Current location - Recipe Complete Network - Catering franchise - Carry out a summary report on the construction of beautiful countryside.
Carry out a summary report on the construction of beautiful countryside.
Carry out a summary report on the construction of beautiful countryside.

Time flies and a piece of work is over. What achievements are worth sharing in retrospect? Should I write a work summary record? How to write a work summary to give full play to its role? The following is a summary report on beautiful countryside's construction work compiled by me for your reference, hoping to help friends in need.

Summary Report on the Construction of beautiful countryside 1 Since the beginning of this year, the whole city has been guided by the spirit of the 18th CPC National Congress, guided by the concept of reform and innovation, and focused on the goal of "two cities and four places" to further promote the construction of beautiful countryside. The level of village renovation and construction has been continuously improved, the rural environment has become more beautiful, farmers' lives have become richer and better, and rural society has become better.

Pay attention to mobilizing positive factors and constantly improve the security system.

In the process of beautiful countryside construction, Fenghua City actively mobilized all favorable factors and strived to create a benign construction environment. To sum up, there are the following aspects:

1, to further consolidate the good atmosphere of village renovation and construction.

The first is to strengthen organizational leadership. A series of leading groups, such as beautiful countryside Construction and Central Village Cultivation, have been set up, and the responsibilities of each member unit have been clarified. The leaders in charge of the city often listen to reports from the agricultural office and township streets on the three villages and one line, the two reforms of rural houses, the linkage of land increase and decrease, and the renovation of villages in underdeveloped areas, and lead relevant departments to the front line of rural research for many times to discuss and study practical problems on the spot. During the budget arrangement at the beginning of the year, the Deputy Secretary of the Municipal Party Committee also specially convened the Agricultural Office and the Finance Bureau to coordinate and discuss how to support the new construction project funds in time on the basis of ensuring the full amount of agricultural funds. Towns (streets) have established the leadership mechanism and working mechanism of unified leadership by Party committees, with the main party and government leaders taking overall responsibility, leaders in charge personally grasping, the new rural construction office taking the lead, and each line being responsible for division of labor.

The second is to strengthen policy support. In recent years, various departments have formulated many preferential policies related to agriculture. This year, our city collected and sorted out 42 agricultural-related documents from 17, covering the construction of village-level organizations, the development of collective economy, the renovation of rural houses, the construction of rural culture, civil assistance and the construction of beautiful countryside. The summary information was compiled into the policy compilation and distributed to the town (street) and village levels through the city's new rural construction work conference, which greatly improved the awareness rate and utilization rate of relevant policies.

The third is to strengthen coordination. In the promotion of the "Three Villages and One Line" project, all departments at all levels in the city carry out their duties and actively cooperate with each other, and towns (streets) and villages implement their responsibilities and make overall plans. Summarize and implement effective methods suitable for rural reality, such as "rural economic consultant", "village-enterprise pairing" and "one thing, one discussion", and basically form a working pattern of joint efforts of towns and villages and all sectors of society to promote the construction of beautiful countryside.

2. Maintain the fervent enthusiasm of creating advanced counties in the whole province and holding city on-the-spot meetings last year.

In 20xx, under the care and guidance of the higher authorities, Fenghua Agricultural Office led the relevant units to prepare carefully and cooperate closely, and successfully completed two key tasks: the establishment of advanced county in beautiful countryside, Zhejiang Province and the on-site meeting on the renovation and construction of happy and beautiful new homes and new countryside in underdeveloped areas in Ningbo. The awareness and praise of Fenghua beautiful countryside construction have been comprehensively improved, and very important practical experience has been gained in the aspects of departmental coordination, publicity, resource integration, site inspection and promotion along the route, creating a fiery atmosphere for all levels and departments to care for and support rural work. Since the beginning of this year, towns (streets) and administrative villages have applied for building villages, and all agriculture-related units have actively docked with the Municipal Agricultural Office to implement projects to support the construction of villages.

3. Take the "synchronization of the four modernizations" as an opportunity to promote the pilot reform of beautiful towns and villages.

In recent years, Fenghua City has continuously increased its efforts to coordinate urban and rural development, vigorously implemented the "three major constructions" of a strong city, a city with strong quality and a city with strong culture, and laid a solid foundation for rural reform. Xiaowangmiao street has obvious location advantages, and the rural collective construction land consolidation has great potential. As a pilot project in Fenghua City, the linkage between land increase and decrease has achieved certain results. Last year, it signed a framework agreement with Greentown Group to build a beautiful town and village demonstration zone, giving Wang Xiaosi the authority to try first. This year, it was determined by Ningbo as a beautiful town and village reform pilot zone with "four modernizations in synchronization". At present, the overall plan for promoting the reform of beautiful villages and towns in the demonstration area has been formulated, and the conceptual master plan of Xiaowangmiao Street and the agricultural planning of Xiaowangmiao have been compiled by Tongji University and the Provincial Academy of Agricultural Sciences respectively, and the street has comprehensively carried out the household survey and registration of farmers' homestead area and replacement willingness.

Effectively implement the project carrier and fully promote village construction.

This year, the city started construction of 1 boutique lines, 2 advanced towns (streets), 3 central villages, 6 well-off villages and 7 characteristic villages, and 30 new villages started to carry out surface domestic sewage treatment.

1. Start the beautiful countryside boutique line 1. Based on the favorable conditions for beautiful countryside to build an advanced town in 20 13, this year, our city chose to report to Shangtian Town to carry out the cultivation and construction of fine lines. * * * It involves 8 villages including Huixi, Tiaozhai, Guangdu, Chaijiaao, Yang Jiayan, Jiulong, Fangjiaao and Yinjiakeng. Relying on ecological conditions such as Phyllostachys pubescens and Chashan, we will actively explore Bulong culture and cultivate the personality characteristics of fine lines. At the same time, we will step up efforts to promote important node villages such as Jin 'e, Jiangjia Chitou and Tongjiao Temple, improve the environment along the line, and make good preparations for the acceptance of the Hua Mu Corridor Boutique Line launched last year.

2, start the beautiful countryside advanced town (street) to create 2. According to the index arrangement of Ningbo Agricultural Office and the actual situation of our city, Xikou Town and Xiaowangmiao Street were selected to create advanced towns (streets) in beautiful countryside this year.

3. Start to cultivate three central villages. According to the construction arrangement of each village in recent years, combined with relevant towns (streets), the Municipal Agricultural Office has identified three villages in Dayan Town: Ji Yun Village, Houzhu Village and Baikeng Village for cultivation and construction. Cultivation and construction villages have successively formulated construction plans and specific plans to promote construction in an orderly manner. At the same time, we will do a good job in the preparation for the inspection and acceptance of the two central villages, Louyan Village in Shangtian Town and Matou Village in Qiucun Town, which began in 20 12.

4. Start to cultivate seven characteristic villages. They are Yantou Village in Xikou Town, Sanshiwan Village, Quchi Village in Chun Hu Town, Guangdu Village in Shangtian Town, Dayan Village in Dayan Town, Xifan Village in Xiwu Street and Jiangjia Chitou Village. According to the relevant requirements, each cultivation and construction village has formulated a two-year project implementation plan and implemented it steadily as planned. At the same time, we are actively preparing for the inspection and acceptance of five characteristic villages, namely Mingxi Village in Xikou Town, Lengxi Village in Shangtian Town, Lichetou Village in Dayan Town, Huangxian Village in Qiucun Town and Jin 'e Village in Xiwu Street, starting from 20 12.

5. Start all-round well-off villages and create six. In 20 13, on the basis of extensive screening and comparison, the Municipal Agricultural Office decided to establish six villages, namely Mingxi Village in Xikou Town, Zhujianong Village in Chun Hu Town, Yanming Village in Shangtian Town, Chengxiao Village in Jinping Street, Houjiang Village in Jiangkou Street and Miaohouzhou Village in Xiwu Street. In order to overcome the influence of possible factors such as one-vote veto and ensure the completion of the creation task, the Municipal Agricultural Office has prepared 1 backup creation villages. At present, the villages have completed the established construction projects and submitted the application materials, waiting for the final evaluation and acceptance.

6. Rural domestic sewage treatment. World Bank Project: Do a good job in the operation and maintenance and equipment debugging supervision of the second batch of six administrative villages; Start the third batch of 1 1 administrative village projects in an all-round way, and strengthen project quality supervision; Complete the design of the fourth batch of 10 administrative villages, and complete the project supervision and construction bidding; Complete the fifth batch of village selection and start the design. General project: the project acceptance of five administrative villages was completed on 20 12. This year, village selection and detailed rules for implementation will be completed, design units will be determined, preliminary design will be completed, village disclosure and scheme improvement will be carried out, and design review and construction drawing design will be completed. Complete the bidding for the finalist of the construction unit and the bidding for centralized procurement of pipelines. Complete the village project bidding. Determine the supervision unit. All construction units enter the site for construction.

In addition, we also actively cooperated with the higher authorities to complete a series of other work, such as the investigation of five types of villages, the declaration of key villages and ordinary villages protected by famous historical and cultural villages, the declaration of the "beautiful countryside Establishment Pilot" by the Ministry of Agriculture, the selection of the most beautiful villages in Zhejiang, the selection of the three "Top Ten" villages for Ningbo's ten-year renovation and construction, and the investigation of rural domestic sewage treatment.

Fully respect the objective reality and treat difficulties scientifically.

1. The pressure of rural construction is increasing year by year.

For example, after ten years of implementation, the city has created 6 1, which has made great contributions to the change of rural appearance in our city. On the other hand, villages with better conditions are created in batches, and the basic conditions of other villages are difficult to keep up in the short term, making it more difficult to create them year by year.

2. There are obstacles in rural domestic sewage treatment.

It is mainly manifested in three aspects: First, towns and villages do not know enough about sewage projects and pay insufficient attention to them, and the initiative and enthusiasm of project implementation are not high, which makes it difficult to promote the work; Second, the project implementation time is tight, and it is very difficult to complete a series of work such as village selection, topographic survey, project establishment, design, bidding, construction and acceptance within one year; Third, the municipal agricultural pollution office lacks technical and management engineers, and the project management ability needs to be further strengthened.

3. The bottleneck of funds still exists.

The cultivation of central village, characteristic village and fine line, the establishment of advanced towns (streets) and the treatment of rural domestic sewage are all systematic projects, involving a wide range and requiring a lot of manpower, material resources and financial resources. Although the city leaders attach great importance to it, constantly increase the inclination of funds, and repeatedly emphasize that the matching funds of relevant departments should keep up closely, but limited by the current situation of rural collective economy in our city, the bottleneck of project construction funds is still an unavoidable problem.

Strictly follow the planning layout and rationally arrange the ideas for next year.

In 20xx, according to various plans, our city will continue to steadily promote the cultivation of central villages and characteristic villages, the establishment of well-off villages in an all-round way, the establishment of fine lines and advanced towns, and promote all aspects of beautiful countryside's construction.

First, continue to do a good job in the cultivation, creation and construction of central villages, characteristic villages, well-off villages in an all-round way, boutique lines and advanced towns. Village surveys and village selection will be carried out in a timely manner, and two central villages and four characteristic villages will be newly cultivated to create more than five well-off villages in an all-round way. At the same time, on the basis of Hua Mu Gallery and Shangtian Town's Wulong Zhuhai Boutique Line, a new 1 Boutique Line was built. On the basis of Shangtian, Xikou and Wangxiao Temple, 1 advanced villages and towns were newly built. Ensure that the selection of villages in the center of "three villages, one line and one town" is scientific and reasonable at the beginning of the work, the project is solidly promoted in the middle of the year, and the acceptance at the end of the year is smooth and successful.

The second is to focus on the pilot reform of beautiful villages and towns in Xiaowangmiao Street. Under the overall guidance of the reform pilot scheme of Meili Town Village Construction Demonstration Zone (Xiaowangmiao Street) in China City, Fenghua City, we will give full play to the controlling layout function of Xiaowangmiao Street Concept Master Plan and Xiaowangmiao Street Agricultural Industry Plan, accelerate the implementation of the linkage of construction land increase and decrease and the construction of farmers' central community, adjust and optimize the industrial structure by relying on centralized land circulation, deepen comprehensive supporting reforms, and push forward the reform pilot work steadily in breadth and depth.

Third, continue to promote rural domestic sewage treatment and other work. Do a good job in bidding for operation and maintenance management of sewage facilities, and supervise the quality of operation and maintenance management. Complete the acceptance of the third batch of World Bank village projects, complete the fourth batch of World Bank village projects and start the fifth batch of village projects. We will implement the 20xx surface sewage treatment project in batches, and strive to complete the construction of rural domestic sewage treatment projects in 70 villages throughout the year.

Summary Report on beautiful countryside Construction Work 2 According to the work deployment of the county party committee and government, xx Town has solidly promoted the construction of a happy beautiful countryside. At present, xx and xx villages involved in the boutique route have been basically completed, and the construction of xx, xx, xx and other villages is under way. The relevant information is hereby notified as follows:

I. Work that has been completed

Through holding a forum for villagers' representatives, solicit opinions from villagers extensively, quantify and refine the work in each village, set work objectives, and clarify the completion time limit and responsible person.

1, village logo. All village cards have been installed, and the village cards are concise and eye-catching and save money.

2. Road hardening. Complete the hardening of the shoulder of xx village, with the hardened area of 1 1,000m2.

3. Village Cultural Square. Villagers' squares in xx, xx and xx villages have been built.

4. Garden construction. Xx Village invested and built a garden covering an area of 2,000 square meters in the north of the village; Xx Village has built a park covering an area of 20,000 square meters in the northeast corner. At present, two small parks have been built and put into use.

Two. Work in progress

1, road hardening. Xx village road construction fund budget, engineering quantity, etc. It has all been completed, and the village construction has been planned in a unified way. At present, the village road is being hardened, with a total length of 1200m, which will be completed by the end of August.

2. Village Cultural Square. Xx village is currently actively negotiating the site selection, and the site selection of xx village has been determined, and the land procedures are being actively carried out.

Third, the next work plan

In the process of building a happy beautiful countryside, some achievements have been made, but there are also some problems. Due to insufficient funds, some rectification objectives and tasks have not been completed, such as road hardening and village cultural square construction, which need to be further implemented.

1, road hardening: xx village plans to build 500 meters of cement road with shoulder1200m2; Xx village plans to build 300 meters of cement road, hardening xx4800 square meters; Xx village plans to build cement road1000 m; Xx village plans to build 1500m cement road. At present, we are actively striving for project funds and making full use of policy funds such as "every village" and "one thing, one discussion".

2. Street shaping and garbage disposal: xx village plans to paint the wall for 5000 meters and build five garbage pools.

3. Street lamps: xx village plans to install street lamps 103; Xx village plans to install 25 street lamps; Xx village plans to install 80 street lamps.

In the next work, we will further intensify our efforts, carefully plan, adjust measures to local conditions, and raise funds in various ways to comprehensively promote the construction of a happy beautiful countryside and create a "harmonious xx in beautiful countryside".

Summary Report on beautiful countryside Construction 3 I. Overview

The Xiajian Group in XX Village is a natural village in XX Township. There are more than 70 households with a population of more than 350. Over the years, due to the poor planning of Xiajian Formation, cowsheds, toilets and adobe houses have been built everywhere, and there are many broken walls, earth fences and dangerous houses, with garbage everywhere and sewage flowing across. The people's desire to build a new countryside is very urgent, and they have repeatedly reflected the situation in rural areas and demanded that Xiajian Group be listed as a new rural construction point.

Second, the main work carried out

(A), leadership attention, measures in place

According to the wishes of the masses and the actual situation of the next construction group, the XX township party committee and government did report this group as a new rural construction point. After Xiajian Formation was listed as a construction village in beautiful countryside, environmental improvement and demolition of old houses became the primary tasks. Because the new rural construction has not been implemented for many years, the masses are quite complaining. Moreover, most of the old houses to be demolished are cowsheds and toilets, and some people have resistance. Based on this, XX Township organized a task force composed of township, village and group staff to conduct publicity and explanation work before the new rural construction in every household, and mobilized them to take the initiative to demolish old houses and support the new rural construction.

In the process of work, the main leaders of the township often go to the village to give guidance, and have repeatedly called the leaders of rural villages to meet and study. Ask the lower group to do the work according to the actual situation: for the farmers who raise cattle at home, it is suggested that the village group build a new cowshed downstream of the village group; For useless adobe houses and broken walls, do work to persuade them to be demolished; For the earth fence that affects safety, it is suggested to use old materials for reconstruction and beautification when starting construction. At the same time, the task force also suggested that the village group disclose the procedures, requirements and standards of new rural construction for the convenience of the masses.

(2), propaganda and mobilization, pay close attention to implementation.

In order to really let people know about the procedures and work of beautiful countryside's construction, the rural working group organized several meetings of all the people in the next group to discuss the construction of new countryside and answer their doubts. Members of the Committee are elected by the masses. After the establishment of the Council, we will vigorously carry out propaganda work on beautiful countryside's construction. Post a notice to farmers at the entrance of the village and publicly erect the wall of new rural construction. At the same time, the bureau also signed an old house demolition guarantee with every household to ensure the smooth demolition of old houses.

(C) according to local conditions, building a new countryside

To build a new countryside, dangerous houses that affect safety and beauty must be demolished first. Therefore, party member, a member of the New Rural Council of Xiajian Group, took the lead in demolishing the old houses he had identified, which led the masses to demolish them. Driven by them, nearly 80 dangerous houses and cowsheds in the whole group have all been demolished, with a demolition area of nearly 6,000 square meters. In the process of demolition, because the work was in place, there was no dispute caused by demolition. At the same time, at the foot of the mountain far away from the village group, the masses were organized to build 12 cowpeas, which separated people from animals and ensured environmental sanitation. In addition, a cleaner was specially hired to be responsible for the sanitation and cleaning of the whole group.

After the work since the first half of this year, more than 600 meters of ditches 1 100 have been built in Xiajian new countryside, and more than 600 meters of main roads and sidewalks have been built. After the demolition, the wall has been built nearly 600 meters. The improvement of water and toilets has been fully completed. The villagers raised nearly 6.5438+0.5 million yuan to rebuild the cultural center covering an area of nearly 600 square meters. The building renovation has been completed and the interior and exterior decoration is currently under way. In addition, two sites of nearly 700 square meters were leveled for the construction of leisure places and public parking lots.

In order to successfully complete the construction task, on the basis of the original construction investment of 300,000 yuan in beautiful countryside, the township party committee and the government coordinated to increase 300,000 yuan for this batch of new rural construction by striving for funds. At present, the project has invested more than 600,000 yuan.

Third, the next step

1, continue to complete the greening and lighting of new rural construction projects, and fully complete the construction of cultural centers;

2, do a good job in the planning and construction of leisure places, and spray paint to make publicity columns, and do a good job in the construction of leisure trails;

3. Raise funds in various ways, and strive to fill the funding gap for new rural construction by competing for projects, striving for subsidies from affiliated institutions, social assistance, and self-financing by the masses.

;