A, refrigeration equipment system equipment:
CA- 1000, DL/ 125, 4TW-2000 (20p), DD/ 160, TEX,
Electromagnetic valve EVR, refrigerant R22, auxiliary materials (shock absorber, aluminum row hanger, angle steel, etc. )
2. Pipeline engineering system equipment: connecting refrigeration pipeline and auxiliary materials (covered electrode, copper fittings, supports and hangers, etc.). ).
Third, library engineering system equipment: wall insulation, sliding door (1200*2000)
4. Power distribution and lighting system equipment: microcomputer control box, digital temperature controller, lighting lamp (special three-proof lampshade), control circuit and bushing of internal and external machines in cold storage, lighting circuit and bushing.
Huayu Refrigeration wishes everyone a happy Mid-Autumn Festival in advance. The full moon makes everyone happy. The family is happy, happy!