The structural characteristics of the covering materials on the back and front of the plate must be the same or similar. Generally, the moisture content of the substrate is required to be 6~ 10%, and the materials selected should be the same batch as far as possible. When processing in the workshop, shorten the loading time as much as possible, and pay attention to the different coating thickness, pressing time and pressure due to different material characteristics and different moisture content of covering materials.
Carlson Hotel Furniture Demand Recommendation. From Urumqi, Xinjiang to Harbin, Heilongjiang, from Huerhaote, Inner Mongolia to Sanya, Hainan, from Xishuangbanna, Yunnan to Hangzhou, Zhejiang, Carlson basically covers the whole country. In addition to undertaking and successfully completing various star-rated hotels (such as Sheraton, Intercontinental, Hilton, Marriott and Howard Johnson Hotel), the company has also completed a number of furniture supporting projects such as high-end villas, clubs, restaurants, finely decorated apartments and hotel chains.