The work summary in the third quarter is an evaluation of the previous work, and we must adhere to the principle of seeking truth from facts. The following is a summary of my work in the third quarter for your reference only!
Part I: Section III Summary of Supervision Work
I. Overview of the Project
Fuchunjiang Road South Extension Phase I starts from Fuchunjiang Road in the north, crosses Li 'an Mountain in the south, and connects with Grain Rain Wanglian Line. Fuchunjiang Road is the main urban road extending to the south, and the carriageway is viaduct-type, which crosses the Beilun branch line of Xiao Yong Railway, the extension line of light rail 1 line (long-term) and Qiantang River South Road (long-term). Fuchunjiang Road South Extension Phase I Project is divided into two parts: tunnel section and elevated section. This project is an elevated section, and the implementation scope of the project is as follows: the east half of the main line (starting point of the viaduct to Fuchunjiang Road, pile number YK 1 1+480? YK 12+790, total length of the route 13 10m). The bridge project starts from the pile number k 1 1+489 in the south and ends at the pile number k 12+496 in the north, with a total length of 1007m, and the off-ramp interface of Qiantang South Road Interchange is reserved; Project investment estimate: 77.28 million yuan, and the planned construction period is 400 days.
Second, the basis of supervision
According to national policies, regulations and laws, the supervision department issued technical specifications and evaluation standards, as well as supervision contracts and construction contracts, which are mainly as follows:
1, Code for Construction Acceptance of Urban Roads and Bridges;
2, the municipal bridge engineering quality inspection evaluation standard "(CJJ2? 90);
3. Technical Specification for Construction of Highway Bridges and Culverts (JTJ04 1? 2000);
4. Construction supervision specifications;
5, engineering design drawings;
6. Supervision planning and supervision implementation rules;
Third, the supervision work
Supervision Work The project supervision team shall carry out its work according to the company's quality policy and objectives, the agreement with the project owner, design documents and relevant standards and specifications. In order to ensure the quality of the project, we should first improve the professional level and ability of the supervisors and make full use of the time to familiarize ourselves with the engineering drawings and related documents of this bridge. The whole team cooperated closely, and insisted on controlling the construction quality in all directions and in the whole process by means of patrol, tracking, standing by, re-examination and sampling inspection. Do things according to standards, speak according to data, and work hard? Three controls, two tubes and one coordination? And the engineering quality is guaranteed.
1, strictly control raw materials and equipment: all kinds of raw materials must be qualified by the quality inspector and approved by the supervisor before entering the site for use. Steel, cement, bearings, coarse and fine aggregates and concrete additives. , in addition to requiring the construction unit to provide the factory quality certificate, it also conducts sampling inspection as stipulated in the specification; The varieties, specifications and standards of various raw materials are required to meet the engineering requirements. During the construction of bored piles in the lower part of the project, the supervisor found that some yellow sand contained artificial sand, immediately stopped it and asked to be removed from the site.
2. Sub-project inspection system: Before each sub-project starts, it is necessary to carefully check whether it meets the starting conditions, otherwise it will not be started. After the completion of each subdivisional work, it must pass the self-inspection and be reported to the supervisor for acceptance before the construction of the next working procedure can be carried out.
3. Focus on the implementation of the supervision station system: implement the station system in the concealed works and key parts of the project, keep records and carefully check the compliance of various indicators. In the process of concrete pouring, the mixture ratio is strictly controlled, and aggregate is often weighed randomly. In addition, the construction personnel are often urged to fully vibrate the concrete to ensure the internal quality of the components. Do slump test on the construction team's site, and check the whole process of sampling frequency, sampling method and compressive strength test together with standing by. In the process of concrete pouring, in addition to controlling the concrete mixture ratio to ensure the strength requirements, the workability, water retention and final setting time of concrete are also controlled by field tests and additives.
Fourth, the engineering quality and safety status
1, the reinforcement, formwork, shape and size of the bearing platform are strictly controlled in accordance with the allowable error range in the Standard for Quality Inspection and Evaluation of Municipal Bridge Engineering (CJJ2-90).
2. The pile foundation of this bridge has been tested by Zhejiang Geophysical Technology Application Institute, a legal testing unit, and the result is qualified.
3. The model, specification, size, quantity, welding conditions and concrete strength of steel bars meet the actual requirements.
Verb (abbreviation of verb) project progress
The construction contractor is required to put forward the general project progress plan, annual and monthly construction progress plan and monthly report according to the contract requirements, review and supervise their implementation, compare the planned progress with the implementation progress in time, notify the project owner on a monthly and weekly basis, instruct the contractor to make adjustments in case of deviations, and urge the contractor to put funds, machinery, materials and labor in place in time. At present, the project has completed 166 foundation pile and 7 excavation caps. Through the joint efforts of the owner, the supervisor and the construction unit, the foundation pile construction progress has been overfulfilled.
Six, engineering survey
Carefully review the application for project payment submitted by the contractor, verify the engineering quantity on site, issue the payment certificate, and ensure that unqualified projects are not measured. Strictly review the records and arrangement of all kinds of evidence and materials required by the contractor for additional compensation, carefully review according to the design drawings, records and actual situation on site, sign and recognize the measurement in time according to the requirements, control the project cost, and strive to make the project cost not exceed the planned cost.
Seven, supervision experience
Judging from the current situation, the contractor attaches great importance to the construction quality of this project. Due to the limited technical professional quality and supervision level of our supervision, there are some shortcomings in our work. In the future, we still need to make continuous efforts in supervision work, fully realize the high responsibility of supervision work, and never be careless about the quality of the project. It is necessary to strengthen business study, improve business level, strengthen supervision, and further improve supervision and business level.
?
Part II: Section III Summary of Supervision Work
One,
1, Work Completion of Zunyi Cigarette Factory Safety Construction Project of Guizhou China Tobacco Industry Co., Ltd. in this quarter
1) Daily inspection of Zunyi Cigarette Factory.
2) Supervise the computer room construction and equipment debugging of South China Information Department in Gonggongshan, factory and Maocaopu.
2. Zunyi Security Project of Guizhou Zhongyan Commercial Co., Ltd.
1) Collect the audit settlement report of Zunyi Commercial Security Project Phase I and Phase I supplement;
2) Assist Cheng Haiyang to count the number of webcams and alarm devices in the first-phase security project.
3. Technical transformation project of Guiyang Cigarette Factory of Guizhou China Tobacco Industry Co., Ltd.
1) Conduct routine inspection on the technical center building to understand the construction content, process and scale of the factory security project.
2) Participate in the project construction coordination meeting organized by the headquarters.
3) Communicate with South China Information and Zhejiang University on project construction.
4) Assist in solving problems in engineering construction.
4. Acceptance of Qiannan Security Project of Guizhou Zhongyan Commercial Co., Ltd.
1) security engineering acceptance in Qiannan prefecture, and acceptance in Dushan and Weng 'an counties, including 9 construction sites. The main construction contents are monitoring system, perimeter alarm system and patrol system.
2) Prepare special acceptance reports for Dushan and Weng 'an counties.
5. On-site technical renovation project, security project and computer room renovation project of Bijie Cigarette Factory of Guizhou China Tobacco Industry Co., Ltd..
1) Daily patrol inspection and construction quality inspection of the factory, including the factory joint workshop, fire garage, new canteen and new computer room of the comprehensive building.
2) Participate in the discussion and coordination meeting on the progress of technical transformation projects.
3) Complete the acceptance of Yangjiatang.
4) Assist in the renovation of computer room and fund-raising for Yangjiatang security project.
5) Submit weekly supervision report and technical transformation project plan on a regular basis.
6) Arrange and collect the process documents and related materials of Bijie factory project.
7) Organize a technical renovation project progress meeting every Friday, mainly to report the progress of the project and discuss the problems encountered in the construction process.
8) Supervise the contractor of the computer room renovation project to finish the finishing work as soon as possible, so as to make an early acceptance.
9) Assist the contractor to solve the problems encountered in the construction, and convey and implement the requirements put forward by the owner.
10) Coordinate the relationship between the project contractor and the owner and other construction units.
Second,
1) Problems and solutions encountered in this quarter's work. In the acceptance of Qiannan security project, there is a lack of acceptance data and equipment auxiliary data. After communication and consultation with the owner and the contractor, the contractor is required to supplement some missing acceptance documents and deliver the equipment and auxiliary materials to the site within the time limit required by the owner.
2) The outdoor plum blossom pipe of Guiyang New Factory Technology Center Building was damaged by a forklift when cleaning up the garbage. After communicating with the person in charge of the telecommunications company, the telecommunications company replaced the damaged plum blossom tube the next day. The ground conduit line interface of the conference room on the 9th floor was illegally buried. After investigation and communication with the site responsible for the first bid section and the site responsible for the second installation, it was decided that the first bid section would excavate the ground by itself to find the line interface and be responsible for the recovery of the excavated part.
3) During the acceptance of Yangjiatang Reservoir Area of Bijie Cigarette Factory, the linkage function of fire control, monitoring and broadcasting system could not be verified temporarily because the fire fighting equipment was not put into use. Due to the construction of the fire pool, the fence collapsed, and the sector 1-5 cannot be verified temporarily. In addition, the resistance value of outdoor cabinet lightning protection grounding has not been tested, and according to the bidding documents, the resistance value should reach 4 ohms. After communication and consultation with Jinbo, the owner and the contractor, it is decided to leave the above problems behind and test and verify them after the conditions are met; During the construction of the joint workshop, it is necessary to deepen the operation above the ceiling of the corridor in the third district because of the need to increase the high-voltage electric bridge. At present, the work above the ceiling has been suspended, and the deepening plan will be re-formulated after the arrival of the design institute.
Three. Work plan for the next quarter
1) Do a good job of handover with Liu Da.
2) Seriously study the information system supervisor tutorial and take the supervisor exam.
3) Carry out daily inspection and construction quality inspection for technical transformation projects in the factory and safety projects entering the site in the future.
4) Timely release project-related documents, work contact sheets, meeting minutes and memos.
5) Maintain and implement the regular meeting system of Bijie factory.
6) Communicate with the owners and contractors regularly, and maintain our relationship with the owners and contractors, as well as the relationship between the owners and contractors.
7) Treat the work and projects carefully according to the company's KPI content.
8) Pay attention to potential business opportunities, and help improve the business capability of the department.
9) Assist the superior supervisor and complete the collection at the same time.
10) Supervise the technical renovation project contractors and strive to complete 80%-90% of the construction content before the end of the next quarter.
1 1) Complete the project acceptance of Guiyang Factory Technology Center Building.
12) Collect professional and related professional data, summarize the experience of supervision projects, improve self-working ability, and grow into a professional supervision engineer at an early date.
Fourth, personal feelings.
In a blink of an eye, this quarter is coming to an end. This stage is difficult and contradictory. With the gradual increase of workload and work content, I have some questions about supervision work. Regulation should be defined. What is its function? Or how should I look at my work? In retrospect, I think my main job is to write various documents repeatedly. According to the company's KPI assessment system, the weight of documents accounts for 70%. Although this is enough to reflect the importance of documents, I also understand that documents are the embodiment of work value and project results.
I think life and work should be fun, but I can't find fun in my present job, but there will be some resistance and pressure, and I believe some new colleagues will feel the same way. Maybe there is something wrong with my work ability and attitude, but I hope I can find this fun and share it with you.
I feel that there is too little communication between our colleagues and the relationship is unfamiliar. It may be due to time or the nature of work, but I hope to increase communication and interaction between colleagues in the future (I suggest organizing more activities and parties, etc.). ) to enhance our relationship and create a lively and harmonious working atmosphere, not too formal and procedural.
In addition, I also suggest that the company can improve and perfect its own process while standardizing our business trip system, which should be handled in a more effective and humane way.
At the same time, I think An Meiqin is a competitive and humanized team. Caring for and accommodating employees, paying attention to corporate image and cohesion are our excellent qualities. I also hope that An Meiqin can create better team spirit and quality. I will work harder and finish my work in the next quarter.
?
Chapter III: Section III Summary of Supervision Work
I. Overview of the Project:
The construction project of rural students' dormitory and teachers' public rental housing in Qixingguan District, Bijie City, Guizhou Province is located in the sixth and eighth districts of Haizijie Town, Yachi Town, Qianxi Township, Salaxi Town, Changchunbao Town and other primary and secondary school teachers' public rental housing and student dormitory projects in Qixingguan District, Bijie City, Guizhou Province, with 64 projects in 5 townships and 2-5 floors high. The general situation of this project is as follows:
(1) Project Overview
Construction unit; Investigation unit of Qixingguan Education Bureau, Bijie City, Guizhou Province; Bijie base co., ltd
Design unit; Supervision unit of Guizhou Shenzhen-Hong Kong Zhongtian Architectural Design Co., Ltd.; Quality supervision unit of Guizhou Construction Supervision Consulting Co., Ltd.; Bijie qixingguan district quality inspection station
Contractor; The contracting scope of Henan First Construction Engineering Group Co., Ltd., Zunyi Fucheng Construction Co., Ltd. and Guizhou Bijie Yutong Jianye Co., Ltd.; Building structure, decoration and warranty stage (II) Overview of architectural design;
2. 1, project name and address;
2. 1. 1, Changchunbao Middle School, Changchunbao No.2 Middle School, Huashi Primary School, Ganyan Primary School, Wu Xia Primary School, Nude Primary School and Hezhuang Primary School in Qixingguan District, Bijie City, Guizhou Province.
2. 1.2. Overview of architectural design
2.2. 1, Haizi Street Central School, Haizi Street, Bijie City, Guizhou Province, Zhang Wang, 13 mu, 50 mu, Shaoba, Qiansuo, Mud, Duck Pond and Sand Whistle.
2.2.2. Overview of architectural design
2.3. 1, Qianxi Township Central School Primary School, Qianxi Middle School, Shakuo, Franc, Zhongtun and Qianlanggou, Bijie City, Guizhou Province
2.3.2. Overview of architectural design
2.4. 1, Salaxi Central School, Bijie City, Guizhou Province, Salaxi Middle School, Shaba, Xinglong, Shale, West, Liu Yang, Yongxing, Baishan, Ying Chao, Chang Ying, Gaoying, Longchang and Xiaolong 2. 4.2. Overview of architectural design.
2.5. 1, Meichong Primary School, No.18 Primary School, Yihe Primary School and Yachi Primary School 2, Yachi Town, Bijie City, Guizhou Province. 5.2, architectural design overview
(III) General situation of structural design
(4) Overview of strip foundation, independent column foundation and raft foundation.
(v) Status of the project
This project is located in Haizi Street Town, Yachi Town, Qianxi Township, Salaxi Town, Changchunbao Town, Qixingguan District, Bijie City, Guizhou Province. In all schools, the geographical location is superior and the transportation is convenient. The maximum backfill depth of this project is about 2.5m to 3.5m.. ..
Second, the status quo of the construction image progress:
2. 1. 1 At present, the main work image progress is as follows:
2. 1.2 Image progress of other parts of the project: the main project was fully completed from June to mid-June of 12, and the foundation and main parts were segmented. The engineering inspection lot is qualified, and the engineering quality is qualified.
Three. On-site supervision organization and completion of on-site supervision operation documents:
3. 1. Project supervision organization:
According to the work arrangement and requirements of the owner and the project management department, all the staff of the on-site supervision agency of the 20XX rural boarding project in Qixingguan District, Bijie, Guizhou Province not only keep full attendance, but also consciously go to the site to perform their duties even on holidays as long as the on-site work requires. List of current actual on-the-job personnel of the project site supervision organization.
3.2. Completion of on-site supervision operation documents:
Up to now, there are 64 projects in six districts and eight districts of the 20XX rural boarding project in Qixingguan District, Bijie, Guizhou. According to the supervision contract, the engineering construction supervision specifications and the company's quality management system documents, the supervision organization compiled the on-site supervision operation documents, reviewed and approved 30 supervision plans and 336 supervision implementation rules, including: supervision plans, supervision rules and supervision rules list.
Four, supervision quality control work completion:
4. 1. Technical preparation
According to the construction characteristics of 20XX rural boarding project in Qixingguan District, Bijie, Guizhou Province, our site supervision organization has compiled GB standards and specifications for various professional projects related to this project construction, a compilation of mandatory national standards for related project construction, and several acceptance specifications for related professional projects. In addition, the familiarity and understanding of contracts, design documents, construction codes and standards and relevant national mandatory standards provide basic guarantee for the smooth development of on-site supervision work.
4.2. Complete the quality control procedure.
According to the national engineering construction supervision standard and the specific requirements of the quality control work of the project management department, the main workload of the project site supervision organization includes:
4.2. 1. Seven copies of supervision engineer's contact sheet to remind the owner and general contractor to take corresponding measures or methods in time according to the situation of the project site to avoid the occurrence of engineering problems;
4.2.2. Twenty-five copies of supervision engineer's notice will be issued in time for the quality problems existing in the site, and the construction unit will be urged to rectify in time to ensure that the quality of the site project is always under control;
4.2.3. Twenty-nine copies of construction organization design, temporary electricity utilization scheme and construction technical scheme, which have been reviewed, improved and approved by the supervisor;
4.2.4. According to the owner's relevant work arrangements and requirements, combined with the actual site construction, timely and effectively organize and implement all kinds of special inspection of project quality, report six special reports of the owner's various quality inspections in writing, and track and implement related matters at the same time;
4.2.5. According to the actual situation of on-site construction quality, the supervisor shall effectively preside over all kinds of thematic coordination meetings 12 times in time, coordinate and deal with quality-related issues, and implement the minutes of thematic coordination meetings at the same time;
4.2.6. The site supervisor shall strictly control the quality of all professional engineering materials and components entering the site. After inspection and acceptance, the supervisor agreed to use 26 inspection sheets of engineering materials/components/equipment for 20 batches. Among them, unqualified steel bars 1 batch were found and all of them were withdrawn.
4.2.7. Civil engineering, water supply and drainage, electrical professional according to the requirements of design and specification, and combined with the actual construction site, timely and effectively implement the relevant construction quality inspection and acceptance, including the quality inspection of concealed works, inspection lots or subdivisional work, etc. V. Completion of supervision schedule control:
5. 1. According to the owner's schedule control requirements and arrangements, as well as the construction organization design and overall schedule submitted by the general contractor, our project department has formulated a targeted schedule control plan.
5.2. In order to meet the requirements of the owner for the progress node, the supervision team adopts the monthly report system for the progress of the project site, so that the owner can grasp the latest progress, reasons and suggestions on the site and take timely measures to ensure the smooth completion of the progress node. At the same time, the construction unit is required to make a monthly progress plan according to the actual progress and the actual situation on site, and revise the total progress plan; The construction unit is required to report the weekly plan every week and modify the weekly plan in time to meet the requirements of the general schedule.
Six, safety supervision work review:
6. 1 Do safety supervision before construction and strengthen safety control before construction.
6. 1. 1. Formulate supervision rules such as safe and civilized construction, provide operating basis for on-site safety supervision, set safety management objectives, clarify the division of labor of supervisors, and the representative of the director personally pays attention to safety, and all staff take care of safety, so as to find potential safety hazards as much as possible and eliminate potential safety hazards in the bud;
6. 1.2. For the safety of special disciplines/divisions, special safety rules should be formulated. For projects with complex technology, strong professionalism and high safety construction risks, To this end, according to the relevant requirements of mandatory standards, we have formulated detailed rules for supervision and implementation;
6. 1.3. Check and accept all kinds of construction machinery, equipment and facilities 18 sets, and special operators 3 1 person.
6. 1.4. Review the five safety technical measures in the construction organization design and special construction scheme, put forward supplementary and perfect supervision suggestions, and implement them after approval;
6.2. Do a good job in site safety supervision during construction and strengthen safety control during construction.
6.2. 1. Strengthen the safety inspection on the construction site, and check the safety and civilization at least once a week. Every day, people patrol the safety civilization, notify the construction unit in time when finding potential safety hazards, and urge the rectification and implementation;
6.2.2. Nine supervision safety rectification notices were issued in time in view of the major safety hazards found on site.
Seven. Summary of investment control and supervision;
7. 1 Do a good job in the measurement of on-site quantities, carefully review the quantities of engineering changes (mainly measured quantities, combined with calculation), and cooperate with the owner and the construction unit to do a good job in the measurement of quantities.
7.2 Timely and strictly review the monthly progress payment settlement report of the construction unit.
7.3 Strictly review the progress payment of the general contractor in time to ensure that the construction unit will not be delayed by the progress payment.
Eight, the main problem:
8. 1 The site supervisor thinks too much about the progress of the project and fails to control the quality problems and potential safety hazards. Therefore, in the process of construction, quality and safety monitoring is sometimes passive;
8.2. Some construction subcontractors' own quality assurance systems can't play a good role, which makes it difficult to effectively implement on-site construction quality control procedures. Many times, the site supervisor has almost become the quality inspector of the construction unit. Even so, the rectification of some quality problems can not be implemented in time and effectively. Among them, the civil engineering problems are particularly prominent, mainly manifested in the relatively weak general contracting management power of Henan First Construction Engineering Group Co., Ltd., and the professional ability and sense of responsibility of the construction team have certain problems, which bring great difficulties to the on-site project management and supervision;
8.3. The supply quality of materials on the construction site fluctuates greatly, which has a certain impact on the smooth realization of the project construction objectives;
8.4. The construction data of some construction units cannot be synchronized in time, and even some important construction technical data and safety data are not only seriously lagging behind, but have not been effectively implemented so far;
8.5 Some construction units have poor safety awareness, and it is difficult to effectively implement on-site safety control procedures. Some safety problems can not be rectified in time and effectively, and it is easy to produce repeated phenomena. This has much to do with the weak safety management strength of Henan No.1 Construction Engineering Group Co., Ltd. and the overall management system of Henan No.1 Construction Engineering Group Co., Ltd., but the on-site supervision team, together with the owner and the government monitoring subject, effectively reversed the trend of safety civilization out of control in the initial stage of the subject through unremitting efforts.
Nine, Guizhou Bijie Qixingguan District 20XX rural boarding project
The next work plan of the steering group:
9. 1 quality
9. 1. 1 Strictly control the quality of decoration engineering, focus on the quality of decoration engineering, strictly control the quality of materials, strictly control the incoming inspection, timely inspect, and timely exit unqualified materials;
9. 1.2. The supervision of water, electricity, fire fighting and other equipment strictly controls the quality of materials submitted by the construction unit and reviews the quality certification materials;
9. 1.3. Water, electricity, fire protection and other majors should do a good job in linkage debugging and supervision of fire protection and other equipment;
9. 1.4. Improve the acceptance of partial projects, comprehensively collect and sort out engineering data, and create conditions for project completion acceptance.
9.2 Safety aspects
9.2. 1. In terms of safety, we continue to ask the construction unit to carry out the construction responsibility, and at the same time mainly carry out the safety responsibility, firmly establish the idea of safety first, and the alarm bell will ring.
The key points of safety supervision in the next step are: ① dismantling the external scaffolding; ② monitoring the normal operation and complete dismantling of large mechanical equipment in the later stage; ③ sorting out the safety supervision data.
9.2.2 The supervision engineer shall conduct daily safety supervision and inspection, and conduct on-site supervision on external scaffold removal and tower crane removal;
9.3 progress
9.3. 1 urge the construction unit to report the overall progress plan of the unfinished project, coordinate the cooperation of various professional types of work, coordinate the cooperation between the owner and the construction unit, and promote the completion of the project as soon as possible;
9.3.2 Continue to adhere to and effectively implement the daily report system of completed projects, timely check and confirm the actual completion of related projects, and make statistical reports;
9.3.3 Control in strict accordance with the contract time limit and the progress nodes formulated by the owner, and actively coordinate the construction unit to adjust the progress plan according to the actual situation on site every month to ensure that the project progress is always under control;
9.4.Investment
According to the requirements of the contract, do a good job of on-site measurement, review and issue the progress payment in time.
?
Part IV: Section III Summary of Civil Supervision Work
There is a 1 1 single project with a total construction area of 63,227 square meters, which is supervised by Shangxun Construction Engineering Consulting Co., Ltd., concerning sheet metal, numerical control, heat treatment, 1# shift building, 2# shift building, 13 restaurant, 08 restaurant, sewage treatment station and nondestructive physical and chemical treatment.
A, the project schedule
Sheet metal numerical control: sheet metal equipment is poured on the floor; Compilation of numerical control completion data of sheet metal. Heat treatment plant: completion data is being compiled; The basement leakage repair, weak current and indoor decoration finishing work continued.
2# shift building and 13 restaurant: the finishing work is being carried out now, and the key of 13 restaurant has been delivered to the owner for use.
1# Shift Building, 08 Dining Room: At present, construction is under way, with weak electricity and interior decoration; 1# The outer frame of the shift building has been removed.
Non-destructive testing, physical and chemical center: physical and chemical main structure acceptance is completed, the first floor interior wall painting is completed, the second floor wall painting is completed 70%, the curtain wall main keel is installed 50%, the weak current bridge and ventilation duct are installed, and the first floor ceiling is completed 50%. The construction of hydrophobic pearl plate and fine stone concrete on the undamaged roof is completed, and the internal water, electricity, warmth and ventilation are available. Mesa treatment: the first-floor structure in Area A is completed, the second-floor structure in Area C is completed, and the reinforcement and formwork of the second-floor structure in Area B are completed by 90%; The floor foundations in areas D and E have been completed.
Second, the collection situation
About 1.4 million yuan has been recovered as planned this quarter.
Third, the supervision work in the next quarter
Sheet metal numerical control: cooperate with the owner to prepare the completion data and complete the completion acceptance.
Heat treatment plant: unfinished project, basement leakage, accessory decoration, weak current finishing project; Cooperate with the owner for completion acceptance.
2# shift building and 13 restaurant: the supervisor organizes the pre-acceptance, informs the construction unit to rectify the existing problems, and cooperates with the owner for the completion acceptance.
1# shift building, 08 canteen: monitor the unfinished project,/kloc-0 organize pre-acceptance before the end of 0/0, notify the construction unit to rectify the existing problems, and cooperate with the owner in the completion acceptance.
Non-destructive testing and physical and chemical center: continue to carry out monitoring of interior decoration, curtain wall, decoration, roof waterproofing and thermal insulation.
Table treatment: supervise and monitor the quality, progress and safety of annex building, main workshop floor, annex building structure, roof construction and basement equipment foundation.
;