Current location - Recipe Complete Network - Catering industry - Bathroom hung ceiling bathroom partition decoration
Bathroom hung ceiling bathroom partition decoration
1, wall fixing piece Draw the center line of the fixing piece on the wall, drill three holes on the line with an electric drill, then embed plastic plugs in the holes, and then fix the fixing piece on the wall with expansion screws.

2. Draw the center line of adjusting the position of the foot seat by adjusting the floor of the foot seat, and fix the adjusting foot seat on the floor 150mm away from the front edge of the partition.

3. Lean the clapboard against the adjusting footstool between the wall fixing piece and clapboard, lift the clapboard to the ground with the normal height of 145 mm, and fix the clapboard on the wall fixing piece and adjusting footstool with screws after determining the level.

4. Column in the column-Fix the tie rod fixing piece at the top of the column with screws. Fig. 4 shows a wall-side column with L-shaped fixing parts, which integrates the column with the partition board-draw a straight line perpendicular to the ground on the wall, drill holes outside the straight line with an electric drill, insert plastic plugs into the holes, and fix the wall-side column with the L-shaped fixing parts with screws at the position off the ground 1448.

End post-Fix the upper edge pull rod fixture and L-shaped edge pull ring on the end post, and then fix the plate on the partition with screws.

5. The tie rod (1) shall be cut and fixed according to the actual length of the carriage. When the straight pull rod is connected horizontally, a circular connecting sleeve and an emergency connecting spring plate should be installed in the pipe to ensure that the joint is flat and firm, and the joint should be stretched in the fixed plate to increase the appearance.

(2) The 90-degree corner pull rod of the carriage is connected with the pull rods at both ends of the corner by adopting the 90-degree corner joint formed by aluminum alloy injection molding.

(3) Fix the terminal pull rod on the wall with the convex wall fixing sleeve and screws.

(4) Connect and fix the pull rod on the fixing piece at the upper edge of the column with screws.