Current location - Recipe Complete Network - Catering franchise - Construction engineering design cost
Construction engineering design cost
China civil construction engineering design charging standard

charging item

1. Engineering design fee: generally including preliminary design and budgetary estimate, construction drawing design, cooperative construction stipulated in the contract, design technical disclosure, participation in trial operation, project completion acceptance and other expenses. This charging standard does not include the cost of making the construction drawing budget.

2. Pre-design work expenses: expenses for preparing feasibility study report, designing task book, participating in site selection and planning, and conducting environmental pre-assessment.

3. Design fee for non-standard equipment: refers to the design fee for non-standard equipment. In some industries, engineering design itself includes equipment design, so non-standard equipment design fees are not charged separately.

4. Software compilation fee: refers to the compilation fee of computer control programs in the production process of the factory. If there is no standard in the industry, it can be agreed by both parties according to the use value and advanced degree of the software and considering the actual workload of writing the software.

Second, the charging standard

1. When only the preliminary design or construction drawing design is entrusted, the charge shall be calculated by dividing the design workload by the proportion of the industry and multiplying it by the coefficient 1. 1. If the construction drawing budget is increased, the fee shall be calculated by multiplying the engineering design fee standard by the coefficient 1. 1.

2. Engineering design adopts standard design (except standard drawings) and reuse design, and similar new design projects are charged at 20%.

3. Engineering technical consulting services, technical services such as participation in planning and investigation, inquiry, quotation and foreign negotiation, and work without specific charging standards can be charged according to the number of days of employees of direct producers, and the charging standard is 85 yuan per working day. The calculation of working days can be based on the work task, based on the working day quota, or determined by the designer and the client through consultation when signing the contract. For tasks that need to travel to other places with a construction period of less than 60 days, the travel expenses shall be borne by the entrusting unit. When an engineering design unit needs to go abroad due to the tasks it undertakes, except for the manufacturing and installation expenses paid by the design unit, other expenses for going abroad (including foreign exchange quota) shall be paid by the entrusting unit.

4. In this charging standard, various adjustment factors affecting the design workload are considered. If two or more factors exist in the same project at the same time, the total adjustment coefficient of the project should be the sum of the decimal places of each single adjustment coefficient plus 1, but the maximum value of the total adjustment coefficient should not be greater than 1.5.

5. If the design fee is calculated according to the physical object or man-day quota, the project with an investment of more than 300 million yuan shall not be more than 0.5% of the estimated proportion of 65438.

6. The engineering design unit adopted advanced technology in the design and achieved good economic benefits. After the design review is confirmed, the higher-level competent review department may decide to appropriately increase the design fee, which is generally controlled within 10% of the design fee. If the design quality and technical level can not meet the requirements of the contract, the design fee shall be deducted according to the provisions of the contract.

7. The design fee shall be allocated by stages according to the design progress. After the design contract comes into effect, the entrusting party shall pay 20% of the design fee in advance to the design unit as a deposit; Pay 30% after the preliminary design is completed; Pay 50% after the construction drawing is completed. According to the Regulations on Construction Engineering Survey and Design Contracts, after the design contract is fulfilled, the down payment will be used as the design fee. After the design fee is paid, the design unit shall cooperate with the construction of the construction project that undertakes the design task, participate in the trial operation assessment and project completion acceptance, and shall not charge additional technical service fees and travel expenses.

8. For items not included in this charging standard, the design fee shall be determined by the design unit and the entrusting unit through consultation with reference to this charging standard. The design fees for foreign-funded and Sino-foreign joint venture construction projects may be determined by the designer and the entrusting party through consultation with reference to relevant foreign design fees.

9. If an architectural design scheme needs to be put forward separately, the architectural design scheme of super-class and first-class engineering shall be charged at 10% of the engineering design fee; 6% of the project design fee is added to the architectural design scheme of the secondary project; 3% of the project design fee is added to the architectural design scheme of the third-level project; There is no additional architectural design fee for projects below Grade 4 (including Grade 4). The "big" in the scale of civil construction projects generally refers to buildings of 1 10,000 square meters or more; "Medium-sized" refers to a building with an area of 3,000 to10,000 square meters; "Small" refers to buildings below 3000 square meters.

10, this charging standard has included the corresponding general fire protection system and architectural decoration design fees, and will be discussed separately if there are special requirements. When the existing building is specially decorated, it will be charged at 3-5% of the decoration cost according to the complexity of the decoration design.

1 1. This charging standard is based on individual projects, excluding the design of single buildings and structures such as gas, water intake, purification, sewage treatment, roads and bridges, boiler rooms, gas stations, power transformation and distribution stations, water pump houses, cooling towers and chimneys. , the charges should be implemented in accordance with the standards of municipal and other industries.

12. When only preliminary design of civil buildings or phased design of construction drawings are done, the workload ratio is 40% and 60%.