(1) Pre-design
1. Define the areas involved in the renovation process.
2, clear the bearing wall size.
(two) the main body is removed or changed.
In the construction stage, the main body demolition and reconstruction is an earlier project, which mainly includes wall demolition, wall building, wall covering, heating removal, plastic steel window replacement and so on. To put it bluntly, it is to set up the framework of the construction site first.
(3) Hydropower transformation
1, to see whether the position of the lampblack machine socket affects the installation of lampblack machine in the future;
2. See if the location of the water meter is appropriate;
3. See if the location of the water inlet is convenient for installing the sink in the future.
(4) Woodworking
Woodworking, bricklayer and oiler are the "three brothers" in the construction process, and the basic order of appearance is: wood-tile-oil. The basic entry principle is-whoever is dirty goes first.
In fact, carpentry, such as vertical pipe, decorative ceiling and plaster line, can also be considered as the fine link of main demolition and reconstruction in a sense, which does not conflict with the water circuit reconstruction itself, and sometimes needs some cooperation.
(5) Tiling
1. Installation of lintels and marble windowsills. The installation of the threshold can be completed together with the floor tile laying, or after the floor tile laying. Generally, after the window cover is completed, the marble installation union prepares glass glue and seals the marble and window cover with glass glue.
2. Install the floor drain. Floor drain is 1 in home improvement hardware, because it should be installed with floor tiles.
3. Installation of range hood. The range hood is the first 1 appearance of household appliances. After the kitchen wall and floor tiles are laid, you can consider installing a range hood.
(6) Paint the wall
The "Third Oil Worker" enters the site, mainly completing the basic treatment of the wall surface, painting the top coat and brushing the furniture made by the "carpenter".
(7) Ceiling of kitchen and bathroom
As an installation link, the cabinet ceiling is still continuing the "packaging" of the home. At the same time as the ceiling of the kitchen and bathroom, the moisture-proof ceiling lamp and exhaust fan (Yuba) of the kitchen and bathroom should have been bought. It is best for students to install ceiling lamps and exhaust fans (Yuba) in the kitchen and bathroom at the same time, or leave a line and an opening.
(8) Install the kitchen cabinet
After the ceiling is completed, you can make an appointment to install the cabinet at home. If it goes well, it can be finished in one day. At the same time, there are sinks (excluding water fittings) and gas stoves. It is best to coordinate the property to turn on the gas before the cabinet is installed, because the gas stove needs to be tested after installation.
(9) Wooden door installation
The second day after the cabinet was installed, as early as more than a month ago, after the wooden door was measured, it can be installed now. If it goes well, it will be a day. At the same time, hinges, door locks and floor drains should be installed.
(10) Floor installation
The floor can be installed the day after the wooden door is installed. If all goes well, it will take a day. The floor installation needs to pay attention to the following issues:
1. Before the floor is installed, it is best to let the manufacturer come to the door to investigate whether the ground needs leveling or partial leveling. Some decoration companies or decoration teams will suggest leveling or partial leveling, which is subject to the actual investigation of the floor manufacturer.
2. Before the floor is installed, the floor paved at home should be cleaned to ensure the floor is dry, so do not use water during the cleaning process.
3. When installing the floor, if possible, the floor must be cut in the corridor.