I have been working as a quality inspector for some time. Looking back on this year's quality inspection work, I have benefited a lot. During this year as a quality inspector, I seriously studied and practiced the company's quality management control process. Through work and study, my work skills have been improved to a necessary level. For the treatment of quality problems in engineering, it has been greatly improved, and it has the necessary ability to determine and analyze. Then I would like to share with you some thoughts about the work of quality inspectors, hoping to help you.
Quality inspector's working experience and feelings 1
The year of 21 _ _ is coming to an end. Memories are both busy and rewarding during this year, which makes me feel both happy and worried. I have been doing quality inspection work in injection molding workshop for more than 3 years, and my position does have necessary work pressure, but for me, no pressure means no motivation. As a quality inspector in the workshop, in order to make myself grow faster and improve my work, I have made the following work summaries:
1. Check the quality in my work
As a quality inspector, I should not only master professional testing knowledge, but also be careful to find problems, find problems and solve them. So this year's on-site quality work has benefited me a lot. Before inspection, you should learn to understand the product drawings and try the product. According to the requirements of quality process, do a good job of supervision, find and correct the problems existing in the inspection process. Cooperate with the operator to make a comprehensive inspection of the product quality, and put forward and correct the problems in the product in time. Follow-up and check the process of special products to ensure that each process is qualified. Strictly control the quality of the incoming products and summarize and analyze the results afterwards, so as to facilitate the continuous improvement of the work. Before leaving work every day, do a good job of handing over the quality problems in the inspection process. Record the merits of the problems that are easy to appear in the future during the inspection process, and constantly improve the personal professional inspection level; Seriously reflect the quality problems existing in the site and the problems that need to be solved by the company.
2. Shortcomings and problems in the work
1. There is still a necessary gap in product quality requirements, which leads to the phenomenon of returning goods in small batches. On the one hand, due to the lack of meticulous personal inspection and sufficient professional knowledge, on the other hand, when the workload is large and the time is long, the work efficiency is not high.
2. I'm not sure whether it is clear or not when I find quality problems, and I'm not decisive enough, and I need the help of leaders when I deal with some things.
3. Due to the shortage of quality inspection staff, long working hours and increased workload, if one person asks for leave, no one will replace him.
3. Work plan and improvement for next year
1. I will further develop my advantages, improve my shortcomings and do my best to do my job. We must adhere to a good mental state and carry forward the spirit of hard work, advancing despite difficulties, striving for perfection, being rigorous and meticulous, learning and enterprising, and daring to fight hard. Clear up work ideas and improve work efficiency.
2. Before the inspection, I should first know the products that need to be inspected, and I should make preparations in advance before the inspection, and carefully supervise the inspection.
in the end, our company pays attention to the cultivation of employees' skills, team spirit and enthusiasm for going to work. I believe that I will grow up in the development of your big family, and we must grow up!
feeling of quality inspector's working experience 2
It has been _ _ _ years since I came to _ _ _ _ Co., Ltd., and my work has gradually adapted to the new environment and new protagonist, which is inseparable from the help and support of the leaders and predecessors of the group company and the project department. _ _ _ _ _ Co., Ltd. has adhered to the business philosophy of "quality promotes enterprises" for many years, and the selection of _ _ also attaches great importance to the quality of enterprises. As a quality inspector, I feel very honored to be integrated into such a team. Therefore, how to adapt to the management mode of the project department as soon as possible and better complete my job is also the goal that I will continue to strive to achieve in my future work.
on the day when most enterprises in the construction industry are pursuing the maximization of their own interests, it is very rare for _ _ _ _ _ _ Co., Ltd., which has won many provincial and municipal construction industry awards, to still put the project quality in the first place for enterprises to pursue their goals. Since I came to the _ _ _ _ project department of _ _ county, which was built by _ _ _ _ Co., Ltd. on _ _ _ _, 21, my heart is full of expectations. For this reason, it is not easy for _ _ Group to win the award of _ _ excellent enterprise in succession, and it will be beneficial to my future career development to have effective project management methods that are stronger than other enterprises. The project manager of _ _ _ _ _ Co., Ltd. is a project manager with _ _ years of experience in construction and quality management. His rich experience and knowledge, coupled with admirable professionalism, have really set an example for young people and are also my learning goals.
in the _ _ _ months when I worked as a quality inspector in the _ _ _ project department, the _ _ building of the project plot completed the construction tasks of the second floor above ground and the _ _ underground garage. I am also learning by doing, constantly making up for my lack of self-construction experience. At work, I always ask myself to see, listen, do and think more at the construction site. And really learned a lot, for example, in the main construction, reinforced concrete column rebar is often prone to the quality common fault of rebar displacement, which seriously affects the engineering quality. In the initial inspection, this problem was ignored due to lack of experience, so we should pay attention to check whether two or three positioning stirrups are bound and whether the column body is equipped with protective cushion blocks as required to ensure the position of rebar. I think that's how experience is accumulated bit by bit. As long as you persevere, you will always get something.
in the past few months, both the company and the leaders of the project department have attached great importance to the _ _ _ project, especially the quality. Manager Xu and technical director Wang Gong often give me pertinent opinions and work guidance. Although I really feel the pressure to do a good job in quality inspection, this pressure can also be said to be a kind of motivation, which also makes me more sure of the importance of quality inspector's work and clear the development direction. At work, I will try some practical operations, such as bricklaying, calendering concrete floor, and binding steel bars. In practice, I will ponder and understand what the reasons are and what improper operations will cause engineering quality problems.
As a full-time quality inspector, my construction experience is really not very rich, which also leads to the poor foresight potential necessary for quality inspection, so there are still many deficiencies in quality management. Of course, this is not an overnight event, but a long-term accumulation process. In order to make up for the lack of experience, the first point is to master the specifications and atlas skillfully. At work, I often look through the acceptance specifications and combine them with the actual inspection on site, which can better deepen my understanding of the specifications and become my own thing, instead of memorizing them. The second point that needs to be mentioned is the understanding of the drawings. In the construction process, the builder and the quality inspector have the deepest understanding of the drawings. As a quality inspector, they can understand the intention of the drawings, which is also the premise of quality inspection. At work, I will also check the actual construction situation on the spot more according to the drawings, strengthen the control of the construction process, and find problems in time. The third point is the record of the construction diary, which is an honest record of the daily construction situation and a very good means to accumulate experience. Through the quality inspection record, we can summarize the common quality problems that often appear in this project, which brings the basis for the prevention and inspection work in the future.
In the daily inspection process, drawings, specifications and atlas are mainly used as the basis for inspection. In the on-site construction process, according to the engineering quality acceptance standards of Liaoning Province, the quantity, types, specifications and sizes of reinforcement projects are strictly compared with the drawings for inspection, and the spacing of reinforcement, the overlapping and anchoring length of reinforcement, and the electroslag pressure welding process are strictly controlled, and the concealment records are made before the reinforcement projects are concealed; Formwork engineering mainly controls the positioning axis, formwork splicing, internal formwork size, verticality of wall formwork, formwork reinforcement and support, reserved hole position, etc. The new steel-wood formwork is used for the first time in the _ _ _ building. The new formwork has the characteristics of simple installation and debugging, flexible turnover, good visual quality after concrete forming, and can meet the standard of fair-faced concrete. The new formwork greatly improves the forming quality of concrete, shortens the construction period and reduces the construction cost. However, because it is the first time to use this formwork, there are still some shortcomings in the construction technology and quality control experience. For example, the wall formwork is not jointed at the corner of the wall, resulting in slurry leakage in many places at the corner of the yin and yang. In the process of work, it is also a process of continuous learning. By understanding the new formwork construction technology and methods, the quality control methods and measures are summarized. In the process of concrete pouring, the whole process of supervision was carried out, and the vibration, concrete grade and slump during concrete pouring were strictly controlled. In quality inspection, try to think, see and check, and make construction quality inspection records and construction diaries. Since the project started, there are still
places where the quality inspection is not in place, and some problems appear, except for the lack of experience, or the drawings are not clear and detailed.
The quality work in the coming year will have a long way to go. In addition to strengthening the daily quality inspection, we should record, feedback and recheck the quality problems that occurred in the project quality in _ _ _ _ _ _ _ _, such as the spacing between steel bars, reinforced concrete protective layer, formwork splicing and support reinforcement, concrete pouring and vibrating, and further improve the quality management system of the project department, as well as the personnel of the organization, quality management regulations, reward and punishment regulations, etc. on the basis of _ _ _ _ _ _ _. As a quality inspector, I will take on the responsibility, strengthen the quality management on site, and constantly sum up the previous experience and lessons in my work, cultivate the foresight in my own work and apply it to the project. The construction profession is different from other industries. It needs to constantly check and supervise on the spot, find and solve problems at any time, and constantly enrich what I have learned from the practical work of the project, so that my on-site comprehensive treatment potential can be exercised and improved. Further develop the advantages, improve the shortcomings, and do your job with all your strength. We must maintain a good mental state, be hard-working, rigorous and meticulous, and make progress with heart.
feelings of quality inspector's work experience 3
21__ years will soon pass, and I spent another year growing up in a blink of an eye. Looking back on the past year, I got a lot of help from everyone, and I also learned a lot from everyone. The biggest feeling in my heart over the past year is that it is not difficult to be a qualified workshop inspector, but it is not so simple to be an excellent inspector. I think: a good quality inspector should not only be modest and upright, but also be conscientious about his career and work. And it is necessary to specialize in ideological and political work skills. I, as a young quality inspector, need to learn a lot.
As a quality inspector, I can't help feeling the importance of my responsibilities all the time. Therefore, in my practical work, I always strictly demand myself and be cautious. First of all, we must have the responsibility of always taking the quality policy as the index and defining the product quality.
at work, I devote myself seriously, and learn other products and read more product drawings in my spare time, so that I can have a necessary understanding of product drawings, structural principles and performance. And listen to the experience carefully and record it carefully. In the future work, I will redouble my efforts to learn professional knowledge, master a variety of skills, achieve multi-skills, make up for the shortage of manpower when the workload is heavy, and ensure the normal operation of the department.
"To err is human." I have made some mistakes in my work, but I dare to deal with them. After criticism from leaders and colleagues, help and self-efforts, we must never allow ourselves to fall down twice in the same place. It is precisely because I am not proud in the face of victory and do not bow in the face of failure that I will grow and improve rapidly in my struggle. In addition, the fast running of the train depends on the front belt, which has many shortcomings in terms of work ability and ideology. In these aspects, I got the correct guidance and help from the department leaders and employees of this department, which made me improve my working ability, have a clear direction and have a correct attitude. Thus, it laid a good foundation for my development.
after this year's work, I am lucky to learn a lot. But this is far from enough, especially in terms of diversified skills. At the same time, with the increase of the company's business and the development of new products, we can expect that our work will be more arduous, the requirements will be higher, and the knowledge we need to master will be higher and wider. To this end, I will devote myself to my work with a brand-new mental state, work harder and study hard, and strive to improve all kinds of work skills and work efficiency. Do a good job and make due contributions.
working experience of quality inspector 4
I have been working as a quality inspector for some time. Looking back on this year's quality inspection work, I have benefited a lot. During this year as a quality inspector, I seriously studied and practiced the company's quality management control process. Through work and study, my working skills have been improved to a necessary level. For the treatment of quality problems in engineering, it has been greatly improved, and it has the necessary ability to determine and analyze. The following is a personal summary of 21__ years' work:
The quality control in the construction preparation stage refers to the quality control of various preparatory work, factors affecting quality and related aspects before the formal construction activities of the project begin, which is a work that must be done well in advance to ensure the normal construction production, so it is also called prior control. Construction preparation is not only done well before the project starts, but also runs through the whole construction process. The basic task of construction preparation is to establish all necessary construction conditions for the construction project, ensure the smooth progress of construction production and ensure the quality of the project meets the requirements. It is of great significance to do a good job of quality control before construction to ensure the quality of the project. It includes reviewing the technical qualifications of the construction team, purchasing and auditing construction machinery and equipment that have a significant impact on the project.
establish the quality control system, formulate the on-site quality management system of this project, including on-site meeting system, on-site quality inspection system, quality statistical report system, quality accident report processing system, quality statistical report processing system, and improve the measurement and quality inspection technology and means. Assist subcontractors to improve their site quality management system, and organize the quality assurance activities of the whole project. As the saying goes, "Fiona Fang can't be made without rules". Establishing rules and regulations is the premise to ensure the quality of the project, and it is also the primary task of quality inspectors.
check and control the quality of raw materials, semi-finished products and components required for the construction of the project. Important orders should be purchased only after samples are submitted and checked and approved by quality inspectors. All raw materials entering the site shall have product certificates or technical specifications. After a series of inspection methods, the obtained data are compared with the technical documents provided by the manufacturer, and it is found out in time whether the material quality meets the quality requirements of the project. Once found can't meet the requirements of engineering quality, immediately.