Current location - Recipe Complete Network - Catering franchise - Work summary of real estate development company: 5 articles

Work summary of real estate development company 1

I have been in the company for almost half a year. With the strong leadership

Work summary of real estate development company: 5 articles

Work summary of real estate development company 1

I have been in the company for almost half a year. With the strong leadership

Work summary of real estate development company: 5 articles

Work summary of real estate development company 1

I have been in the company for almost half a year. With the strong leadership and caring support of the company leaders, I personally learned a lot in 20xx, gained a lot and made great progress. 20xx's personal work is summarized as follows:

I. Annual Work Situation

1, familiar with the rules and regulations of the company.

20xx joined the company in September. In order to integrate into the company team faster and better and lay a good foundation for future work, I stepped up my understanding of the company's rules and regulations and became familiar with the company's corporate culture. Through understanding and familiarity, I am proud to join the company's team, but I also feel my own pressure. In the future work, I will take the company's rules and regulations as the criterion, be strict with myself, be honest and self-disciplined, dare to innovate while adhering to the principles, and complete the task faster and better.

2. Be familiar with the project status and site conditions.

As a construction worker, it is quite beneficial for future work to be familiar with and understand the site. In order to carry out the work better in the future, we have a deeper understanding of the site layout by communicating with previous contractors and consulting engineering technical materials.

3. Project construction

20xx September-65438+1 October1The construction of sewage pipes and septic tanks around the building was completed; Calculate the completed construction area and negotiate the engineering quantity before accounting.

20xx 165438+ 10-65438+February, the asphalt pavement construction in the whole community was completed; Line drawing of asphalt pavement and installation and construction of speed bump are completed; Construction of sewage pipeline around Building No.5 in Phase II is completed; Phase I 1 Building, concrete road and absorbent brick cushion around Building 6 are completed; Phase II Building 5 and

18 Building's surrounding roads and absorbent brick cushion are completed; Calculate the basement and garage area of the completed building and calculate the price.

Second, the existing shortcomings and improvement measures

20xx is about to die with the wind. Looking back on my work in the company in the past six months, although the workload is not large, there are not many highlights, and many jobs are still unsatisfactory. To sum up, the shortcomings mainly include the following points:

1, lack of communication, unable to make full use of resources.

In the process of work, due to the lack of understanding of the whole external environment of the company's projects, I did not take the initiative to ask other colleagues for advice, which led to the reduction of work efficiency and the underutilization of superior resources. As the saying goes, "Three people must have a teacher". In the future work, I will actively strengthen communication with other colleagues and enjoy resources through the company's platform, so as to improve my business level and work efficiency.

2. Lack of planning

In the process of work, especially in the construction stage of project development, due to the lack of planning, the expected results are often not achieved, and the leaders are dissatisfied and full of grievances. In the future work process, I will make a work plan carefully, strengthen my understanding of the purpose, and strive for twice the result with half the effort.

Three. Measures and suggestions for completing the 20xx target plan

I put forward the following suggestions on project management.

1, contract management

Contract plays an important role in project management. Without it, project management is impossible, and contract is the basis of project management.

Familiar with the contract. And conduct in-depth and detailed research on the contract, and be aware of key terms, loopholes, possible changes and disputes.

Establish a strong sense of contract. Before the contract is signed, the status of the owner and the contractor is equal. On the one hand, the project manager does not intimidate others by force, forcing the contractor to accept conditions outside the contract; On the other hand, we should also be alert to the traps laid by contractors in the process of project implementation. When the contractor puts forward various suggestions, the first thing he thinks of is to abide by the contract and fully estimate the possible economic problems caused by adopting the suggestions.

2, schedule control

Schedule control is one of the key factors for project success. What the engineering department should do is to prepare the project management plan, study the overall progress, construction layout, main construction technologies and construction problems of the project, and make plans for possible problems in the project implementation process. Formulate a system, standardize management and improve work efficiency.

20xx years have passed, although the project is only the first phase of the finishing project, and the second phase of the project has not been officially started, but it has also gained a lot. In particular, the solid work style and serious and responsible work attitude of several leaders of the company set an example for us. Summing up the past, looking forward to the future, new environment, new opportunities and new challenges, it is worth thinking about how to do my job well with high quality, high efficiency, low consumption, on schedule, safety and civilization. In the future work, I will conscientiously implement the relevant regulations of the company, give full play to my subjective initiative, restrain myself with iron discipline, constantly learn new technologies and experiences, and be good at summing up. I also hope that the company leaders can give me more understanding and support, and strive to contribute to the development of the project.

Work summary of real estate development company II

Supervise the supervision engineer and the construction unit to manage in accordance with relevant laws and regulations, so as to ensure that the construction site is orderly, civilized and safe, does not disturb the people, and the environmental sanitation meets the requirements. Coordinate internal and external relations to create a good environment for normal construction.

4. Construction of Engineering Department

Over the past year, through mutual understanding, everyone's business level and work ability have become familiar with each other. Everyone can go to work and use their spare time to strengthen their business study.

Due to the instability of the budget plumbing staff, it brings a lot of inconvenience to the usual work, such as the proposal of material quantity, the audit of the construction unit's progress plan, the audit of bidding quotation and so on.

Except for the * * building, * * building, * * building and * * building, the budgets of other buildings have not yet been formed.

Three. Lessons learned and improvement measures

* * After nearly a year's construction, the new home project has been inspected irregularly at ordinary times and comprehensively in June165438+1October13 in 20** years, as well as the accumulation of previous experience in handling various formalities, and it is found that there are both successful experiences and lessons of failure in all aspects.

1. Before going through the formalities, carefully consider the reported items, minimize changes and shorten the processing time of intermediate links. If the planning scheme is passed, report it to the lobby completely or return it.

2. The selection of the construction unit shall be determined through bidding, and a powerful construction enterprise shall be selected. Sign the construction contract in time, define the time limit for a project, investment, quality and safety requirements, and create favorable conditions for the management in the construction process. * * For various reasons, the supplementary agreement has not been signed. In the future, development projects will be selected through public bidding according to their own strength.

3. The supervision unit chooses public bidding, signs a supervision contract, clarifies the supervision responsibilities and rights, gives full play to the role of supervision during the construction period, and is managed by the development unit to reduce the personnel investment of the development unit, mobilize the enthusiasm of the supervision personnel, and manage the project well, otherwise the supervision unit will be held accountable. * * The supervision department adjusted all the supervisors from the beginning of the project, and the engineering department also fined them once, but now the quality of the supervisors is still very low.

4. On-site management personnel should give full play to the role of supervision engineer, strengthen the inspection and acceptance of intermediate links, dare to manage, ensure the quality of subdivisional work, and improve the overall quality of the project.

5. Through inspection, it is found that the archives of each unit are not arranged in time. Site supervisors are required to strengthen file management and check the progress of the project at any time. It is strictly forbidden to make up after the completion of the project, and lay a good foundation in archives. Due to the untimely supervision and inspection, the archives were rebuilt.

6. Strengthen cooperation with relevant departments and strictly control the quality of materials together with the supervisor. Unqualified materials are put forward in time and are strictly forbidden to be used in the project. Because there are many materials provided by Party A, this aspect should be strictly controlled.

7, increase the intensity of rewards and punishments, severely punish the construction units that violate the rules seriously, and reward the excellent construction units in all aspects. Several fines have been imposed on construction units this year, which have little impact on some construction units.

Four. 20xx working assumption

1, strengthen the internal management of the engineering department, use winter to strengthen professional knowledge learning, be familiar with drawings, and make good preparations for construction. Try to arrange an hour of study every afternoon.

2. I hope the company has all professionals, namely a civil budget officer, a water heating and electricity budget officer and a water heating engineer, to strengthen communication among professionals, form a joint force, and strive to achieve personnel stability. Ensure the smooth progress of the project construction.

3, Rongshan, * * project give full play to the role of on-site supervision, in addition to the economic visa, other aspects should be supervised. The engineering department shall set up a site general representative to be responsible for personnel management. Hydropower engineers are responsible for Rongshan and * * projects.

4, on-site management to carry out the responsibility, division of labor and cooperation. Strengthen the supervision regular meeting system and the inspection of intermediate acceptance links, verify the progress plan report in time, put forward opinions and reports, and suggest timely funding.

5, the engineering department of various professional engineers to collect information in time, and supervise and inspect the completion data of the construction unit, to prepare for the completion acceptance of the completed project.

6. Cooperate with materials department, site general manager and professional engineers to make suggestions on materials. The materials department will purchase materials in strict accordance with the requirements of drawings and communicate with professional engineers at ordinary times. Unqualified materials will not be used in this project.

7. I hope that next year, focusing on engineering construction, funds will be allocated in time according to the situation of funds and the progress, so as to ensure the timely completion of the project.

Work Summary of Real Estate Development Company III

During the nearly three-month construction period from August, 20xx 15 to winter shutdown, with the joint efforts of the construction unit, supervision unit and construction unit, the project went smoothly as expected. Under the leadership of the company's project manager, the supervision unit and the construction unit communicate with each other, solve the problems existing in the construction as quickly as possible, and take effective pre-control measures for possible problems in advance. The following is a personal summary of this project:

I. Daily work

1, responsible for the supervision and management of project construction. Under the leadership of the project manager, urge the construction unit to optimize the construction scheme, work overtime, coordinate the relationship between the construction teams, and solve a large number of problems and contradictions in the construction.

2, responsible for project quality management. Daily on-site inspection, found quality problems, timely send a letter to the construction unit, requiring the construction unit to make rectification within a time limit, and proceed to the next process after acceptance.

3, responsible for site safety management. Supervise supervision units and construction units to strengthen on-site safety management, eliminate potential safety hazards and avoid safety accidents.

4. Participate in supervision meetings. Put forward the problems existing in the project and the situation of solving the problems to the construction unit within one week. Compare the weekly estimated work plan with the actual work plan, find out the reasons for the delay in the construction period, and put forward suggestions and methods to solve it. At the same time, review whether the plan and schedule submitted by the construction unit are reasonable.

5, urge the construction unit to speed up the construction progress. Check the site material supply of the construction unit, and check whether the staffing of each construction team is reasonable and whether it affects the construction progress.

6. Cooperate with the construction unit. Communicate with the design institute in time during the construction to solve the problems existing in the drawings.

7, responsible for the management of engineering data. Supervise and urge the construction unit to make a record of acceptance of concealed works, and do a good job of signing, stamping and saving engineering data.

8, responsible for the construction drawing to submit for approval.

9. Be responsible for completing other tasks assigned by the company leaders.

Second, the project completion

1, done? Building 0.000***25: 20#, 2 1#, 22#, 23#, 24#, 32#, 33#, 34#, 35#, 36#, 37#, 45#, 46#, 47#.

2. Complete the first floor of Building ***6: 19#, 25#, 38#, 44#, 55# and 58#.

3. Complete the second floor of Building ***4: 18#, 3 1#, 56# and 57#.

4. Building * * *1has been capped: Building 6.

Third, quality control.

1. Strictly control the acceptance procedures: strictly control the quality of each working procedure and define the acceptance procedures. During the process, the company's management personnel and supervision professional engineers conduct on-site inspection to control the process quality. After the process, the professional quality inspector of the construction unit shall promptly report to the professional supervision engineer for inspection, and the professional supervision engineer shall notify the management personnel of Party A to go to the site for acceptance. Party A's management personnel and supervision engineer agree to be qualified before proceeding to the next working procedure, and sign and seal the acceptance data. This kind of acceptance procedure effectively promotes the supervision's awareness of quality control and prevents the acceptance from being too formal.

2. Special acceptance: during the construction of 1 bid section, the emphasis is on the acceptance of special items, such as the acceptance of straight threads of steel bars, the acceptance of electroslag pressure welding, and the acceptance of template flatness. Do not meet the requirements of design drawings and specifications, rectification within a time limit. Send contact letters and rectification notices when necessary, and take measures such as fines if the circumstances are serious.

Fourth, schedule control.

1. Require the construction unit to ensure the supply of materials: the main materials to be supplied are steel, formwork and reinforcement materials, wood squares, scaffolding, waterproof box insulation materials and materials needed for water heating and electricity.

2. Require the construction unit to ensure the number of construction teams: In order to speed up the construction period, the construction unit should be urged to increase the number of team construction personnel in time during the construction process to ensure the construction period.

Five, safety and civilized construction control

Check the site safety and civilized construction trends, immediately send a contact letter or notice to the problems found, and make rectification within a time limit. After the inspection, summarize and compare at the supervision meeting, further implement the on-site construction situation, and do a good job in on-site civilized construction.

Insufficient intransitive verbs

1, lack of communication between departments and posts. Owners, supervision units and general contractors, general contractors and subcontractors should communicate frequently and cooperate closely, keep abreast of the production situation of the project, solve various problems in the project construction, and promote the smooth progress of all work.

2, grasp the site civilization construction work is not done well. Supervise the supervision unit to organize on-site inspection, and ask the construction unit to rectify in time when problems are found, and do a good job in on-site civilized construction.

3. No on-site safety inspection was organized. Supervision units should often organize on-site safety inspections to check whether there are potential safety hazards. If so, the construction unit shall be required to deal with it in time to avoid safety accidents.

Xxx project civil site administrator: xxx

Xxxx,xxxx,xx,xx

Work summary of real estate development company 4

Yiyuan Street is located in the central city with an area of 0.85 square kilometers. There are many municipal administrative organs and few commercial outlets. With the rise of the real estate industry, eight office buildings headed by Yidong Building have brought business opportunities to Yiyuan Park.

The financial revenue of 200x Yiyuan Street is 5 1 10,000 yuan, of which 43.44 million yuan comes from Yidong, Jinyuan, Egang, Rotary, Rotary, Yongsheng, Xinyuan and Women's Federation, accounting for more than 80% of the total financial revenue of the street. In addition, around the eight buildings, there is also a catering culture street, a karaoke street and a leisure street serving the buildings, which also provides business opportunities and employment opportunities for residents in the one-yuan area. Only the security guards, workers and vehicle management personnel of these eight buildings have placed 230 laid-off workers in their jurisdiction.

"Building economy" is an economic form with commercial buildings, functional plates and regions as the main carriers, which embodies the characteristics of intensification and high density. It is accompanied by urbanization and is a new way for urban centers to develop regional economy. According to statistics, the benefits generated by many companies in a high-grade commercial building are equal to the economic benefits within 7.8 square kilometers of the urban-rural fringe. Shanghai took the lead in developing the building economy. And gained successful experience. For example, the tax paid by enterprises in Jing 'an District of Shanghai accounts for more than 40% of the total tax revenue, of which the tax revenue of Kerry Business Center on Nanjing West Road reached 654.38+0.42 billion yuan in just half a year, which shows that the huge energy contained in the "building economy" cannot be underestimated. Practice has proved that "building economy" is not only a noun, but also contains the orientation of the development direction of street economy, which is the transformation from street-run enterprises to regional economy. With the development of society, the central city has entered the era of "building economy", and the three-dimensional commercial street will be the highlight of street economy.

Work summary of real estate development company 5 pages

As we all know, in the past year, the decline in house prices led to a sharp decline in domestic real estate sales. Although there is no bubble in the real estate economy of our province and our city, it is inevitably impacted by the environment and climate of these countries. There has been a difficult situation of poor sales.

However, in this grim situation, all employees of our company can closely unite around the board of directors, under the correct leadership of the board of directors, with the strong cooperation of the party branch and the trade union, carry forward the spirit of brave struggle and overcome many difficulties. Compared with the same type enterprises in the same industry in this region, we still achieved sales results in the whole city. The above situation is summarized as follows:

A, production, sales, property services departments to complete the main work of the year:

1,-Annual sales of sales department-Construction area of commercial housing is about 20,000 square meters. -Annual sales of sales department-The construction area of commercial housing is about 40,000 square meters. Last year, our company sold about 60,000 square meters of commercial housing.

-The sales department also actively organized internal and external sales staff, and completed a lot of publicity work, which effectively enhanced the company's image, popularity and sales effect.

2.- Engineering Department: The annual construction area is 79,000 square meters.

After a year of construction, it was completed on schedule, and the owner returned to the building at the end of 2008. -Engineering Department: the annual construction area is 64,000 square meters.

-By the end of 2008, the main works of 23 buildings in the first phase will all be capped.

Above, our company completed the construction area of143,000 square meters last year.

-The Engineering Department has also completed the corresponding project management and quality management. —— The Engineering Department was awarded "Advanced Unit of Provincial Building Science and Technology Demonstration" by the Provincial Construction Department. -The building was rated as "provincial high-quality structural main community" and "provincial building energy-saving special demonstration project". -The project was rated as "the first provincial energy-saving 65 pilot community". -was awarded the title of "advanced individual in energy conservation work" at the provincial level.

3.—— The collection rate of property management fees completed by the property service company last year exceeded 87%.

—— The service station of the property management company closely focuses on the "green grass, green trees, fragrant grass and water" proposed by the company leaders in strengthening the service to the owners and improving the living environment quality of each service community; The community is clean and sanitary, and there is no word paper; Great efforts have been made in the three basic management objectives of "safety, comfort and no car loss in the community". -Century New Town was awarded the title of "Excellent Residential Quarter" by the municipal government and "Excellent Property Management Residential Quarter".

4. Brokerage companies complete the sales of second-hand houses and-commercial houses and-commercial houses throughout the year.

Second, the tasks completed by other departments.

1, planning department:

In cooperation with the sales department and the sales work of the sales department, the Ministry completed the task of organizing more than 80 reports and advertisements in-; Complete the editing and publishing tasks of issues 8, 9 and 10; Cooperate with the media such as-to complete more than 40 publicity activities such as "-Cup Love-100 Reason", "-Night" and "Gunmen Friendship", which effectively publicized the company's external image, introduced the company's new products and improved the company's sales effect.

2. The finance department:

Last year, the Ministry allocated the construction funds in time and recovered all kinds of funds. Completed the tax declaration and various financial statements, and was rated as-2- credit unit of the year by the Provincial Industrial and Commercial Bank, which provided strong financial support for the company to complete the annual project construction plan, achieving error-free throughout the year and ensuring the safety of capital operation.

3. Human Resources Department:

The human resources department has overcome many difficulties, with few personnel and heavy tasks. Last year, * * * represented the company in six job fairs in provinces and cities. * * * Recruited 56 employees, including administrative staff 10, 8 technicians, 20 salesmen and 27 property security and cleaning staff, which ensured the normal operation of all departments.

4. Development Department:

With the direct participation of -manager, the Ministry has the courage to innovate and take risks. Carefully compiled the influential -20 10 -20 10 -20 10 -20 1 1 year -20/kloc-0 in the real estate industry. Kloc-0/ 1 year -201year -20 1 1 year-201year-201. Kloc-0/ 1 year-201year-201year -20 1 1 year-201. Kloc-0/ year -20 1 1 year -20 1 year-201

At the same time, according to the requirements of the board of directors, the Ministry overcame many difficulties and completed the application and bidding work of "-"and "-"from land requisition to obtaining the commercial housing sales (sale) license in time. It has contributed to the legality of our company's real estate development and commercial housing sales.

5. Office:

Under the direct leadership of the board of directors, the office is an important institution engaged in administrative management, legal affairs, logistics support, external liaison and coordination of the work of various departments of the company. Last year, the office presided over the general manager's office meeting, and compiled 27 minutes, 48 inspector work briefing and 17 briefings. Review more than 500 contracts of the company, receive and handle dozens of legal and administrative affairs; It has made significant contributions to safeguarding the legitimate rights and interests of the company, maintaining the reputation of the company, coordinating the work of various departments of the company, maintaining the normal operation order of the company, and correctly handling disputes with owners and other departments.

With the joint efforts of all staff, an atmosphere of "comparing, learning, catching up and helping" is taking shape. —— In, * * * produced 19 advanced employees, that is, 1 sales champion, after the democratic appraisal of all employees and the approval of the leading group and the board of directors; 5 excellent employees; ② Excellent departments; 1 excellent team; 2 excellent managers; There are 1 1 advanced employees. They have made outstanding contributions to the development of the company in different positions. Here, on behalf of the company's board of directors and all employees, I would like to express my heartfelt congratulations and heartfelt thanks for their hard work!