In order to further standardize the charging behavior of construction drawing design documents (including survey documents, hereinafter referred to as construction drawings) in our province, safeguard the legitimate rights and interests of both construction units and construction drawing review institutions, improve the service quality of construction drawing review, and promote the healthy development of the construction market. According to the Regulations on Quality Management of Construction Projects (Order No.279 of the State Council) and the Notice of the National Development and Reform Commission on Reducing the Charges for Some Construction Projects (Development and Reform Price [2011] No.534), combined with the Notice of Fujian Provincial Price Bureau on Re-standardizing the Charges for Construction Drawings and Design Documents (Minjiafang [2009],
A, where in our province has obtained the qualification certificate issued by the administrative department of housing and urban and rural construction at or above the provincial level and has the qualification of a legal person, the construction drawing review institution shall accept the entrustment of the construction unit and review the contents of the construction drawing involving public interests, public safety and mandatory standards for engineering construction in accordance with the provisions of relevant laws and regulations before charging according to the charging standards stipulated in this notice.
Two, the construction plan review fee belongs to the operating service charges, the implementation of government guidance price management. The principle of voluntary payment and who entrusts who pays the construction drawing review fee shall be implemented, and the construction unit shall independently choose a construction drawing review institution with corresponding qualifications. The construction drawing review fee paid by the construction drawing review client of the construction project can be included in the preliminary cost of the project.
Three, residential construction drawing review fee to the construction unit of one-time construction area as the base, according to the provisions of the standard progressive income; Other housing construction projects (including public buildings and industrial buildings), sub-projects (curtain wall, decoration, light steel, intelligence, geotechnical, pile foundation, civil air defense projects, etc.). ) and the municipal engineering construction drawing review fee are based on the estimated amount of the project submitted by the construction unit at one time, and are charged progressively according to the difference rate. Please refer to the attachment for details. Among them, if the construction drawing review (excluding survey documents) for single project calculation is insufficient 1500 yuan, it shall be calculated as 1500 yuan; If the amount of the survey document review fee calculated for a single project is less than 1 ,000 yuan, it shall be calculated as 1 ,000 yuan.
This charging standard is limited to the construction drawing review service of housing construction (civil construction and general industrial construction) and municipal engineering, and the construction drawing review of railway, transportation, water conservancy, electric power and other professional projects does not refer to the implementation.
Four, the national and provincial key construction projects construction drawing review fee according to the provisions of this notice charged 60%; Social security housing (including affordable housing, low-rent housing, demolition and resettlement housing, price-limited commodity housing projects, etc. Enjoy the preferential policies of the government, according to the provisions of this notice, 70% of the charges.
Five, problems found in the process of construction drawing review, local design rectification, resubmit without additional charges; For other objective reasons, the construction drawings that need to be designed and rectified account for more than 60% of the total construction drawings, and 50% of the fees specified in this notice may be charged separately.
Six, the construction unit or survey and design units have significant differences on the review results of the review body, can request the construction administrative department at the next higher level for review, the review results are consistent with the original review results, and the review fee is paid by the construction unit or survey and design unit; If the reexamination result is inconsistent with the original reexamination result, the reexamination fee shall be paid by the original reexamination institution. The examination fee shall be charged at 50% of the fees stipulated in this notice.
For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd