First, how to draw the decoration water and electricity map?
1. The processing object of hydropower diagram is mainly electric power, which refers to the power supply and distribution system such as lighting system. Include socket wires, lighting wires, power wires and the like.
2. At present, the software has the layout of high-voltage equipment, namely sockets, high-voltage boxes and lamps. First, drag the high-voltage equipment to be arranged into the house from the material warehouse on the left, and pay attention to the fact that the chandelier will automatically adsorb on the roof.
3. Then click Start to draw high voltage. Click the left key in turn in the house to arrange the lines. Blue represents front and back, horizontal and vertical adsorption respectively.
Second, the decoration of hydropower transformation matters needing attention
On the reconstruction of waterway construction;
1. Before rebuilding the waterway, determine all water-related equipment, such as washing machine, water heater, toilet, washbasin water purifier, kitchen treasure, etc. If you want to close the redundant floor drain, you must block the gap between the drain pipe and the floor drain to prevent water from overflowing. Their location, installation method and whether hot water supply is needed. It is necessary to decide whether to use gas water heater or electric water heater to avoid changing the type of water heater temporarily, which will lead to repeated reconstruction of waterways.
2. After the kitchen and bathroom floor tiles are laid, check the drainage situation to see if the floor drain can drain smoothly. The bathroom floor must be waterproof. Be sure to do a 48-hour closed water test before bricklaying and plastering, so as to prevent water leakage from hurting the neighbors downstairs in the future. The waterproof height of the shower area wall is 180cm, and it is made in a cross shape in two times to ensure foolproof. Non-shower wall waterproof 120cm high, both sides do the same.
3. After waterway reconstruction, inhibition test should be carried out. At this time, the owner had better be present and play a supervisory role. It needs to be strictly followed: the waterway reconstruction should be treated with dew prevention to prevent condensation caused by supercooling of pipeline water and overheating of indoor temperature; Do scientific wiring, strictly abide by horizontal and vertical standards, reasonably control switches, and keep waterways and pipelines on the ground. Concealed acceptance of lines, pipelines, etc.
On the reform of circuit structure
The design of 1. circuit must be determined after careful consideration of feasibility, possibility and availability. Plan well in the early stage, so as not to feel that the socket is not enough in the future, and the location of the socket is also very important. Taking the bedroom as an example, it often happens that the socket is located directly behind the bedside table, which leads to the cabinet not being able to lean against the wall or wasting this socket. If the position of the socket is not left well, it is likely to conflict with the furniture placement or electrical installation in the later period. You have to connect the patch panel, which affects the overall value of the home. If you have children, it is easy to bring security risks.
2. Strong and weak wires can't be in the same pipe, which is easy to cause interference. Generally, this situation mainly appears in the living room: weak electricity is the telephone line and network cable, and strong electricity is the circuit. The electrical specification requires that PVC pipes and variable heads must be used for buried pipes.
How to draw the decoration water and electricity map? Because the hydropower drawings are professional drawings, it is necessary for the construction personnel who know the hydropower foundation to understand the drawings. As mentioned above, it is suggested that you should know more about some matters needing attention before the water and electricity decoration of the house, so as to ensure that you can be psychologically prepared in advance when you actually decorate.