hotel decoration engineering construction organization design scheme
contents
Chapter 1 Comprehensive description of technical tender 2
Chapter 2 Construction organization design 6
Chapter 3 Management and cooperation of all subcontractors and independent contractors, Coordination measures 211
Chapter IV Introduction of project manager and list of technical management personnel on the construction site 213
Chapter V Introduction of qualified enterprises of tendering units (see attachment for details) 214
Chapter VI About project quality, Time limit for a project and warranty commitment 214
Chapter VII Schedule 211
Chapter VIII General Schedule 213
Chapter I Comprehensive Description of Technical Tender
Section I. Compilation Description
According to the lobby and dining room on the first floor (including the back kitchen) and the 19th to 23rd floors of Shanghai * * * * * Hotel. From the general contractor's point of view, combined with our company's construction strength, specialty, technology, supporting capacity of machines and tools and other factors, our company has compiled this technical bid on the premise of fully understanding the requirements mentioned in the bidding documents under the condition that the specific projects of subcontractors are not clear and the construction drawings are not detailed. We have demonstrated the feasibility of technical measures for the coordination and connection of key working procedures in various sub-projects, so that all links of this project are always under control in the whole process of decoration construction, reaching high quality, high standard and high level, satisfying customers, and ensuring the construction period, safety, quality and improving economic benefits while handling the relationship between Party A, the supervisor and relevant units. This project is a fine decoration project invested and transformed by Shanghai * * * * * Hotel, and the project funds have been put in place. The design drawings of the construction stage have been completed by Shanghai Architectural Design and Research Institute. The preparatory work for the early stage of construction has been completed, and the temporary water supply and power supply are provided by Party A, which can meet the construction requirements and meet the construction conditions for secondary decoration.
II. Compilation basis
1. According to the tender documents and construction drawings of the general contracting project for fine decoration of the lobby and dining room on the first floor (including the back kitchen), executive rooms and walkways on the 19th floor to the 2nd floor of Shanghai * * * * Hotel provided by Party A.
2. The information obtained from the site inspection organized by Party A and the contents of the pre-bid Q&A session.
3, organize management personnel to investigate the relevant situation of the construction site.
4. According to the current national codes for construction and installation acceptance of building decoration projects.
5, according to the company's ISO9111 international quality standards related documents.
6, combined with the decoration construction experience and information of our company.
Section II. Overview of the project
1. Brief introduction of the project
1. Project name: renovation and reconstruction project of Shanghai * * * * * Hotel
2. Project address: * * Road, Shanghai * * New District
3. Project scale: the lobby and dining room on the first floor (including the back kitchen)
4. Project area: about 8948M2 (including lobby area of 811 M2, dining room (including kitchen) area of 1238M2, and executive rooms and walkways of 19th to 23rd floors of 6911M2).