Current location - Recipe Complete Network - Catering franchise - Construction technology of indoor secondary decoration
Construction technology of indoor secondary decoration
Directly by the construction unit to apply for fire control procedures. When performing interior decoration and going through fire control examination and approval procedures for public entertainment places such as song and dance halls, Internet cafes and bars with a building area of 300 to 500 square meters and other crowded places with a building area of 1000 square meters, the fire control design documents submitted by the construction unit can be decoration forms, structural and functional sketches or schematic diagrams, sketches of automatic fire control facilities and lists of fire control performance materials. The fire safety inspection of public gathering places by the fire department was shortened from 7 working days to 5 working days before it was put into use.

The principle of territoriality shall be implemented in fire protection design and completion acceptance, and all construction projects that should be filed according to law shall be reported to the local county (city) and district-level public security organs for supervision and spot check. The detachment shall conduct spot checks on high-risk fire places according to law.

Expand the coordination between the approval process of data secondary decoration and the drawing review organization. The checking organizations in the construction drawing checking system are randomly selected, and each checker will look at the drawings in a different way, but the most important thing is to communicate in time after confirming the checking organizations, so as to avoid the problems being checked from being submitted to the system quickly.

Some areas are subject to administrative punishment by the housing construction department, and some areas will also record the bad behavior of the main unit, which will affect the economic benefits and industry reputation of the design unit.

Such as fire extinguishers and fire sprinklers, which are the simplest things. But many design units are planted in this point, such as the sprinkler, missing a fire extinguisher and ignoring the bathroom. Often a slight negligence is a violation of mandatory provisions, and if there is no benign communication with the drawing review agency, the consequences may be very serious.

Phoenix. Com- Harbin fire control approval procedures simplify the approval of entertainment venue decoration, which is more convenient.