Publication category: planning adjustment
Publication time: from July 28, 2021 to August 9, 2021
Publication media: public media, project site, website publicity
Publication organization: Baoshan City Department of Natural Resources and Planning
The Baoshan Airport Expansion Project is located in the Baoshan Airport on February 15, 2019 for the "Construction Project Planning Permit" (Construction No. Baoshan City 201900012); now, due to design optimization reasons, apply for partial adjustment of the Baoshan Airport Expansion Project program, the Bureau intends to follow the procedures, the details of which are now publicized as follows:
Adjustment Matters:
(a) General Plan Part:
1. General Layout Plan The economic and technical indicators of the general plan of the terminal area are adjusted; 2. The layout of the road junction, central substation, engine room and special garage are optimized in the design stage of the construction drawings, and the floor area and building density indicators are adjusted.
(ii) building part
1. The ± 0.000 of the duty room was adjusted from 1670.6 m to 1672.70 m. 2. The indoor ± 0.00 elevation of the oil engine room building was optimized in conjunction with the terrain program, and it was adjusted from 1668.95 m to 1668.85 m. 3. The roadway lanes canopies, the cargo and field service complex, the terminal building, the terminal building canopies, and the air traffic control The appearance of the operational room was adjusted (see the building elevation than the map: attached Figure 1 - attached Figure 4).4. 4. The floor area of the terminal building was increased due to the specification of the steel wall frame of the glass curtain wall, and in order to meet the installation space of the glass curtain wall, the curtain wall was expanded outward by 0.6 m. The floor area of the terminal building was adjusted from 26,893.0 m2 to 27,549.9 m2 , with an increase of 656.9 m2.5. 5. The central transformer substation, the engine service Center substation, engine room and special garage, oil engine room exterior wall white real stone paint changed to light yellow real stone paint, life service center brown imitation wood grain changed to white (see before and after the adjustment of fa?ade effect comparison chart: attached Figure 5 - attached Figure 4).
The specific economic and technical indicators are subject to the final approval of the program after review.
If the relevant units and stakeholders have any objections to the above, please submit a statement, defense or hearing to the Bureau in writing (with signature and hand stamp) within the public notice period.
Tel: 0875-2207349,
Contact address: Baoshan City Natural Resources and Planning Bureau of Construction Engineering Planning Section.
Baoshan City Natural Resources and Planning Bureau
July 28, 2021
Source.