What are the procedures for the renovation of Nanchang Bar?
Nanchang Bar Decoration Procedure:

Obligations to be performed by the client.

(a) the qualifications and conditions that should be possessed.

(a) the building is solid and safe, with a business area of more than 30 square meters. Dangerous houses, simple houses, temporary houses or dangerous goods warehouses shall not be opened within 50 meters;

(2) The installation of electrical equipment in the business premises, the configuration of fire-fighting equipment, and the safe evacuation passage for personnel conform to the relevant provisions of fire control management;

(3) The light in the business place is bright, and the indoor illumination shall not be lower than 15 lux;

(4) The business place is equipped with emergency lighting equipment, and the emergency lighting time lasts for more than 20 minutes;

5] The restaurant area is more than 8 square meters, and no internal locking device is allowed. The room is equipped with doors and windows (if conditions do not allow, windows can be set on the doors). The width and length of the window shall not be less than 0.6m, and it shall be equipped with transparent glass, with clear sight and no dead angle indoors;

[6] Seatbacks and guardrails on both sides of cafes and bars shall not be higher than1.2m, and closed boxes or lighting adjustment devices shall not be set;

Once equipped with qualified security responsible person and security personnel.

(2) When applying to the local public security bureau (county) for handling matters, the applicant shall submit the following certification materials:

(1) An application report;

(2) Certificates and approval documents issued by the building quality inspection department, superior administrative department and relevant administrative departments;

(three) fire inspection opinions issued by the fire supervision institutions;

(4) The valid identity certificates of the legal representative and the person in charge of the operation, the certificate of passing the public security business training in special industries and public places, and the relevant certificates issued by the local police station (police department);

(five) the identity documents and work certificates of the employees;

(six) the contract certificate of the leased house;

(seven) the plan and text description of the building and internal facilities;

Other materials that need to be examined by the public security department.

Obligations to be performed by the office

Order of work

If the above materials are complete and meet the requirements, the public security department in charge of acceptance shall issue a Registration Form for Public Security Permit Application to the applicant. After the applicant fills in the form, the public security department will conduct preliminary examination and audit according to the division of responsibilities. To meet the start-up conditions, the issuance of the "security permit"; If the audit fails, it must be improved within a time limit. If no improvement is made within the time limit, the application procedures will be stopped, the application materials will be returned, and the reasons will be explained to the applicant.

(2) Time limit for handling affairs

The public security department shall make a decision on examination and approval within 30 days from the date of acceptance.