First, the kitchen wall tiles how to paste solid
1, paste the kitchen wall tiles before the wall grass-roots level of treatment. Before tiling should be cleaned up grass-roots level, such as lime plaster, latex paint, wallpaper and other decorations on the wall, or dirt on the ground, must be cleaned up, otherwise the cement mortar and grass-roots bonding is not firm; in addition, if the wall itself has cracks, should be done to properly deal with the tiles, so as to avoid the basic structure of the future cracks become bigger resulting in wall tiles cracking or falling off; there is also a large gap in the level or verticality of the floor, wall The first thing you need to do is to use cement mortar to level the surface.
2, paste the kitchen wall tiles, pay attention to the type of glue to choose. Deacetic acid type paste wall it's good transparency, fast vulcanization, and in the curing easier to release acetic acid, with a pungent odor, and, it is on the coated glass, metal and some inorganic materials have a strong corrosive. Dehydration type type of wall adhesive curing shrinkage is very small, low degree of water immersion peeling, most of the original material is also not corrosive amount of marble, plastic and steel materials such as adhesive poor; used at high temperatures, easy to form small bubbles, affecting the quality of tiling. Deacidified wall glue should not be used for cement, stone material, because the acidic glue is easy to solidify the acetic acid, easy to react with cement, stone and other alkaline materials on the surface, and its coefficient of expansion is very large, if the fit is too thin, the surface will wrinkle phenomenon, affecting the overall degree of aesthetics.
Second, after the waterproofing project how long before you can paste the kitchen wall tiles
1, paste the kitchen wall tiles need to wait for the waterproof layer, the protective layer is completely dry and solid before you can do the whole waterproofing process is done roughly takes 5 to 7 days, and then you can paste the tiles, if the schedule is not tense can be extended appropriately.
2, kitchen wall tiles do waterproof wall is mainly divided into three steps. The first is the first grass-roots level to deal with the requirements of the grass-roots level surface, dry; the second is the waterproofing materials, generally will have to paint three times; the third is to carry out water closure test, which is mainly to test the quality of indoor waterproofing.
Kitchen wall tiles want to stick firmly must do a good job before paving wall grass-roots level, choose the right type of glue is also key. After the waterproofing project needs to be done in the waterproof layer, the protective layer dry solid before being able to pave the kitchen wall tiles.