I. Infrastructure work

(A) Capital construction work

1. 17 student apartment building construction. 17 student apartment building is the "Twelfth Five-Year Plan" planning for the continuation of the project, the construction area of 38,456 square meters, the use of the function of the student dormitory. 2012, in the school of the school's vigorous promotion and efforts to resolve the planning adjustments and the demolition and relocation of the East Three East Four building of the Ministry of Land and Resources Party School Training Center. In 2012, under the vigorous promotion and efforts of many parties, the project was officially started in November 2012 after solving the problems of planning adjustment and the demolition and relocation of the Party School Training Center of the Ministry of Land and Resources in the East 3 East 4 Building.

2. Report on the feasibility study of the Engineering Experimental Building. Engineering Experimental Building (former Jewelry Building) is a new project in the school's "12th Five-Year Plan", the Infrastructure Department completed the preparation of the feasibility study report of the project and submitted it to the Ministry of Education for approval.

(B) renovation and repair work

1. The Exchange Center renovation project. In order to meet the 60th anniversary of the founding of the school and improve the meeting environment, we applied for special funds for repair and purchase in 2012 to renovate the communication center. After months of intense construction, the use of various functions of the communication center has been improved, and in the style of decoration and supporting building to maintain consistency. The project was formally handed over in August 2012, ensuring the arrangement of meetings during the university celebration.

2. Renovation and repair of the former School History Center, School Labor Union and Halal Dining Hall. The original school history museum, school union, halal restaurant is located in the school summer culture square north of a series of old buildings, old and dilapidated, line aging, in need of repair. Since 2011, the school applied for special funds for repair and purchase, began to these buildings for remodeling and repair. 2012, completed the remodeling of the school history hall, the original school history hall converted into a school hospital health room and the school trade unions office room; complete the school trade unions remodeling of the staff cafeteria and handed over to the use of the school trade unions; complete the repair of the mosque canteen and handed over to the use of the halal cafeteria.

3. Completing the construction of green space; in 2011, the Student Activity Center was dismantled and the green space of the swimming pool was built on the original site; in 2012, the construction of the green space was completed and passed the acceptance of the Beijing Greening Engineering Association.

(C) Infrastructure Renovation

1. In January 2012, the No. 5 transformer and distribution room was relocated, and the power capacity of No. 17 student apartment was reserved.

2. Coordinate the planning of the school's electricity load to ensure the safety of electricity during the school festival. New construction of the 17th building electricity, adjustment and transformation of the 14th floor of the school, halal dining hall, staff dining hall, school hospitals and trade unions office room, east one east two buildings with electricity.

Two, logistics

1. Campus environment improvement work. According to the relevant requirements of the Office of the school celebration, the Logistics Department on the school's 60th anniversary of the school celebration logistical services to protect the work of China University of Geosciences (Beijing) 60th anniversary of the implementation of the program logistics support group to implement the program, and the campus environment improvement work. Combined with the activities of the 60th anniversary of the school celebration, the campus was comprehensively greened and beautified with the greening around the International Conference Center, Gymnasium, Library and Shaw Building as the nodes. Completed the re-carving of stone statues of Li Siguang, He Changgong, Gao Yuangui, Liu Type and "Geologists". Completed the carving and production of Premier Wen Jiabao's personal inscription "cradle" Taishan stone carving. Completion of the construction of the school "foundation stone" project. In order to celebrate the 60th anniversary of the school activities, set off the campus festive, joyful, vigorous atmosphere, in accordance with the "grand and warm, the main body highlights the scale of moderation, innovation and thrift" principle, the implementation of the school celebrates the flowerbed layout project. Completion of the school playground silicone PU plastic basketball court, Zhoukoudian internship station basketball court repair and renovation project. Completed the maintenance project of the steps under the east side of the school playground bleachers; completed the maintenance project of the school playground bleachers (podium) flooring paint pavement. Completed the construction of permeable tiles in the western family area and the installation of security doors and plastic steel windows in the residential buildings. Completing the repair and cleaning of the statue of Chairman Mao. Completing the maintenance project of the main gate (center gate) of the main building; completing the painting project of the office building, the ground transfer building and the playground fence. Completed the pruning project of the canopy of the street trees on the main road of the campus. Completing the transplantation project of 37 courses of oil pines on the north side of the fence of the playground. Completion of the tree transplantation project of the 17th floor construction of the student residence. Completion of the cable laying project for the big screen in front of the library on the school anniversary. Completed the temporary adjustment project of the venue (playground) for the school festival party. Completing the waterproofing project on the roof of the 8th floor of the Comprehensive Office Building and the Dependents; completing the maintenance and painting project of the 3rd and 4th floors of the Teaching Building; completing the maintenance and painting project of the public *** hallway of the Testing Building; completing the renovation of the 22 bathrooms of the Testing Building; completing the renovation and improvement project of the laboratory of the School of Land Science and Technology; completing the renovation and improvement project of the laboratory of the School of Water Resources and the Environment; completing the maintenance and improvement project of the laboratory of the School of Materials Science and Engineering.

2. The purchase of student dormitory furniture. According to the school's 2012 annual procurement plan for student dormitory tables and chairs, open bidding for the community, **** purchase of 500 sets of bunk beds, 70 sets of eight-panel tin cupboards, 50 iron bookshelves, iron two-drawer table 80, iron square stools 1500.

3. real estate work. Completion of the budgetary work of the school staff housing subsidies; complete the staff housing subsidies issued 7,293,700 yuan; complete the transportation, property, heating costs of staff living off-campus payment work, a total amount of more than 3.8 million yuan. On behalf of the university, we completed the supervision and management of the property service work of Guotian Property Company; to make its property management work more humanized and its property service more harmonious and stable.

4. Completion of the Beidaihe and Zhoukoudian internship stations to receive teaching internships. Zhoukoudian internship station *** receive students 42,200 person-days, teachers 1,900 person-days; Beidaihe internship station to receive students 39,123 person-days, teachers 3,202 person-days (of which: the University of the Earth (Beijing) students 17,486 person-days, teachers 1,548 person-days); 188 person-days of externship, students 1,414 person-days.

5. Power and energy conservation. Conscientiously implement the national "Energy Conservation Law", "Energy Conservation and Emission Reduction "Twelfth Five-Year Plan" and the spirit of "China University of Geosciences (Beijing) Energy and Water Conservation Work Implementation Program"; pass the supervision and inspection and special audit of energy conservation work of the university by several departments of the state and Beijing, and rectify the problems identified during the inspection; and write the "China University of Geosciences (Beijing) Energy Conservation Work Implementation Program". China University of Geosciences (Beijing) Energy Utilization Status Report", and reported to the governmental authorities respectively; wrote "China University of Geosciences (Beijing) Water Supply Emergency Plan", and replaced the health license; wrote "China University of Geosciences (Beijing) Air Conditioning Management Regulations"; wrote "Research Report on School Power Supply Protection System", assessed the current status of the school's power supply, analyzed the reasons for high-voltage tripping, and put forward strategies to deal with the situation. Actively organized repair and basically ensured normal power supply; secured 41,000 energy-saving light tubes with 10% of the total price; applied for 2.7 million RMB funding from the Ministry of Housing and Construction for the construction of the energy consumption monitoring platform; continued to improve the drawing of underground pipeline maps on the basis of the 2011 version, and divided the strong power into low-voltage and high-voltage in 2012; continued to complete the "Weak Power Underground Network Project of China University of Geosciences (Beijing)" Phase II, Phase III of the project; cleaned up the overhead wires on campus, removed more than 30 cement poles along the main road and west of the stadium stands; ensured the smooth operation of elevators, water supply and frequency control system; strengthened the management of the secondary measuring instruments; repaired the short-circuit accidents of the overhead wires for many times; completed the accounting and collection of water and electricity fees of the on-campus business units; and completed the collection of statistical reports and related information for the Beijing Municipality and the Ministry of Education for the months, quarters, and years. Completion of monthly, quarterly and annual collection, statistics, compilation and filing of statistical reports and related information; completion of energy-related work with secondary units on campus; completion of the commissioning project of the relay group in the distribution room and issuance of the "test report", and rectification of the five major problems in the commissioning; checking and debugging of the lightning protection system of the campus buildings; replacement of the main valves in the first and second floors of the senior high school, the ninth floor of the family and valves of the door buildings; renovation work of water supply under the ninth and tenth floors of the family; replacement of water supply water tanks in the western district; replacement of water supply water tanks in the western district. Project; the West District to replace the water supply tank; repair the steam line, solving the problem of gas in four places; complete the research building water source heat pump cleaning; solve the 19th floor of the school for many years of water leakage problems.

6. The Logistics Department signed a service guarantee agreement with the Logistics Group. Logistics Department and Logistics Group signed 14 service guarantee agreements, with a total funding of 21.95 million yuan. 2012, the logistics system enthusiastically, high-quality, efficient, civilized, and safe to complete the logistics support tasks assigned by the school, the level of management and quality of service has been improved.

7. Improvement and revision of system regulations. Logistics Group Finance Department in accordance with the requirements of the use of school funds, in the group funding budget, income management, fund approval, financial supervision and other systems have done a lot of work to improve the group's financial management process, to ensure the rationalization of the use of group funds. The Group Procurement Center has added new contents such as "Specification for Procurement Market Inspection", "Procurement Analysis System" and "Inventory Management System" to the existing procurement system, which has greatly improved the quality of the products procured while reducing the procurement cost.

8. Services. Logistics Group adhere to the concept of "people-oriented" to improve the satisfaction of teachers and students as the goal, enhance the service consciousness, and do a good job in all services. Catering Center successfully passed the joint inspection by the Municipal Education Commission for the Five Ministries on Strengthening the Work of College Canteens, and declared to the Municipal Education Commission for the acceptance of standardized canteens. Greening and Sanitation Service Center has passed the preliminary acceptance of standardized campus. The Transportation Service Department of Logistics Group was awarded as "Advanced Unit of Traffic Safety in Haidian District University System". During the summer vacation, we successfully completed the logistic support work of Zhoukoudian Internship Station. The mailroom received and distributed 26,095 pieces of registered mail, express mail, remittances and parcels, an increase of 3% over last year, without any error. The Property Service Department collected about 2.75 million yuan of rent, water and electricity fees on behalf of the school, and successfully completed the targets set by the school; the Elevator Service Department is responsible for the normal operation of the school's 41 elevators.

10. Service ability to improve. The ability to deal with emergencies and cooperate with the completion of large-scale school activities and other aspects of the ability to improve, in the face of emergencies, rapid response, and can summarize the experience in a timely manner, the formation of feedback, and further improve the management system. In the face of the "7.21" rainstorm, the group all staff in the school's unified deployment, concerted efforts to ensure that all positions to stay on duty, and the first time to respond to minimize the loss.

Three, the neighborhood committee work

(a) school work

1. Ensure the effectiveness of comprehensive community management, and increase management efforts to prevent rebound. With the strong support of the school and the relevant departments of the College Road Street Office, the neighborhood committee to ensure the effectiveness of the governance through strict vigilance, rotating shifts on holidays and so on.

2. Increase the management of illegal construction, and find ways to eliminate the emergence of new violations. 2012 *** stop and demolition of 18 illegal construction under construction.

3. Stopping illegal renovation and demolition of load-bearing walls more than 20 incidents, in the case of individual disobedience to the logistics and real estate sector immediately reported to the joint discouragement to stop.

4. Renewed most of the old building of the public **** building doors and building windows, the community loess open ground all the hardening treatment, not only beautify the environment, but also increased more than 50 parking spaces.

5. To assist the Infrastructure Office to deal with the student apartment building 17 engineering nuisance and civil disturbance. We have held many residents' forums and communication meetings, and through the introduction and explanation of the project, we have won the support of the majority of residents for the construction of the project.

6. In order to create the atmosphere of the school celebration and reduce the impact of the community environment on the school celebration. Resident committee in the school and college road street with the support of a large-scale community environment and health management work. Cleaned up the garbage dead ends behind the 9th floor of the community dependents and along the dripping water of the old building for many years; assisted the Security Department in inspecting the fire safety hazards in the residential area for many times and cleaned up 13 fire hazards in the residential area of the community in conjunction with the police station and the city management department; cleaned up the fire hazards including fire hydrants being occupied, blocked hallways, occupied fire escapes, and piling up a large amount of inflammable debris in front of the house; cooperated with the Security Department in prohibiting dogs from entering the teaching area; Carried out 3 times of centralized cleaning of small advertisements, the small advertisements on the main sections of the street were cleaned up before the school festival; contacted the Experimental Third Primary School in Haidian District to paint its exterior walls to avoid negative impact on the school festival; carried out large-scale environmental improvement of the dependents' area before the school festival, and cleaned up more than 30 piles of objects and obstructions outside of the building; centralized cleaning of more than 450 used bicycles in the community; and carried out emergency emergency repairs and minor repairs of the road surface, such as more than 10 collapsed damages. More than 10 collapsed and broken road surface, storm emergency duty rescue and heavy snow emergency snow removal work; the day of the school festival arranged for all social workers and 30 volunteers in the community patrol duty, and all-day monitoring of key people, to prevent their influence on the school festival activities.

(II) Community Construction

The College Road Street Office supported more than 100,000 yuan to renovate the bicycle shed on the 26th floor of the family, 50,000 yuan to harden the east side of the 9th and 10th floors of the family, and 50,000 yuan to repair the road at the intersection of the 18th floor of the family. The establishment of a convenient vegetable shop, which sold more than 375,000 kilograms of various kinds of vegetables in 2012, at a lower price compared with the nearby communities, providing convenience and benefits for the faculty and staff. Establishment of a convenient dried fruit and fruit store, annual sales of about 120,000 kilograms of fruit. Seasonal introduction of agricultural and sideline products such as cabbage, sweet potatoes, honey, rice, etc. to provide convenience and affordability for residents. The introduction of the garbage-for-vegetables-and-fruit program, which will play a role in the school's environmental protection and energy conservation efforts.

(C) street work

Community with the College Road Street Office of the residents of a number of work, involving party building, civil affairs, social security, population, family planning, Women's Federation, Federation of Disabled Persons, comprehensive governance, judicial polls, conscription, culture, sports, health, fire, security, mobile population, housing security, community services, letters and visits and other aspects.