Current location - Recipe Complete Network - Catering franchise - Has Fanxian Zhongxin Steel Plant resumed work?
Has Fanxian Zhongxin Steel Plant resumed work?
Go back to work. As of June 5438+065438+1October 12, 2022, according to the local epidemic prevention policy, Fanxian Zhongxin Iron and Steel Plant resumed work. It is necessary to check the negative certificate of nucleic acid test within 48 hours, the sense of responsibility of the main body of epidemic prevention and control, strictly implement the requirements of epidemic prevention and control, resolutely implement various epidemic prevention and control measures, and build a market epidemic prevention safety barrier.