Current location - Recipe Complete Network - Catering industry - What materials do you need to open a hotel fire control procedure in Qinhuangdao
What materials do you need to open a hotel fire control procedure in Qinhuangdao

2. A copy of the business license or a notice of pre-approval of the enterprise name issued by the administrative department for industry and commerce;

3. Copies of legal documents obtained in accordance with the law for the fire control acceptance of construction projects or for the record of fire control completion acceptance (this is crucial, and this procedure must be completed first if there is no such procedure);

5. Copies of pre-job fire safety education and training records of employees and professional qualification certificates of special jobs in the fire protection industry obtained by operators of automatic fire protection systems;

6. Other materials that should be declared according to law (such as a copy of the legal person's ID card, etc., which varies slightly from place to place);

7. In some places, it is also required to submit the fire protection design and construction drawing of the indoor decoration of the place, the quality certificate of the fire protection products, the certificate that the fire protection performance of the decoration materials meets the fire protection technical standards, and the factory certificate. Qinhuangdao Changgan Agency Company: Qinhuangdao Changgan: Agency company registered account transfer, hotel and bathing.