Summary of workers' personal work in a certain position

Time always flows through our fingertips inadvertently. Inadverten

Model essay on summary of individual work of post-setting workers

Summary of workers' personal work in a certain position

Time always flows through our fingertips inadvertently. Inadverten

Model essay on summary of individual work of post-setting workers

Summary of workers' personal work in a certain position

Time always flows through our fingertips inadvertently. Inadvertently, I have been working and living in Changzhou for one year, and the one-year internship and probation period are coming to an end. Looking back on the course of this year, I was deeply impressed. During this time, I learned a lot and made many sincere friends. In July, 20xx, I was assigned to work in the service department of the marketing center, mainly responsible for the processing and distribution of the contract and a series of follow-up issues after the completion of the contract. With the familiarity with the working environment and the company's operation process, I can skillfully use office software such as K3 and OA in my daily office. In June165438+1October, I was transferred to the marketing department to take charge of returning, repairing and borrowing parts. This position aims to improve the support for front-line sales staff and service personnel. Under the careful guidance of my colleagues and leaders, I quickly adapted to the work of this position and basically completed my daily affairs skillfully. I can humbly ask my colleagues around me about the confusion and incomprehension in my work.

I learned a lot during my internship. First of all, it should be made clear that the purpose of internship is to further improve my ideological consciousness and professional level through the combination of theory and practice, especially my practical working ability of observing, analyzing and solving problems, and my ability to treat people and communicate with the outside world, and strive to become a high-quality compound talent with strong practical ability, good professional ethics, high skills and high quality, which can actively adapt to the needs of socialist modernization. Through after-sales job training, I learned about the company's overall management process, production technology and process; Know the main equipment of many companies; Production organization and management, etc. In one year's work, I not only learned a lot of new knowledge and met new people, but more importantly, I corrected my labor viewpoint and improved my ability to work independently.

Through a year's work, I gradually developed and matured my own perspective and way of thinking. "Practice makes true knowledge", and in the process of practice, I once again feel enrichment and growth. In the future work, there are more places that need me to improve.

1, with strong post consciousness.

As a graduate, there is a process to change from a student to a social role. Each post has its own characteristics and responsibilities. Doing things with a sense of responsibility is a post responsibility and a professional accomplishment. In the future, if we want to continue to enhance our post responsibility, we must go deep into our daily work, do it down-to-earth and conscientiously. Only in this way can we hone and improve our job responsibilities.

2. Have a good learning ability at work, have a system of learning knowledge, and be able to solve problems by yourself through relevant channels.

Because there are all kinds of problems in the work, not every situation can be mastered. At this time, if you want to do a good job, you must have good learning ability, master the corresponding technology through continuous learning, and solve every problem encountered in your work. Such learning ability, on the one hand, comes from learning from colleagues around you with an open mind and from people with rich work experience. On the other hand, I have the ability of self-study, and I can try my best to find relevant methods to solve the problem without others' help.

Understand that good interpersonal relationship is the guarantee of our smooth work.

At work, we should not only deal with products, but also interact with people. Therefore, we must master the communication principles and social etiquette between colleagues and customers. On the one hand, I benefited from the long-term exercise in the school student union, which made me have relatively harmonious interpersonal relationships and created a good interpersonal atmosphere for the smooth progress of my work. In addition, I also have many shortcomings in my work. For example: lack of practical experience, lack of mastery of relevant industry standards, etc. Therefore, I often remind myself that I must not be afraid of hardship and fatigue, and strengthen practice while mastering solid theoretical knowledge, so as to integrate theory with practice. On the other hand, we should constantly strengthen our study and learn new knowledge to better serve our colleagues and customers.

4, to seriously study the scientific management skills of enterprises.

Management is a science, but also a science and art, and scientific management can give enterprises wings to take off. In daily work, put the management concept of the enterprise into practice. In-depth understanding and implementation of the company's management system, improve the overall quality of individuals. Read more management books after work, constantly supplement new knowledge and theories, and then apply the theory to practice. In the future, I will devote myself to my work with a brand-new mental state, study hard, improve my work efficiency and master my business ability. Actively respond to the company's measures to strengthen management, abide by the company's rules and regulations, and do a good job.

Article 2 Summary of individual work of workers in fixed posts

Time flies, and it has been one year and three months since I joined China Resources Cement Co., Ltd. in a blink of an eye. At present, my post is electrician, and I hope to evaluate my job placement.

I have been working for more than a year now. With the training of company leaders and the help of colleagues, my work ability and work experience have been greatly improved, and the theory and practice of studying at school are closely linked. I remember that when I first arrived at the company, it was 65438+20xx year1October 6th. On that day, we came to China Resources with our dreams. Everyone wants to display their talents in this new company to repay the society. On the first day of registration, we were arranged by the company to practice in another base-Nanning. During our three-month internship with China Resources in Nanning, we changed from a person who knew nothing about cement technology to a person who knew at a glance the functions, electrical working principles, maintenance of high-voltage motors and operating conditions of these equipment. On April 1 day, we returned to Luchuan Company with passion and devoted ourselves to the construction of the new base.

During the company's follow-up, by learning from the construction unit, we can understand the line direction, bridge direction and the distribution of each electrical room, record the time when the transformer in the electrical room has just been put into operation, and report oil leakage or abnormal temperature in time. The debugging of the motor is also recorded regularly, and the current, bearing temperature and abnormal sound of the motor are constantly checked. There are many problems in the trial production stage, such as the equipment that affects the kiln stop and the equipment that stops the vertical mill. This is what we need to pay close attention to, and we must control the shutdown as much as possible, especially the prevention. The basic requirements of the electrical room are dustproof, rodent-proof, rainproof and rainproof of the field control cabinet, which directly affect the equipment.

Shutdown factor, a qualified electrician is to ensure the normal operation of equipment. Especially for the operation of the high-voltage motor, we must strengthen the inspection, comprehensively monitor the current, voltage and temperature of the high-voltage motor, and replace the carbon brush in time to ensure the normal operation of the motor. Especially with the arrival of summer, the temperature directly affects the operation of high-voltage motors. Excessive temperature will accelerate the wear of the motor and reduce its life. The cooling of motor lubricating oil is a very important task. The low-voltage motors in the whole plant need to be replaced now. It is found that many low-voltage motors are not oiled when installed. Now with the arrival of summer, these low-voltage motors are facing the test of high temperature. Oil-free operation will directly lead to the wear of motor bearings. If it is not maintained in time, the motor will be scrapped for a long time.

It is also necessary for us electricians to eliminate the electrical circuit faults of equipment in time. For example, the control circuit of the belt conveyor is not ready. What should I do? First, ask the central control center if there is any signal that the alarm is running deviation or pulling rope, and whether the scene has reached the central control position. Let's go to the control cabinet in the electrical room first to see if the power supply has been delivered. After power transmission, check whether there is a signal from 105 line to the on-site button box, and whether there is a signal back after hitting the central control position. If there is a problem with the on-site button box, it is a problem. If it returns and a signal is sent to DCS, check whether the small relay is turned on and whether the lucky light in DCS is turned on. Wait a minute. This is the simplest circuit among all circuits, and there are many control circuits such as oil stations. These are all things that we must master. Anyway, as an electrician, we need to master the operation, maintenance and repair of equipment to improve production efficiency.

I believe that I have always been passionate about the post of electrician, and I also know its scope of responsibility. In the future work, I will be more strict with myself, motivate myself, improve myself, tap my potential, redouble my efforts, strive to make contributions, do my best, do better, unite my colleagues, keep making progress, and put the interests of the company first.

I cherish this job very much and hope to make more contributions to the long-term development of the company and grow and progress together with the company.

Model essay on summary of individual work of post-setting workers

I have been strict with myself since I joined XX Construction Engineering Group. During this period, I deeply realized that to become a qualified civil engineering technician, we must abide by professional ethics, further improve our own quality and professionalism, work honestly, and establish a correct world outlook, outlook on life and values. The work is summarized as follows:

First, ideological and moral aspects.

First of all, I have established a correct outlook on life and values, and maintained a positive working attitude and enthusiasm. I am proactive, diligent and pragmatic, with a strong sense of responsibility, and I am willing to accept all the work assigned by the leaders. I also pay attention to the learning and accumulation of knowledge, and realize the effective combination of theory and practice as soon as possible. In the continuous study, strive to improve their ideological awareness, theoretical level and practical ability.

Second, the work.

I feel very honored to be able to fully participate in the construction process of a project, so I cherish my work in Jindu Times New Town. Engineering construction is a process of transforming designers' thoughts from ideology to material form according to design drawings. To do a good job in engineering construction, we must first be familiar with the construction drawings, master the designer's intention, complete the process of understanding the design intention from the drawings and then go back to modify the drawings (that is, complete the joint review of the drawings before construction), then strengthen the understanding of the drawings, familiarize ourselves with the basic situation of the project, consider the specific construction plan, and preliminarily clarify the key points and difficulties of engineering and technical construction, so as to prepare for the future construction operation.

In the process of engineering construction, surveying and setting out is the most important, which runs through the whole engineering construction and is the soul of engineering construction. The project must be done well, and the survey and setting-out work must be done well, so the procedures of measurement, proofreading and rechecking must be indispensable (the survey and rechecking work must not be done by the same person); Secondly, it is necessary to proofread each construction layer, construction section and construction point in combination with a full set of drawings to avoid missing a small part of the project; Thirdly, it is to check whether the understanding of the actual operation layer of the project is consistent with their own ideas, and communicate in time when problems are found, so as to prevent problems before they happen.

After the construction of a certain project section is completed, it is necessary to check and accept it in time, sum up experiences and lessons, correct the problems found in the next construction section in time, and reduce the continuous occurrence of errors.

Engineering construction is a very rigorous work, and engineers and technicians must carve it as their own artistic products, strive for perfection, have a good work style, work with a responsible attitude towards the country (not wasting resources), society and owners, and have the determination to "do a project, build a monument and win a reputation" in order to do a good job and become a qualified project.

Engineering construction is a group work, which cannot be completed by one person or several people. This is a complicated job, which requires the close cooperation of quality inspection stations, design institutes and workers. Therefore, it is particularly important to do a good job in mutual contact and cooperation, otherwise, doing a good job in the project will become an empty talk. Reasonable operation, in order to improve production efficiency, ensure project quality and ensure construction safety.

Third, business ability.

In my spare time, I have strengthened my ability to operate electronic software such as word, Ecel, AutoCAD, Tianzheng Architecture and Photoshop. Especially AutoCAD and Tianzheng building software.

The above is my work experience and summary in the company. I like my major and I love my post even more. I will base myself on my post, work harder in the future and make my own contribution to the development of the company.