fans were corrected and balanced, and the hidden dangers were solved. For the phenomenon of high conductivity of reverse osmosis equipment, I strengthened observation, increased cleaning times and replaced the filter element of security filter, and the effect was obvious. Every time I stop the line, I will comprehensively maintain the chain equipment, air intake equipment, air exhaust equipment, various circulating pumps, as well as the air compressor, dryer, dehydrator, cooler, incinerator, slag scraper, lithium bromide equipment, 2TDI system, 3TDI system and hot water circulation system of the spraying line, so as to ensure the auxiliary equipment to run 24 hours a year with low failure rate.

Four skills improvement

I think that if a worker wants to do a good job, he must sharpen his tools first. You sharpen his tools, he should put them down first. Only by strictly strengthening the management and maintenance of equipment and changing the passive situation of equipment maintenance can the production run normally. After nearly two years of equipment maintenance, under the careful training of managers and supervisors, my skills have changed greatly compared with those when I entered the factory. I also used books and the Internet to inquire about the relevant information of my equipment, so as to learn and master their performance, safety regulations and maintenance as much as possible. At the same time, I also strengthen the study of electricians, and strive to be unique in the field of mechanical and electrical maintenance.

Five aspects that need to be improved

By improving the level of self-maintenance, we strive to save money on equipment maintenance costs, such as decomposing and repairing damaged and expensive parts, making the maintenance work detailed into parts, narrowing the fault range, maintaining the equipment with the lowest maintenance cost and avoiding directly replacing new spare parts. Reduce the number of external repairs of equipment and increase the intensity of internal repairs. For equipment maintenance, the service performance of the equipment can be ensured by changing the maintenance frequency and the downtime can be reduced.

To sum up, as an equipment member of the company's equipment department, I have the responsibility and confidence to continuously strengthen my study and improve my maintenance skills. I will work diligently and pragmatically around the annual target set by the company, and fully cooperate with the direct leadership and the production department. At the same time, strengthen the cooperation between colleagues, improve their mutual cooperation ability, and make the team department more United and more fighting. In my future work, I believe I have the ability and confidence to face difficulties and meet challenges bravely under the leadership of the department manager.

Maintenance personnel work summary model essay 5

20__ years have passed in busy and orderly work. Looking back on this year's work, I think there are two main aspects:

First of all, make your own work guidelines:

1, so that every job is operated according to the safety standard process to prevent safety accidents;

2. Visit the store at least once a month, communicate with the store management in time for the problems found in the inspection, solve them directly on the spot, and feed back the problems raised by the store to the department leaders in time, do the work that needs to be done well in the shortest time, find them in advance and solve them quickly, so as to nip in the bud;

3. Adjust the circuit decoration work of the shop, make plans in advance, prepare materials, resolutely not delay the shop decoration, and ensure high-quality and efficient completion of the work;

4. Communicate with the store by telephone in view of the sudden problems of electricity facilities, initially estimate where the problems are, and lead relevant personnel to prepare related objects and tools so as to quickly troubleshoot after arriving at the scene;

5. Adhere to the principle of saving: try to repair the damaged items in the store without replacing them with new ones, choose the ones that really need to be replaced with high quality and low price, and collect and sort out all kinds of reusable materials (such as plugs, etc.). ) for reuse;

Second, the main work in the past year:

The main work in June 65438 was the opening of Tianbang Supermarket and the adjustment of Haitan Supermarket. In a month's time, I took the initiative to take the lead, carefully studied with my colleagues in the equipment department, strictly laid out the layout and standardized the construction, and ensured that the opening of Tianbang Supermarket and the adjustment of Haitan Supermarket were completed on time and with good quality.

In February, the main work was the renovation and opening of major appliances in Xin 'an Shopping Plaza. Due to the tight time, there are many places where home appliances need electricity, and it also involves the layout and construction of brands and booths. According to the company's requirements and work flow, we worked overtime and meticulously, so that all the electricity facilities were successfully installed and the water test was successful at one time, which made good preparations for the smooth opening of home appliances in Xin 'an Shopping Plaza on May/KLOC-0.

From March 6 to September, it was mainly the renovation adjustment of the East Building of the head office and the preparation for the opening of Zhuoting Supermarket. The reconstruction of the East Building of the Head Office is the biggest project this year, involving many facilities and heavy workload. The replacement of escalators, the adjustment of circuits, the decoration of suspended ceilings, the follow-up of the decoration of various characteristic pavilions, and the arrangement and follow-up of electricity consumption in characteristic pavilions all require equipment. So I have to work overtime every day for three months, but I am not intimidated by fatigue and workload. I carry forward Nakazawa Tomohide's spirit of not being afraid of hardship and tiredness, work actively and conscientiously, and complete all the tasks assigned by the company with clear thinking, and make my own contribution to the decoration of the East Building of the head office. In September, with the renovation of the East Building, there were preparations for the new store Zhuoting Supermarket. Originally, the equipment department was understaffed, and the stores near the Mid-Autumn Festival were also busy, and no one had to be transferred. Facing the work, we have a group of equipment people who are not afraid of difficulties and prepare all the equipment needed for opening in time in strict accordance with the company's requirements. For facilities that need electricity, from the lighting of the main light strip to each socket that needs to be used, the installation of UPS and the electricity construction of tenants are carefully put in place. After unremitting efforts, we successfully completed the transformation of the East Building and the opening of Zhuoting Supermarket.

The main work after 4.9 months, in addition to the daily shop patrol, part of the maintenance work that shops need is to make a statistical summary of the water pipes that need to be insulated in winter in advance, and handle all the water pipes that need to be insulated in each shop to prepare for winter. Another major task is to sort out idle equipment. All the idle shelf equipment and accessories are concentrated in Liuhuapo's equipment warehouse, and everything is sorted out for standby.

In the new year, we will continue to carry forward the spirit of Nakazawa Tomohide, strictly abide by the company's safety operation norms and various management regulations, and complete all the work in a timely, safe, efficient and economical manner under the guidance of leaders.

Maintenance personnel work summary model essay 5 related articles:

★10 Model essay on summary of maintenance work in 2022

★ Selected maintenance work summary model essays

★ Excellent model essay for maintenance work summary

★ 5 maintenance work summaries and personal essays.

★ Five selected maintenance summary essays.

★ Model essay on customer service staff's work summary in the first half of the year (8 selected articles)

★ Latest model essay on property maintenance 10.

★ Excellent model essay on maintenance electrician's work summary

★ Model essay 202 1

★ Five selected essays on the annual work summary of automobile maintenance.