It starts from Baqiao Bonded Zone Station in the northeast, passes through weiyang district, Xincheng District and beilin district, and reaches Yuhuazhai Station in Yanta District in the southwest.
There are 0/9 underground stations and 7 elevated stations: Yuhuazhai Station (underground)-Zhangba North Road-Yanpingmen Station (Metro Line 8)-Keji Road Station (Metro Line 6)-Taibai South Road Station-Jixiang Village Station-Xiaozhai Station (Metro Line 2)-Dayanta Station (Metro Line 4)-Beichitou Station-
Changle Park Station-Tonghua Gate Station (Metro 1 Line)-Hujiamiao Station (Metro Line 7)-Shijiajie Station-Xinjiamiao Station-Guangtaimen Station (Metro Line 8)-Taohuatan Station-Xianghuwan Station-Wuzhuang Station-International Port Station-Shuangzhai Station (Metro Line 14
Construction planning
According to the EIA report of Xi Urban Rail Transit Construction Plan (20 17-2023) in June 20 16, the second phase north extension of Xi Metro Line 3 (from Bonded Zone Station to Liushui Road Station) is 2 kilometers long, with stations 1 station, and the line is underground along Xigang Road.
Xiyan (Yuhuazhai Station to Kunming Pool Station) has a total length of 8.3 kilometers, and there are 5 stations, all of which are underground stations. The line is laid along the road around the lake and Fuyu Road in turn, with an average station spacing of1.7km, a maximum station spacing of 2,253m and a minimum station spacing of1.080m..
Value meaning
After the opening of Xi Metro Line 3, Xi Metro 1 Line and Xi Metro Line 2 were interchanged at Tonghua Gate Station and Xiaozhai Station respectively, forming the main skeleton of Xi rail transit network, which plays a very important role in relieving Xi traffic pressure, broadening the urban skeleton, promoting land development and utilization along the line, increasing passenger flow and improving the economic benefits of the subway itself.
Reference to the above content: Baidu Encyclopedia -Xi Metro Line 3