If a unit is found to have potential safety hazards, it will be ordered to rectify by the relevant departments. What are the templates for the rectification notice? The following is the template of the rectification notice of fire safety hazards that I have compiled. Welcome to read it.
1
xxx Catering Co., Ltd.:
According to the Fire Protection Law of the People's Republic of China, the fire safety management personnel of our company conducted fire safety supervision and inspection on your unit, Rooms 318 and 319, Block C, xx Building on. The following violations of fire laws and regulations were found:
1. The indoor fire hydrant was blocked.
2. Fire emergency lighting system is not installed as required.
3. Emergency evacuation guide signs are not installed as required.
4. It is not stipulated to equip corresponding fire-fighting equipment.
the above acts violate the provisions of Articles 11, 12, 21 and 21 of the Fire Protection Law of the People's Republic of China, which has constituted a fire hazard. According to the provisions of Article 25 of the Fire Protection Law, your company is ordered to complete the rectification before February 5, 2118, otherwise our company will impose penalties.
during this period, your company should take measures to prevent fire.
Beijing xx Property Management Co., Ltd.
XX, XX, XX, XX, XX, XX, XX, XX, XX, XX, XX, XX, XX, XX, XX, XX, XX, XX, XX, XX, XX, XX, XX, XX, XX, XX, XX, XX, XX, XX, XX, XX, XX, XX, XX, XX, XX, XX, XX The following fire hazards were found:
1, _ _ _ _ _ _ _ _
2, _ _ _ _ _ _ _ _
3, _ _ _ _ _ _ _ _
Rectification measures: _ _ _ _ _ _ _ _ _ _ _
Please ask your unit (department) to make rectification according to relevant regulations before _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
during the rectification, your unit should take measures to ensure fire safety and prevent fire.
supervisor of the inspected unit (signature) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ It is found that you have the following behaviors in violation of fire laws and regulations:
□1, □ without fire design review, □ fire acceptance, □ spot check for record, □ without putting into use, and fire safety inspection before business;
□2. The color steel plate building is built with polystyrene as sandwich material;
□3. Production, operation and personnel accommodation are not separated by fire, □ staff dormitories are set up illegally, □ electricity and fire are used illegally;
□4. Fire fighting facilities, equipment and fire safety signs are not fully configured and kept intact and effective;
□5. Stop using or dismantle fire control facilities and equipment without authorization;
□6, □ occupy, □ block, □ close evacuation routes and safety exits;
□7, □ occupy, □ block, □ close the fire truck passage;
□8. Other fire safety violations:
Please make rectification in time to eliminate fire hazards in accordance with the relevant provisions of the Fire Protection Law of the People's Republic of China, and complete the rectification within days, and inform our company of the rectification results in writing. If it fails to be rectified within the time limit, our company will investigate the responsibility according to the relevant regulations and submit it to the key section of the Fire Supervision Department of Guangzhou Public Security Fire Bureau. If a fire or accident occurs, resulting in any loss of personnel or property, all the consequences will be borne by your unit.
person in charge of the inspected unit (signature): _ _ _
safety inspector (signature): ____
__ _ _ company
_ _ _ _ _ _ _.