Current location - Recipe Complete Network - Catering franchise - Pharmaceutical High-tech Zone Taoyuan Economic Cooperative pollution treatment methods
Pharmaceutical High-tech Zone Taoyuan Economic Cooperative pollution treatment methods
According to the "Tonghua Medicine Hi-tech Industrial Development Zone ecological environmental protection key issues rectification work program", water, gas, solid pollution prevention and control, industrial park management, environmental supervision and law enforcement to make relevant provisions.

(a) Water pollution prevention and control

The main problem: no construction of centralized sewage treatment facilities.

Rectification requirements: accelerate the progress of the construction of sewage treatment plant, complete the construction of sewage treatment plant and supporting pipeline network by the end of 2017, officially operate and meet the discharge standards. At the same time, the installation of automatic online monitoring devices and networking.

(B) Air pollution prevention and control

1, most of the restaurant fumes have not realized the high-altitude emission.

Rectification requirements: environmental protection branch to regulate the installation of oil smoke purifiers in the catering industry, so that the installation rate of large-scale catering oil smoke purifiers 100%, 80% of medium-sized, small 50%; urban construction departments to develop the catering industry flue set up a work program and implementation.

2, agricultural straw burning ban on the establishment of three-tier prevention and control system is not in place. The implementation of the responsibility of the material is missing, the relevant publicity work support material is less.

Rectification requirements: environmental protection branch to develop high-tech zone straw burning ban work program. Increase the publicity of straw burning ban, do a good job of archiving; Social Welfare Bureau to develop a comprehensive utilization of straw in high-tech areas of the work program, and the village community signed a straw burning ban on the responsibility system, the implementation of the village (community) to ensure the responsibility; comprehensive law enforcement brigade to strengthen the spring and autumn seasons of straw burning law enforcement inspections.

3, most of the boilers are not built flue gas desulfurization denitrification facilities.

Rectification requirements: the development of the jurisdiction of the boiler management plan, and organization and implementation.

4, construction dust control is not enough attention, measures are not in place.

Rectification requirements: the development of building construction units dust control management system and measures, the implementation of building construction units dust management responsibility.

5, total coal consumption control is not responsible for the department, the relevant responsibility is not clear.

Rectification requirements: preparation of documents related to the control of total coal consumption, the development of rectification work program.

6, the development of clean energy without responsible departments, the relevant responsibility is not clear.

Rectification requirements: to prepare for the development of clean energy related documents, the development of rectification work program.

7, clean coal supply no responsible department, the relevant responsibility is not clear.

Rectification requirements: preparation of clean coal supply related documents and information, the development of rectification work program.

8. There is no department responsible for the withdrawal of poor-quality coal from the market, and the related responsibility is not clear.

Rectification requirements: preparation of documents related to the withdrawal of poor-quality coal from the market, the development of rectification work program.

9, heavy pollution weather response warning forecast system is not perfect.

Rectification requirements: revise and improve the high-tech zone heavy pollution weather warning related materials.

10, the road machine sweeping rate is low, walking paths, green belts cover less.

Rectification requirements: the development of road machine sweeping, walking paths, green belts and other issues to develop a work program, and implemented according to plan.

(C) solid waste pollution prevention and control

The main problem: there is the problem of private disposal of waste motor oil.

Rectification requirements: strengthen supervision and management, establish an account management system, and sign disposal agreements with qualified units.

(D) industrial park management

Main problem: centralized heating is not fully covered

Rectification requirements: the study of high-tech zone centralized heating measures, develop a plan, and according to the plan to implement.

(E) environmental regulation and law enforcement

Major problems and requirements for rectification work:

1, most of the boiler soot, sulfur dioxide, nitrogen oxides emissions do not meet the requirements of the new standards, there are problems of excessive emissions. Hengyuan Thermal Company more than 20 tons of boilers are not required to install online monitoring equipment.

Rectification requirements: Hengyuan Thermal 3 20 tons of boilers above the installation of desulfurization and denitration pollution prevention and control facilities, the installation of online monitoring equipment and networking. Located in Taoyuan, Jiangbei ginseng market near the two 6-ton coal-fired boilers to develop a demolition and transformation plan, and organization and implementation.

2, 2015 environmental protection inspection, 2016 random sampling, environmental protection law enforcement monthly inspection problems have not been rectified in a timely manner.

Rectification requirements: Tonghua Yuantong Steel Pipe Co., Ltd. to carry out environmental monitoring, meet the standards and qualified by the High-tech Zone Management Committee issued a commitment to demolition and relocation of the enterprise for the temporary record; Tonghua Amber Biotechnology Co., Ltd. to speed up the construction of the sewage treatment station construction progress, March 30 before the completion of commissioning and operation and monitoring, environmental protection and acceptance before the official production.

(F) environmental emergency management

The main problem: sewage enterprises are not in accordance with the relevant requirements to carry out environmental emergency knowledge training and environmental emergency drills, insufficient environmental emergency material reserves.

Rectification requirements: to carry out environmental emergency knowledge training and environmental emergency drills, improve the relevant files, film and television materials and environmental emergency supplies reserves.