Kitchen renovation process in the kitchen waterproof construction precautions introduced
Kitchen renovation process in the kitchen waterproofing construction precautions

In the process of renovation of the bathroom waterproofing construction is very important, but a lot of homeowners will ignore the kitchen waterproofing construction in the process of home renovation of the kitchen waterproofing construction is very important must not be ignored, the kitchen every day, unlike the bathroom water way a lot of water spilled to the ground or the wall, just cooking water basin at the time of water splash to the wall or occasionally spilled to the ground. The water splashed onto the wall or occasionally spilled onto the ground. Kitchen renovation process of kitchen waterproofing construction notes are introduced.

1, the kitchen waterproofing is just as important, because the kitchen has a floor cabinet, hanging cabinets, not only to pay attention to waterproofing in the kitchen

But also to prevent water leakage to the outside.

2, the construction site cleaned up, and sprinkled with water to make it fully wet but no water.

3, waterproof material varieties, grades and ratios, must comply with the provisions of the relevant standards of environmental protection standards. The product has a certificate of compliance with the proof of appearance.

4, painted waterproof layer of the basic level, shall not be uneven, loose, hollowing, sanding, cracking. Water content is less than 10%. There are floor drains in the kitchen and toilet floor waterproofing layer around the body contact with the wall upwards, not less than 25 cm above the ground, no flooding, no water, 24-hour water closure test without leakage.

5, the waterproof layer is firmly adhered, no slippage, sled edge, blistering, wrinkling. Floor drains, squatting pits, drainage ports, etc. remain open, construction should take protective measures.

6, passed through the wall, floor, etc. to stabilize the pipe root, should be protected, the construction process shall not be touched and dislocation; all easy to produce gaps in the parts of the fine treatment to prevent leakage.

7, kitchen waterproofing construction, the first pre-buried drainage pipes, clean and level the wall and floor grass-roots level, scrape a layer of plain cement paste to dry, the wall and floor brush two waterproofing materials to be completed at a time, you can also do the waterproofing of the wall, the interface must be dealt with, the upper and lower cross-over there should be 200mm, double-layer waterproofing.

8, the total thickness of the wall waterproof layer (waterproof mortar + waterproof mortar) is not less than 10 millimeters, the height is not less than 1800 millimeters.

9, with waterproofing products and cement mixed into waterproofing plain mortar, painted one to two times in the base surface, the total thickness of 2 mm.

10, 20 minutes after the waterproofing plain mortar table dry, with waterproofing and cement, sand mixed into a waterproof mortar, wipe in the waterproofing plain gray will be the surface, the thickness of 8 mm.

99.9% of the water will be eliminated by evaporation, but there will still be a very small part of the water through the gaps between the tiles penetrate into the walls and floor. Over a long period of time (a year or so) floors and walls without a waterproofing layer will be more noticeably wetter compared to other walls. At present, basically all the power are buried in the wall, in a humid environment on the safety of electricity and wire aging will have an impact. Kitchen renovation waterproofing is very necessary. If the kitchen waterproofing is not done, once the water leaks, the kitchen waterproofing repair will be very difficult, the repair will need to remove the well-placed cabinets, resulting in huge losses.