Current location - Recipe Complete Network - Catering franchise - Timetable of the First and Last Bus of Metro Line 7
Timetable of the First and Last Bus of Metro Line 7
The timetable of the first and last buses of Metro Line 7 is as follows:

Brief introduction of Shenzhen Metro Line 7;

Shenzhen Metro Line 7 is a subway line in Shenzhen, Guangdong Province, China. It was put into operation on 2065438+2006128 October, and its logo color is dark blue.

As of June 2022, Shenzhen Metro Line 7 starts from Xilihu Station, passes through Nanshan District, Futian District and Luohu District, passes through Longzhu Avenue, Fumin Road, Huaqiang North Road and Tianbei Road, and ends at Taian Station.

As of June 2022, the total length of Shenzhen Metro Line 7 is 30. 197 km, all of which are underground. * * * There are 28 stations, all of which are underground stations; The design speed of the train is 80km/h, and six A-type trains are adopted.

As of June 20 19 and 10, the average daily passenger flow of Shenzhen Metro Line 7 was about 570,000.