However, hotels, restaurants, shopping malls, bazaars, waiting rooms of passenger stations, waiting rooms of passenger terminals, civil airport terminals, stadiums, auditoriums, public entertainment places and other public gathering places must apply for fire control completion acceptance and fire control filing.
As long as it belongs to the public gathering place, fire safety inspection should be carried out before opening. There should be fire-fighting facilities such as fire hydrant, emergency light, evacuation indicator, exit indicator, fire extinguisher, fire door, smoke detector, manual alarm, fire alarm and sprayer.
Legal basis: Regulations on Supervision and Administration of Fire Prevention in Construction Projects
Article 8 The construction unit shall not require the design, construction, project supervision and other relevant units and personnel to violate the fire protection laws and regulations and the national technical standards for fire protection in engineering construction, so as to reduce the fire protection design and construction quality of building projects, and bear the following responsibilities for fire protection design and construction quality:
(a) to apply for fire protection design review and fire protection acceptance of construction projects in accordance with the law, to handle the fire protection design and fire protection filing procedures for completion acceptance in accordance with the law, and to accept spot checks; Public gathering places set up in construction projects shall not be put into use or business without fire safety inspection or failing to meet fire safety requirements after inspection.
(two) the implementation of engineering supervision of construction projects, fire construction quality should be entrusted to the supervision.
(three) the selection of fire design and construction units with the qualification grade prescribed by the state.
(four) the selection of qualified fire products and building components, building materials and decoration materials that meet the requirements of fire performance.
(five) according to the law, the construction project should pass the fire design audit and fire acceptance, and the construction shall not be organized without the audit or unqualified acceptance; Without acceptance or unqualified acceptance, it shall not be delivered for use.