Commitment Letter of Civilized Construction 1 Construction Unit: Wuhan Gas Thermal Power Group Company
Project name: greening project in front of Anshan natural gas gate. In order to implement the responsibility system for safe and civilized construction and ensure the safe operation and civilized construction requirements of field workers, the following commitments are made:
1. Actively participate in the publicity and education of safe and civilized production and construction, and consciously implement the policy of "safety first, prevention first".
2, abide by the responsibility system for production safety, safety and civilized operation procedures, safety and civilized production management system, obey the safety guidance, and earnestly achieve civilized construction.
3, special type of work must hold relevant certificates, abide by job specifications.
4. Colleagues should unite and cooperate, help each other and supervise each other, so as to achieve "three no harm" (no harm to themselves, no harm to others, no harm to others).
5. Abide by discipline and have the right to stop others from directing, operating or refusing illegal command.
6, completes the construction site, living quarters, dormitory hygiene and food hygiene, to prevent diseases and food poisoning.
7. Report potential safety hazards in time and take effective remedial measures decisively.
8, seeking truth from facts, put forward reasonable suggestions conducive to safe and civilized construction.
Wuhan anju xingye construction co., ltd
date month year
2 co., LTD., civilized construction commitment:
Upon receipt, your company will immediately organize relevant personnel to conduct careful research, and make the following commitments to the tenderee according to the scope, time limit, quality, safe and civilized construction, settlement materials, wage payment for migrant workers, warranty and other matters of the tender documents and contract conditions:
1. Commitment to contract conditions: acknowledge and accept the requirements of your tender documents and the constraints of contract conditions;
2. Time limit commitment: If our company wins the bid, our company promises to start construction within the specified time after receiving the notice of commencement, and complete all the project construction according to the contract time limit and node requirements;
3. Project quality commitment: ensure that the construction is carried out in accordance with the technical requirements and quality requirements of the bidding documents, and ensure that the project is qualified and meets the excellent engineering standards;
4. Commitment to safe and civilized construction: Strictly abide by the People's Republic of China (PRC) Law on Work Safety, Regulations on Work Safety Management of Construction Projects, Regulations on Work Safety License and other laws and regulations to ensure that no major accidents occur and achieve the following objectives.
5. Submit complete and effective settlement data;
6. Commitment to pay migrant workers' wages: establish a roster of migrant workers, publicize the payment of migrant workers' wages on time every month, and accept the supervision and verification of the labor and social security department and your company to ensure that migrant workers' wages can be paid in full and on time;
7. Warranty commitment: Our company promises to be responsible for any quality defects and their consequences of this project within the warranty period stipulated in the contract, and fulfill the warranty obligations in time according to the contract. Commitment unit:
Legal representative: xxx
Date: xx, xx, xx, XX
Article 3 of the Commitment Letter on Civilized Construction All interested parties:
Our company has the honor of winning the bid to build the project we invested in. In order to realize safe production and civilized construction and ensure the smooth progress of the project, our company and project manager solemnly promise to relevant parties:
1. Conscientiously implement the safety production laws and regulations such as the Construction Law, the Law on Work Safety and the Regulations on the Administration of Work Safety in Construction Projects, adhere to the principle of "safety first, prevention first", establish and improve the safety production management system of enterprises and project departments, and make it run normally and effectively;
Second, set up a project management team in accordance with the regulations, with full-time safety production management personnel, part-time safety officers for each team, and establish a safety production supervision and management network;
Third, the cost of safety and civilized measures paid by the construction unit will all be used for the purchase and update of construction safety protection appliances and facilities, the implementation of safety construction measures and the improvement of safety production conditions, and will never be used for other purposes;
Fourth, strengthen the safety education and training for the operators entering the site. Special operations personnel should hold valid certificates; All operators have received "Level 3" safety education and training, and can only take up their posts after passing the examination;
Five, the implementation of mandatory standards for production safety in engineering construction, strict and comprehensive implementation of the approved construction organization design and special construction scheme and its safety technical measures, and in accordance with the provisions, do a good job of safety technical disclosure;
Six, the company and the project department are in accordance with the provisions, hierarchical implementation of supervision and inspection, timely eliminate all kinds of accidents, and timely report according to the relevant provisions;
Seven, strengthen the civilized construction management of the construction site, educate employees to consciously resist the "four chaos" behavior, the fence, gate, washing table, road hardening, material stacking, building facade, overlay and catering, etc. Meet the requirements of civilization and hygiene;
Eight, accept the supervision of the administrative department of construction and construction, supervision, survey and design and social stakeholders, take seriously the instructions or opinions and suggestions put forward, and eliminate all kinds of hidden dangers in time;
Nine, the occurrence of production safety accidents, in accordance with the provisions of the accident management, timely report to the construction administrative departments, local production safety supervision departments and other relevant departments, and actively cooperate with the accident investigation and handling, and never conceal or delay the report.
The above commitment is the expression of the true consciousness of the enterprise and the project manager. If it is violated, it is willing to accept the punishment given by the relevant parties according to law or regulations.
Letter of Commitment (official seal): _ _ _ _ _ _ _ Project Manager (signature): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Commitment to Civilized Construction Article 4. According to the Construction Law of People's Republic of China (PRC), Safety Production Law of People's Republic of China (PRC), Regulations on Quality Management of Construction Projects, Regulations on Safety Production of Construction Projects and related laws and regulations, in order to strengthen the quality and safety production of construction projects, promote our company's awareness of quality and safety responsibilities, and ensure that quality accidents and safety production accidents are zero, our company solemnly promises as follows.
(a) before the construction project starts, my unit shall apply to the construction administrative department at or above the county level where the project is located for a construction permit in accordance with the relevant provisions of the state;
(two) my unit shall submit the construction drawing design documents to the construction administrative department at or above the county level or other relevant departments for review.
(3) Before receiving the construction permit or commencement report, our unit shall go through the project quality supervision procedures according to the relevant provisions of the state.
(four) the construction project contractor shall not force the contractor to bid at a price lower than the cost, and shall not arbitrarily shorten the reasonable construction period.
(five) our unit shall not express or imply that the design unit or the construction unit violates the mandatory standards of engineering construction and reduces the quality of construction projects.
(six) advocate the implementation of general contracting of construction projects, and prohibit the dismemberment of construction projects.
(7) Our unit shall, within 15 days from the date of completion and acceptance of the construction project, report the completion and acceptance report of the construction project and the approval documents or permission documents of the planning, public security, fire protection and environmental protection departments to the construction administrative department or other relevant departments for the record.
(eight) in the preparation of the project budget, our unit shall determine the cost of the safe working environment and safe construction measures for the construction project.
(9) Our unit shall not express or imply that the construction unit purchases, leases or uses safety protection appliances, machinery and equipment, construction machines and accessories, fire control facilities and equipment that do not meet the requirements of safe construction.
(10) Our company promises that if it fails to perform its duties in the project construction, it will be punished according to the following principles:
In violation of relevant laws and regulations such as People's Republic of China (PRC) Construction Law, People's Republic of China (PRC) Law on Work Safety, Regulations on Quality Management of Construction Projects and Regulations on Work Safety Management of Construction Projects, strict upper limit punishment shall be imposed in accordance with its provisions.
Construction unit (official seal):
Date:
Commitment to Civilized Construction Article 5 Our company XXXXXXXXXXX will, in accordance with the national construction norms and standards, comply with the requirements of the owner, work with the owner and the supervisor to fully build XXXXXXXXXXX project and create qualified products for the owner. Special commitments are as follows:
1, establish a safe and civilized construction organization and create a civilized construction site. The project manager is responsible for the safe and civilized construction, establishes a strict inspection system, dries day by day, adopts advanced construction management technology and scientific management methods, and builds the site into a standard civilized site.
2, pays special attention to the safety in production and field appearance, to ensure the engineering quality and safety in production.
3. The site is equipped with general layout and safety and quality publicity boards.
4. Stack materials according to the construction layout. There are systems and measures for material storage, so that the materials on site are piled up, piled up, free of water, rainproof and well ventilated.
5. The site office is clean and tidy, and the charts on the wall are complete to guide the construction.
6, complete management system, timely filing, according to the construction organization design and construction.
7. The on-site roads are smooth, the drainage measures are complete, the frontage is well fenced according to the regulations of the Municipal Construction Committee, and the fenced is firm.
8, construction measures written on the wall, special operations personnel related certificates.
9, keep the road clear on the construction site, so that the owner, supervision and management personnel can check and supervise.
10, all temporary power lines shall be laid according to the specification requirements. The equipment adopts "one machine, one brake and one box", and non-electricians are not allowed to use electrical facilities.
1 1. The scaffolding on the outside of the construction site should be closed in full length and height, and the dangerous parts of the construction should be
Hang up the safety net and do a good job of "four ports" and "five sides" protection to prevent personal fall accidents.
12, the canteen is clean and hygienic, and the party members are required to hold health certificates to ensure the health of employees.
13. Operators entering the construction site must pass the three-level safety education examination and wear safety helmets. It is forbidden to enter the construction site without wearing a helmet.
14. Smoking is prohibited on the construction site, and hot work is not allowed without approval. Do a good job in fire prevention.
15. Conduct civilized construction inspection once a month, train operators, strengthen environmental protection on the basis of improving environmental awareness, and pile up and clean up domestic garbage and construction garbage respectively.
Quality objective: to create qualified projects.
Site management goal: civilized construction site.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
20xx March 8th
Commitment to Civilized Construction Article 6 (1) Time for submission of design documents to be completed by contractors with design qualification level and business scope: The contractor must provide relevant design documents 30 days before the commencement of projects requiring secondary design on the premise that the construction period will not be affected.
(2) Name and completion time of plans and statements provided: a. Within 5 days after signing the contract, the contractor shall provide the supervisor and the employer with the total construction schedule in quadruplicate; B, on 25th of each month, report the project progress report (including monthly image progress, project settlement fee and monthly project price list) completed in that month to the supervisor, owner and agent construction unit (as of 20th of that month) and the construction progress plan, quantity plan and capital use plan for next month in quadruplicate.
(3) Undertake the responsibilities and requirements of construction safety and security work and non-night construction lighting: the contractor shall be responsible for all the work and bear all the expenses, and all the consequences arising therefrom shall be borne by the contractor.
(4) Requirements for office and living rooms and facilities provided to the owner: provide 2 on-site office rooms, each of which is 20 square meters, with 4 sets of office tables and chairs, 1 set of filing cabinets; 40 square meters meeting room 1 room, meeting tables and chairs 1 set; There are 2 on-site dormitories, each 20 square meters, each with 4 beds. The above expenses have been included in the total contract price.
(5) Relevant procedures of traffic, sanitation and construction noise management on the construction site that need to be handled by the contractor: The contractor is responsible for handling according to the relevant regulations of XX City, and bears corresponding responsibilities, and its expenses are implemented according to the relevant regulations, which have been included in the total contract price and used as lump sum.
(6) Special requirements and expenses for finished product protection of completed projects: Before the project is handed over to the Employer, the contractor shall be responsible for protection. During the contractor's protection, if the completed project is damaged, the contractor shall be responsible for repairing it and bear the corresponding expenses; If the Employer uses the completed project that has not been handed over in advance, causing damage to the project, the Contractor shall do a good job of repair in time, and the relevant expenses shall be borne by the Employer.
(7) Requirements and expenses for the protection of underground pipelines and adjacent buildings and structures (including buildings for cultural relics protection) and ancient and famous trees around the construction site: The contractor shall be responsible for protecting the buildings and structures around this project, and this part of expenses shall be included in the contractor's total tender offer. For the protection of underground pipelines and ancient and famous trees around the construction site, the contractor shall submit a protection plan, which shall be well protected after being approved by the engineers and supervision engineers stationed by the Employer. The protection fee shall be borne by the employer after it is approved by the employer. If the damage is caused by the contractor, the repair cost shall be borne by the contractor.
(8) Cleanliness and hygiene requirements of the construction site: The contractor shall ensure that the cleanliness and hygiene of the construction site conform to the relevant regulations and the requirements of civilized construction in XX city, and strictly abide by the management regulations on engineering quality, safety and civilized construction of the comprehensive service building in Automobile City during the construction, so as to achieve safe and civilized construction; In accordance with the provisions, set up car washing slots and other facilities at the entrances and exits of vehicles in the venues; Before the completion of the project, clean up the site to meet the requirements of municipal environmental sanitation and ensure the cleanliness of the construction site. The expenses incurred shall be borne by the contractor, and the losses and fines caused by the contractor's violation of relevant regulations shall be borne by the contractor.
(9) Other work agreed by both parties that the contractor should do:
A, due to the underground pipeline information provided by the employer to the contractor is only provided by the urban construction archives, the contractor shall verify the authenticity of the information, and the contractor shall be responsible for all problems caused by the contractor's failure to verify clearly.
B the contractor shall effectively protect the leveling points, coordinate points and control points provided by the employer. In case of any damage or loss during construction, the Employer shall contact the original lofting unit to re-lofting, and the expenses incurred shall be borne by the Contractor.
C, if necessary, the contractor must cooperate with the construction of power supply, water supply, municipal, cable television, communication, network and other departments.
D, in a timely manner to XX city construction administrative departments to handle the formalities of project construction, to ensure that start on schedule.
E, the contractor must be responsible for coordinating the local relations around, to ensure the smooth completion of the project, all consequences caused by the adjacent relationship shall be borne by the contractor.
First, change work functions, correct service attitude, do a good job in enterprise service and give full play to the role of labor security in line with the principle of "all for the enterprise and all for the enterprise".
Second, change the work style, improve work efficiency, conscientiously implement the responsibility system of first inquiry and one-time notification system, without delay or dispute, and never exceed the time limit for examination and approval, review and handling, so as to ensure that working hours can be handled as needed, and overtime is the default.
Three, strengthen the construction of industry style, the implementation of open government affairs, all fees and standards in strict accordance with the provisions of the collection, and do the fees and standards publicity, and consciously accept the supervision of the masses.
Fourth, strengthen the construction of labor law enforcement team, establish service consciousness, help enterprises solve practical problems, constantly improve the level of administration according to law, consciously safeguard the legitimate rights and interests of enterprises and workers, and provide good development space for enterprises.
Five, labor and social security work should strive to create the best investment environment in the region, provide quality services for attracting investment, and contribute to the construction of a modern new Nankai with outstanding characteristics and strong strength.
6. Publish the contact number and report number (contact number:), accept the supervision of all sectors of society, and severely deal with administrative personnel and law enforcement personnel who violate laws and regulations in labor law enforcement.
Commitment letter of civilized construction 7 I have the honor to undertake the construction of this project. In order to promote the civilized construction of the city's construction sites, improve the construction environment of the city's construction sites, and establish a good image of our company, we hereby make the following commitments on the civilized construction of this project:
1. The project is fully enclosed for construction management. In accordance with the requirements of standards and specifications and the implementation plan of creating a "civilized construction site", brick walls are constantly set around. The height is not less than 2.5 meters. The gray brick column is painted with white paint, and the gray glazed tile is the top. The publicity slogans are written in standard fonts on the facade and the main facade wall along the street.
2. The main entrances and exits of the project construction should be equipped with gates with a width of not less than 5 meters, and the materials and production must be solid and beautiful. A guard should be set up at the gate and a duty system should be established. Construction personnel should wear a "work card" when entering the site.
3. The main import and export roads, material storage yards and processing plants on the construction site should adopt hard concrete floors and be hardened. Sidewalks can be paved with cinder or graded gravel soil. The whole construction site should keep the roads unblocked and the drainage unblocked, so as to prevent cross-flow of sewage.
4. Materials such as sand and gravel shall not be piled up outside the construction fence, and roads shall not be occupied for construction, and the roads along the street around the construction site shall be kept clean and hygienic at any time.
5. Vehicles transporting materials on the construction site should be kept as tight as possible, and personnel should be arranged to clean them up immediately if there is any.
6. Scaffolds on the construction site should be hung with dense mesh in two or more steps to keep them clean and tidy. Damaged scaffolds should be replaced in time.
7. Try to keep the construction site clean and tidy. Building materials, components and machines must be stacked and set up according to the layout of the general plan. Sand and gravel bulk materials should be enclosed by masonry, rod materials should be stored by vertical frame, all kinds of blocks should be neatly stacked, and signs such as materials, machine names and specifications should be hung separately.
8. Hang "six cards and one map" (project overview card, construction personnel overview card, ten safety discipline cards, ten safety measures cards, health notice cards, and site layout plan) in an eye-catching position on the construction site. The specifications of the cards are generally not less than 120×80㎝.
9, the construction site should be responsible for the safety and civilized construction management personnel, regular inspection, found that the problem timely rectification, the safety and civilized construction and other issues must actively cooperate and seriously implement.
10. If I fail to carry out the project construction according to the above commitment, I voluntarily accept the punishment that the Municipal Construction Management Office cancels the bidding qualification, suspends business or revokes the qualification certificate.
Commitment: xxx
Commitment letter for civilized construction of Area 8 Construction Committee:
I have the honor of building 2#, 4# and 6# of Shangmashi low-rent housing project in Kaili City. In order to promote the civilized construction of the site in the whole region, improve the construction environment of the site in the whole region and establish a good image of our company, we hereby make the following commitments on the civilized construction of this project:
1. The project is fully enclosed for construction management. According to the document number, brick walls are continuously set around. Director of district construction bureau. The inner and outer walls of the wall are polished with cement mortar, and the surface is painted. The facade and the main facade along the street are written in standard fonts.
2. The main entrances and exits of the project construction are provided with gates, iron gates are installed, and the door head is provided with an enterprise door head plate with an advertising light box.
3. The main entrance and exit roads of the project are hardened, and concrete pavement with a width greater than 5m, a length greater than10m and a thickness of about10cm is poured. Washing equipment should be set up at the gate, and special personnel should be arranged to be responsible for washing.
4. Materials such as sand and gravel shall not be piled up outside the construction fence, and roads shall not be occupied for construction, and the roads along the street around the construction site shall be kept clean and hygienic at any time.
5. Vehicles transporting materials on the construction site should be kept as tight as possible, and personnel should be arranged to clean them up immediately if there is any.
6. Scaffolding on the construction site should be hung with a dense mesh safety net for more than two steps. The safety net should be kept clean, and the damaged safety net should be replaced in time.
7. Try to keep the construction site clean, the materials are neatly stacked and clearly marked, and the construction waste is cleaned up in time.
8. If I fail to carry out the project construction according to the above commitments, I voluntarily accept the punishment that the District Construction Committee cancels the bidding qualification, suspends business or revokes the qualification certificate.
Hereby promise
Supervisor: Commitment:
Year, month, sun, moon, sun.