1, date and location: record the date and specific location of the inspection to ensure the accuracy and traceability of the record.
2, inspection personnel: list the names or work units of the personnel involved in the inspection, and record the identity information of the inspectors.
3. Purpose and scope of inspection: Specify the purpose and scope of the inspection, such as checking the implementation of garbage classification and collecting data.
4. Description of the inspection process: Record in detail the observations and findings during the inspection process. It can include the following: Garbage sorting and placement: record the placement of various types of garbage, including recyclables, hazardous garbage, wet garbage and dry garbage, and so on. Classified garbage collection: Record the implementation of classified garbage collection, including the setting of classified garbage cans and the frequency of collection. Publicity and education: Record the display and effect of garbage classification publicity and education, such as publicity slogans and posters.
5. Problem analysis: analyze the existing problems according to the observation and discovery during the inspection. A list of problems can be made and each problem can be briefly analyzed and evaluated.
6. Suggestions for improvement: In response to the problems identified, put forward the corresponding recommendations for improvement. Suggestions should be specific, feasible, and correspond to the solution of the problem.
7. Conclusion: Summarize the main findings and recommendations of the inspection, and emphasize the importance and necessity of waste classification work.