Current location - Recipe Complete Network - Catering franchise - 2022 wuhan metro line 12 when opened with site details
2022 wuhan metro line 12 when opened with site details

Wuhan Metro Line 12 Wuchang section of the entire **** set up 14 stations, and is from the Science Park station finally Qingling station, is expected to be completed and open to traffic at the end of 2024; Jiangbei section is scheduled to be opened at the end of 2025 trial operation, there is the latest news about Wuhan Metro Line 12 the following take a look at it.

Wuhan Metro Line 12 when opened

12 line is divided into Wuchang, Jiangbei (Hankou section, Hanyang section) two projects, of which, the Wuchang section has been March 30 this year, the construction of the full start, is expected to be completed by the end of 2024; Jiangbei section is scheduled to be opened at the end of 2025 trial operation.

Wuhan Metro Line 12 (Wuchang section) is about 22 kilometers long, *** set up 14 stations. The line starts at the Science Park Station (not included), traveling along Garden Road, Unity Avenue, Shahu Avenue, Dong'an Road, Ping'an Road, Baishasan Road, and finally Qingling Station (included).

Jiangchu Avenue station is located in Yangsigang ground auxiliary road road (planned for Jiangchu Avenue) and Luo Liang Road, north of the intersection, the station is designed for the underground two-storey island + side station, the station is connected to the entrance and exit line. Previously, the project according to the epidemic prevention and control, the requirements of the resumption of work and production, careful deployment, develop programs, has passed the resumption of work on March 22nd approval, at present, Jiangchu Avenue station has completed the green relocation, pipeline relocation and clearing of the table to hit the perimeter of the construction. 12 (Wuchang section) Fu'an Street station, Garden Road station and other 7 stations have been fully prepared for the resumption of work to start one after another, the later will be the strict implementation of the standardization of the construction and refinement of the management of the construction, the rapid climax of construction work. Rapidly set off the construction of the climax, and strive to minimize the losses caused by the epidemic.

Site details

Changangang Road Station (interchange No. 2 13, predicted underground passage connecting the Hankou Railway Station North Square Hanxiao Intercity Railway)

Changfeng Station (No. 7 13 interchange)

Huaihai Road Station (interchange No. 7)

Shuangdun Station (interchange No. 3 14)

Pacific Ocean Station (interchange No. 1 14)

Hanyang Qintai Avenue Station

Hanyang Avenue Shilipu Station (Interchange 4)

Dingjiazui Station

Harbor Village Station

Sixin Station (Interchange 10)

International Expo Center Station (Interchange 6, 11 and 16)

Lingwucun Station

Qingling Station (Interchange 5)

Nanhu Avenue Station (transfer No. 7)

Ping'an Road Station

Central Garden Station

Wuchang Railway Station (transfer No. 4, 7 and 11)

Fifteenth Middle School Station (transfer No. 13)

Small Turtle Hill Station (transfer No. 2)

Jiajin Road Station

Qinyuan Road Station

Wangjiadun Station (transfer No. 8)<

Unity Avenue Station

Yuanlin Road Station (Interchange No. 4)

Steel City Garden Station (Interchange No. 10)

Keeping Park Station (Interchange No. 5)

Danshui Pond Station (Interchange No. 1)

Baibuting Station (Interchange No. 14)

Xingye Road Station (Interchange No. 3)

Houhu Si Road Station< /p>

For All Fitness Center Station (Interchange 8 21)

Shiqiao Road Station (Interchange 6)

Changangang Road

The latest official news

(1) Wuchang section of Railway Traffic Line 12: 22 kilometers long from the Science Park Station (not included) to Qingling Station, with 14 stations. At present, the main structure of 2 stations has been completed, 12 stations are under construction of the enclosure structure, **** 28 single-line shield interval, including the tea green interval double-line shield has been assembled, to be dug in. Qingling Station, Tea Leaf Station ~ Qingling Station interval air shaft main structure completion and other node targets have been completed.

(2) rail transit line 12 Jiangbei section: from Qingling station (not included) to the science park station, 37.9 kilometers long, with 23 stations. At present, the main structure of 2 stations is completed, 1 station main structure construction, 12 stations are under construction of the enclosure structure, 6 stations are under construction of the pipeline, 2 stations have not started. ***46 single-line shield intervals, of which 2 large shield intervals across the river have shield starting conditions. Nodal targets such as the main structure of Kopu Park Station and the interval shield with starting conditions at Danshuichi Station~Kopu Park Station have been completed.