The term "secondary water supply facilities" as mentioned in these Regulations refers to the facilities in front of the user's water meter from the valve position of the water intake point of the urban public water supply pipe network, including pump room, water tank (pool), water pump, valve, electric control device, disinfection equipment, pressure water container, water supply pipeline and other facilities. Article 3 These Regulations shall apply to the secondary water supply and its management activities connected with the city's public water supply network. Fourth city water supply department is responsible for the supervision and management of secondary water supply.
The municipal and district health authorities are responsible for the health supervision and inspection of secondary water supply.
Development and reform, finance, housing construction, public security, planning, quality supervision, price and other relevant departments shall do a good job in the management of secondary water supply according to their respective responsibilities. Fifth secondary water supply should adopt safe, reliable, sanitary and environmental protection, energy-saving and water-saving technologies and equipment, and implement intelligent management.
Encourage enterprises and scientific research institutions to develop and produce secondary water supply facilities that are energy-saving and water-saving, safe and efficient, and purify water quality. Article 6 Any unit or individual has the right to complain and report acts in violation of the provisions of these Regulations.
Urban water supply, sanitation and other competent departments shall announce complaints and reports to the public, and handle complaints and reports in a timely manner. Chapter II Construction Management Article 7 The competent department of urban water supply shall, according to the special plan of urban water supply, co-ordinate the construction of urban public water supply pipe network and determine the setting of secondary water supply facilities according to law. Eighth new construction, renovation and expansion of buildings, drinking water pressure requirements exceed the pressure standard of urban public water supply network, can not meet the water demand, the construction unit or property owner shall support the construction of secondary water supply facilities.
The design, construction and supervision of secondary water supply projects shall be undertaken by units with corresponding qualifications.
If the secondary water supply facilities belong to the supporting projects of construction projects, they shall be designed, constructed and delivered simultaneously with the main project. Article 9 The design scheme of secondary water supply facilities shall be subject to technical review by the competent health department and the water supply unit. Article 10 The design and construction of secondary water supply facilities shall conform to the relevant national and provincial norms and standards, and meet the following requirements:
(a) water meter out of the house, one meter per household, metering to the household;
(two) the volume, pressure facilities and pipe diameter of water storage facilities meet the connection conditions and management requirements of urban public water supply pipe network;
(3) Water storage facilities shall be set up independently, and drinking water and fire water shall not share water storage facilities;
(4) Water storage facilities shall be sealed, rat-proof, dust-proof, leak-proof and corrosion-resistant;
(5) Wading materials shall conform to the relevant national and provincial quality standards and drinking water hygiene standards, and pipes, fittings, equipment and other non-environmental water storage facilities that are explicitly prohibited or eliminated by the state and the province shall not be used;
(6) There shall be no sewage pipes within 2m around the water storage facilities, and no pollution facilities such as pump house, septic tank and seepage well shall be set within10m, and toxic, harmful and corrosive substances shall not be piled up;
(seven) the necessary safety facilities should be set around the secondary water supply facilities;
(eight) other requirements stipulated by laws, regulations and rules. Eleventh after the completion of the secondary water supply facilities, the construction unit shall carry out washing, pressure testing and disinfection in accordance with the relevant technical specifications. , and passed the inspection by a water quality inspection agency with legal qualifications, and issued a water quality inspection report. Twelfth secondary water supply facilities are completed, the construction unit shall organize the acceptance. At the time of acceptance, there must be health authorities and water supply units to participate.
Without acceptance or unqualified acceptance, the secondary water supply facilities shall not be connected with the urban public water supply pipe network without authorization.
After the acceptance of the two water supply facilities, the construction unit shall, within three months, hand over the project files to the urban and rural construction archives institutions and file them with the competent department of urban water supply.
The competent department of urban water supply shall collect and keep the engineering archives of the existing secondary water supply facilities, and the relevant units and individuals shall actively cooperate. Chapter III Operation, Maintenance and Management Article 13 encourages the transfer of secondary water supply facilities to water supply units for management, and implements integrated and professional operation and maintenance with urban public water supply networks.
If the secondary water supply facilities are not handed over to the water supply unit for management, the property owner or its entrusted unit shall be responsible for operation and maintenance.
Measures for the transfer of two water supply facilities shall be formulated separately by the Municipal People's government. Fourteenth secondary water supply facilities operation and maintenance management unit shall establish and improve the secondary water supply facilities operation and maintenance management system, service standards and safety operation procedures, and comply with the following provisions:
(1) store water at low water consumption time;
(2) The operating noise of the water pump unit shall not be higher than the environmental noise standard stipulated by the state;
(3) The roof water tank and exposed secondary water supply facilities shall adopt anti-fouling, anti-corrosion and anti-freezing measures in accordance with the specifications and the requirements of normal water supply in abnormal cold weather;
(four) timely maintenance and renewal of corroded, damaged and aging secondary water supply facilities and components;
(five) the implementation of public security responsibilities and emergency management measures, the implementation of closed management of secondary water supply facilities;
(six) the establishment of secondary water supply facilities operation and maintenance management files, the operation, fault handling, cleaning, disinfection, inspection, transformation and other conditions one by one record.