Hello, everyone, this is my first article after the Spring Festival, and it is also an article full of dry goods. First of all, thank you for your continuous support! ?
Many friends told me before that I was at a loss when I wanted to decorate, and I didn't know how to plan my own decoration sequence at all, and I didn't know when to buy what I needed for decoration, so just after the Spring Festival, everyone had to prepare for decoration, so I came out with an article full of dry goods. As far as possible, there are no nonsense and useless pictures in the full text, all of which are tables and easy-to-understand words. The most useful purchase orders are summarized in a large table.
This article has a lot of dry goods and is particularly practical. If the time is tight or it is recommended to collect it first, then read it slowly when decorating, haha. . . ?
? Decoration order:
First of all, briefly talk about the decoration order. I simply summarize it as 15. Among them, the more important construction period and production period are only listed for reference because of the different construction conditions in different places, but they will not be too different. After that, the matters needing attention are also listed, so it will not be expanded.
The first is the design of the measuring room. Many people don't pay attention to it and think it's all wet. If you don't plan well in the early stage, what awaits you in the later stage is repeated rework and budget increase. But if it is done well in the early stage, a few key points in the later stage will be enough. ?
Secondly, the demolition of the wall and the laying of water, electricity and heating are also very important, because other parts can be adjusted by local changes in the later stage, but once these two parts are changed, it is basically equivalent to starting over. Among them, wall demolition and construction are two main parts. First, be careful not to move the shear wall or load-bearing wall when dismantling. Second, try to divide the wall into two days, otherwise the cement is not dry and easy to tilt. The water and electricity heating part mainly pays attention to how many square lines are needed, the distance between hot and cold water pipes and the position of switch sockets. As I said in my previous article, you can pay attention to it.
Title: nine pictures to get the whole house circuit and socket! ?
Then there are three major types of work: bricklayer, carpenter and oiler. There are many precautions here, but we only need to grasp three points. The bricklayer's tiles are not empty, the carpenter's quotation should be all inclusive, the painter's paint should be dried thoroughly, and the rest are minor problems. We'll talk about the main material after we buy it ourselves. ?
Then there is the laying of kitchen and bathroom ceiling and floor. Many people here want to ask, why do you want to lay the floor in front of custom furniture and doors? Isn't it necessary to lay a few more square meters of floor? But you have to think about it. Generally, the composite floor we buy is around 150 yuan/flat, that is, the quantity of one 100 flat is only 1500 yuan, so that you can get the perfect edging of the whole customized furniture and the better fit of the interior doors. Do you think it's a good deal? ?
Finally, there is no need to strictly follow the order of the remaining processes. Actually, you can come first if it's convenient. The only thing is to put the touch-up paint in the back. Well, having said that, you should know something about the decoration process. Many people may ask me questions about addition and budget, which is also in my own article.
Topic: How to avoid the common budget of 30 renovations and additions being exceeded?
Topic: Is the budget over? Personal experience tells you how accurate the decoration budget is!
The function of this watch is mainly used to decorate Xiaobai. Knowing the key steps of decoration, the time required is the simplest and most clear. Due to the switching interval of each type of work, the actual construction period is generally three months. It's much more convenient to look at my purchase order list after reading this picture. ?
? Purchase order:
It is said that the most troublesome thing in decoration is the purchase order of various main materials, auxiliary materials, furniture and household appliances. If you buy it early, there is no place to put it. If you buy it late, you can't stay or it's too late. Next, I will give you the picture in seven steps, and finally briefly talk about the reasons for the purchasing order of each part. ?
First, it needs to be confirmed before design.
Before architectural design, there are three main parts to be confirmed: refrigeration part, heating part and ventilation part. To put it bluntly, it is the electrical appliances that need to be designed and installed in advance before hydropower construction. The selection of these components must be careful, because these appliances are embedded appliances, and it is difficult to replace them later if there are problems.
For example, before the design, it is necessary to determine whether to use central air conditioner, hair dryer or ordinary air conditioner at home, because this not only involves the layout of circuits and waterways, but also affects the customization of furniture and the change of layout. There is also the choice of floor heating and the way of fresh air supply, such as floor air supply. These need to be understood and planned in advance. ?
Second, confirm before customizing furniture.
The second stage is the household appliances that need to be determined before designing custom furniture. Here are mainly all kinds of electrical appliances that need to be embedded. These home appliances don't have to be bought in advance, but they must be determined in advance. Otherwise, there may be similar situations that the door cannot be opened, or the space is too large and too small, or even the socket position is reserved incorrectly.
Therefore, you must consider what home appliances you want and related models in the early stage. Don't think that home appliances will be the last consideration! For example, the cupboard door can't be opened due to the incorrect size reservation of the integrated stove, the dishwasher can't be inserted or a big gap is left, or the socket left behind the oven leads to safety hazards.
Third, the hydropower design needs to be confirmed before.
Before hydropower design, it is mainly necessary to confirm that the four categories are customized furniture, ordinary household appliances, pre-installed hardware and lamps, so as to truly fix the layout of hydropower. ?
Among them, custom-made furniture, common appliances and lamps mainly affect the design of circuits, while hardware affects the design of waterways. Especially in the kitchen cabinet, it basically involves nearly half of the hydropower design. All kinds of electrical appliances in the kitchen affect the circuit, and all kinds of clean water and main valves are generally designed in the kitchen.
Remember that water and electricity are the bulk of decoration and the most important part, just like a person's skeleton. If the skeleton is not well laid, it is also a disability to look good. ?
Fourth, the bricklayer needs to confirm before.
Needless to say, tiles and windows need to be confirmed and purchased before bricklayers start work. But many people don't understand why the floor should be confirmed in advance, because the floor needs leveling. This process is generally the responsibility of either the floor or the mason, so it is necessary to set the floor in advance and compare which is more affordable. And the floor has a purchase cycle, usually at least half a month. ?
Note: Leveling can be divided into leveling and leveling. Generally, leveling is enough, that is, the surface is flat, but there may be gaps on both sides. Because of the high leveling cost, the ground needs to be greatly raised. ?
Wu Shuo, oil workers used to need confirmation.
Before oil workers start work, they need to confirm where to paint, where to paste wall cloth and wallpaper, and how to make the background wall. Needless to say, most of these are understandable, but many people don't understand why they want to book an indoor door. Because the size of the interior door can be determined after the bricklayer completes, and the general interior door needs an order cycle of one month to 45 days, it needs to be determined in advance, otherwise it will slow down the whole construction period.
Do I need to confirm before painting?
Before painting, basically everything should be installed except the later furniture, such as all sanitary wares in the bathroom (this is generally the responsibility of the brand selling sanitary wares), all kinds of indoor and outdoor doors (indoor door manufacturers are responsible), switch sockets (electricians can install according to the quantity) and all kinds of lamps (lamps manufacturers or electricians are responsible).
The installation time of these components is relatively short, and many parties are responsible for the installation at the same time, so it is best to concentrate on the installation. Anyway, there is little influence on each other, and you can also watch them on the spot, which can save time.
7. Do I need to confirm before I check in?
Finally, the purchase of finished furniture and the placement of soft clothes, because these parts can be added and replaced slowly according to their own needs after moving in. Don't buy them on impulse, or you will regret using them later. My sofa bed is like this, and it is completely deformed when it is basically not used. However, it should be noted that it is best to confirm the size of the finished furniture in advance, because the size of the finished furniture involves the layout of the space, such as the width reservation of the aisle or the design of the bedside socket and bedside lamp.
? Summary:?
I believe that if you read the whole article carefully, you will have a clear concept of the whole decoration process, and at least know the most important two points, one is what is in the whole decoration process, and the other is what needs to be purchased and determined in each decoration step. There is no decorative picture in the full text, but it is full of dry goods! ?
Finally, if you think the article is useful to you, your collection and attention are my greatest recognition. Thank you! ?
The above content is shared by good users, I hope I can help you ~