Current location - Recipe Complete Network - Catering franchise - What new policies does the country have for photovoltaic power generation?
What new policies does the country have for photovoltaic power generation?
On March 10, 2020, the National Energy Administration issued the document "Notice on the Construction of Wind Power and Photovoltaic Power Generation Projects in 2020", which made it clear that the total subsidy budget for new photovoltaic power generation projects in 2020 was1500 million yuan. Among them, 500 million yuan is used for household photovoltaics, and subsidized bidding projects (including centralized photovoltaic power plants and industrial and commercial distributed photovoltaic projects) are organized according to the total subsidy of 654.38+0 billion yuan. That is, the average household subsidy is 500 million yuan, and the industrial and commercial and ground bidding projects are 654.38+0 billion yuan.

On April 2, 2020, the National Development and Reform Commission issued an authoritative document, which clearly explained the photovoltaic subsidy policy in 2020. It is clear that in 2020, the subsidy standard for household distributed photovoltaic total power generation included in the financial subsidy scale will be adjusted to 0.08 yuan per kWh. That is, the household power station subsidizes 0.08 yuan per generation.

From these two policies, it can be concluded that the scale of family subsidies in 2020 is:

According to the total subsidy amount of household photovoltaic is 500 million yuan, the annual utilization hours 1000 hours and the relevant national price policies, the range of 500,000 kilowatts is determined by rounding down.

When the household photovoltaic subsidy intensity is 0.08 yuan per kWh, 500 million yuan1000 hours/kWh = 6.25 million kilowatts. Round to six million kilowatts. That is 6GW. That is, the capacity that can be included in subsidies in 2020 is 6GW.

According to the interpretation of the National Energy Administration, the household projects to be included in the scale in 2020 are: 65438+ 10/,from 2020 to the grid-connected deadline. It should be emphasized that the state is not allowed to grab the household use index in advance and build it first.