Minutes of household acceptance meeting
Minutes of Household Acceptance Meeting 3

Minutes of Household Acceptance Meeting 1 Meeting Time: xx Year 65438+ 10: 30 on the morning of October 20th.

Meeting place: Office of Project Department of xx Building

Participating unit: xx Construction Engineering Quality and Safety Supervision Station

Xxxx International Investment Promotion Co., Ltd.

Xx guoshe engineering consulting supervisory co., ltd

China xx Group Co., Ltd.

Participants: See the sign-in form for details.

Main contents of the meeting:

According to the Interim Provisions on the Administration of Household Acceptance of Residential Engineering Quality of xx City Construction Management Bureau (Xiamen Construction Engineering [XX] No.24) and Xiamen Construction Quality and Safety Supervision [XX] No.85, and according to the relevant national engineering quality acceptance standards, 63 households in XX Building were inspected and accepted for visual quality and use function, mainly checking the following contents:

(1) Quality of floors, walls and ceilings.

(2) Quality of doors and windows.

(3) The quality of railings and guardrails.

(4) waterproof engineering quality.

(five) the main indoor space size.

(6) Installation quality of water supply and drainage system.

(seven) indoor electrical engineering installation quality.

(eight) the quality of building energy-saving projects.

(9) Other contents agreed in relevant contracts.

After inspection, the overall situation of household acceptance:

1, there is no delamination, hollowing and cracking on the wall and ceiling.

2, bathroom, bathtub, balcony surface slope conform to the requirements of the specification.

3, the roof waterproof without leakage.

4, the kitchen and bathroom waterproof meets the requirements.

5. There is no leakage on the external wall.

6, outside the window sill, guardrail, railing spacing meets the requirements.

7, doors and windows without leakage, doors and windows open and close freely. Door and window glass safety certification marks are complete.

8, indoor water supply and drainage pipeline without leakage, slope, floor drain water seal inspection meets the requirements.

9. Electrical installation, sockets, switches, grounding, power distribution and lighting tests meet the requirements.

10, equipotential fastening and testing meet the requirements.

1 1, building energy efficiency has special acceptance.

12, the oil fume exhaust pipe and air conditioning hole are inspected to meet the requirements.

Family acceptance function test:

1, there is no leakage in roof water storage test, kitchen water storage test and external wall water spraying test.

2. The guardrail height and railing spacing outside the window sill meet the specification requirements.

3. Doors and windows can be opened and closed freely.

4, indoor water supply and drainage test water without congestion.

5. Indoor electrical switches, sockets and lighting tests meet the requirements.

6. Equipotential fastening and conduction are normal.

7. The fume exhaust pipe is not ventilated and there is no crosswind.

8, air conditioning hole without leakage, slope and position is correct.

According to the household acceptance standard of residential engineering quality in Fujian Province and related standards, the evaluation is as follows:

The construction quality of xx building meets the requirements of household acceptance, and the visual quality and use function of the project are qualified. Among them, 60 households passed the first acceptance, 3 households passed the rectification, and the one-time pass rate of household acceptance was 95%. After the first rectification, all reinspection were qualified.

Conform to the household acceptance standard of residential engineering quality, and pass the inspection of visual quality and use function.

Agree to accept.

For details, see Summary of Household Acceptance Records of Residential Projects.

China xx Group Co., Ltd.

Xx year 65438+1October 20th.

2 * * * * Project Household Acceptance Meeting Minutes

Minutes of household acceptance meeting

No.: * * *-* *-* *-* * *

Time: 20xx-**-**.

Venue: Meeting Room of Sales Department

Moderator: Yang * *

Participants: See the meeting sign-in form for details.

Content:

On the problem that the project supervision organization organizes the construction unit and the construction unit to coordinate the household acceptance one by one before the household acceptance in Nanning;

A, the construction unit said and opinions:

1. Our civil works will be carried out one by one according to the acceptance regulations of residential projects in Nanning, so that the acceptance can proceed smoothly.

2. All relevant units actively cooperate with our company, and our company will also actively cooperate with relevant units.

Second, the project supervision agency requirements:

1, quality management:

(1) The main acceptance contents of floors, walls and ceilings include ground cracks, hollowing and environmental protection performance of materials.

(2) The main acceptance contents of doors, windows and railings include window sill height, water seepage, door and window opening and closing, glass installation, railing height, spacing, firm installation and anti-climbing measures.

(3) The main acceptance contents of waterproof project include roof leakage, kitchen and bathroom leakage, balcony ground leakage and external wall leakage.

(4) The main indoor space dimensions mainly include the clearance dimension of the bay and the indoor clear height dimension.

⑤ The main acceptance contents of water supply and drainage engineering and electrical engineering include pipeline leakage, pipeline slope, installation and fixation, floor drain and water seal, water supply nozzle position, grounding, phase, control box configuration and switch socket position.

3. Data management:

(1) The information of aluminum alloy doors and windows, waterproof works and balcony railings is not perfect.

(2) Special building materials such as flue, fire door, steel structure and fire door shall be supervised and improved by the construction unit.

The information of the relevant units must be improved, and the house-to-house inspection shall be carried out.

Three, the requirements of the construction unit and related issues:

(1) Require relevant units to deal with quality and data issues raised by project supervision institutions.

(3) Relevant units cooperate with each other in data archiving of civil engineering units.

Four. Meeting summary:

(1) All relevant units shall actively cooperate with the general contractor to make house-to-house acceptance. * * * With the completion of the final stage of the project.

Guangdong * * * * * Co., Ltd.

* * * * Project Supervision Department

20xx * * month * * day

Minutes of Household Acceptance Meeting 3 Meeting Time: 65438+ 10: 30 on the morning of October 20th.

Meeting place: Office of Project Department of * * Building

Participating units: * * City Construction Engineering Quality and Safety Supervision Station

* * * * International Merchants Co., Ltd.

* * National Engineering Consulting Supervision Co., Ltd.

China * * Group Co., Ltd.

Participants: See the sign-in form for details.

Main contents of the meeting:

According to * * City Construction Management Bureau's Interim Provisions on Household Acceptance Management of Residential Engineering Quality (Xiamen Construction Engineering [XX] No.24) and Xiamen Construction Quality and Safety SupervisionNo. [XX] No.85, according to the relevant national engineering quality acceptance standards, 63 households in * * Building and related public * * parts were inspected and accepted, mainly checking the following contents:

(1) Quality of floors, walls and ceilings.

(2) Quality of doors and windows.

(3) The quality of railings and guardrails.

(4) waterproof engineering quality.

(five) the main indoor space size.

(6) Installation quality of water supply and drainage system.

(seven) indoor electrical engineering installation quality.

(eight) the quality of building energy-saving projects.

(9) Other contents agreed in relevant contracts.

After inspection, the overall situation of household acceptance:

1, there is no delamination, hollowing and cracking on the wall and ceiling.

2, toilet, balcony surface slope conform to the requirements of the specification.

3, the roof waterproof without leakage.

4, the kitchen and bathroom waterproof meets the requirements.

5. There is no leakage on the external wall.

6, outside the window sill, guardrail, railing spacing meets the requirements.

7, doors and windows without leakage, doors and windows open and close freely. Door and window glass safety certification marks are complete.

8, indoor water supply and drainage pipeline without leakage, slope, floor drain water seal inspection meets the requirements.

9. Electrical installation, sockets, switches, grounding, power distribution and lighting tests meet the requirements.

10, equipotential fastening and testing meet the requirements.

1 1, building energy efficiency has special acceptance.

12, the oil fume exhaust pipe and air conditioning hole are inspected to meet the requirements.

Family acceptance function test:

1, there is no leakage in roof water storage test, kitchen water storage test and external wall water spraying test.

2. The guardrail height and railing spacing outside the window sill meet the specification requirements.

3. Doors and windows can be opened and closed freely.

4, indoor water supply and drainage test water without congestion.

5. Indoor electrical switches, sockets and lighting tests meet the requirements.

6. Equipotential fastening and conduction are normal.

7. The fume exhaust pipe is not ventilated and there is no crosswind.

8, air conditioning hole without leakage, slope and position is correct.

According to the household acceptance standard of residential engineering quality in Fujian Province and related codes and standards, after evaluation:

* * The construction quality of the building project meets the requirements of household acceptance, and the visual quality and use function of the project are qualified. Among them, 60 households passed the first acceptance, 3 households passed the rectification, and the one-time pass rate of household acceptance was 95%. After the first rectification, all reinspection were qualified.

Conform to the household acceptance standard of residential engineering quality, and pass the inspection of visual quality and use function.

Agree to accept.

For details, see Summary of Household Acceptance Records of Residential Projects.

China * * Group Co., Ltd.

XX year 65438+1October 20th.

;