Shanxi Coal Industry Department: The procedures for the construction project of Shuimowan Coal Industry Co., Ltd. of Shanxi Coal Transportation and Marketing Group have been completed before the start of construction, and the construction and supervision units have been selected through bidding. In order to effectively prevent the occurrence of safety accidents, it is guaranteed to resolutely implement the national and provincial laws, regulations and standards on safety production, as well as the Notice on Further Strengthening the Safety Management of Coal Mine Construction Projects (No.20xx), Notice on Strengthening the Safety Management of Coal Mine Construction Projects (No.172) and Notice on Further Strengthening the Safety of Coal Mine Construction in the Province. As the person directly responsible for construction safety management, our unit solemnly promises:
A, merger, reorganization, integration, transformation of mine construction units should strictly perform or act as the client of the merged enterprise, to ensure that all mines within the scope of the integrated mine field (package) are fully taken over and fully responsible for safety production and construction.
Second, adhere to the policy of "safety first, prevention first, comprehensive management", strictly implement the "Coal Mine Safety Regulations" and other relevant laws and standards, standardize construction behavior, comprehensively strengthen safety management, and improve the level of safety management.
Three, strictly implement the responsibility of construction safety management, establish and improve the safety management organization, complete the full-time security personnel and all kinds of management personnel required for safe construction, organize the formulation and supervision of various rules and regulations and safety technical measures, and take full responsibility for the safety of engineering construction.
Fourth, strengthen the construction management of construction projects, do a good job in unified and coordinated management, organize scientifically, arrange the construction sequence reasonably, and do not blindly catch up with the construction period and schedule, nor engage in multi-head construction.
Five, strengthen the management of construction, supervision and other teams, strictly implement the construction unit personnel admission training and personnel filing management, it is strictly prohibited for the construction unit to use untrained or unqualified personnel.
Six, strengthen the basic work of engineering construction, provide the construction party with true and accurate geological and design technical data, do a good job in the construction and maintenance of double power supply, mine ventilation, safety monitoring system and other basic projects and systems, provide good safety construction conditions for the construction unit, and ensure that safety investment is in place in time.
Seven, strengthen the daily safety management in the process of construction, strengthen the site management, timely find and deal with the security risks in the process of construction, unsafe construction. Put an end to engineering subcontracting, illegal subcontracting and qualification affiliation.
Eight, scientific organizations to develop gas, water, fire, roof and other major safety technical measures and implementation. , strengthen the basic work of investigation and management of major safety hazards such as water accumulation and gas accumulation in goaf, and effectively prevent all kinds of construction safety accidents.
Nine, establish and improve the emergency plan system, strengthen emergency education, team building and drills, familiar with emergency knowledge and disaster avoidance routes, once found abnormal situation, immediately stop working and evacuate personnel.
Ten, in accordance with the relevant provisions, in accordance with the law, in strict accordance with the approved design organization construction, shall not carry out any illegal construction activities.
Eleven, consciously accept the supervision and inspection of coal, safety and other related management departments, and never resort to deceit.
If you violate the above commitments or fail to implement the national and provincial laws, regulations, standards and policies on safety production, resulting in safety accidents, you will voluntarily bear all the legal consequences arising therefrom.
Signature of legal representative:
Seal of construction unit
Commitment Letter for Safe and Civilized Construction 2 Project Name: _ _
General contractor: (hereinafter referred to as Party A)
Employer: (hereinafter referred to as Party B)
Project location: _ _ _ _ _ _ _
In order to implement safety management measures and ensure the safe and orderly implementation of the project, Party B made the following commitments during the project construction:
(a) before the start of work, personnel must be given safety education on safety precautions and measures, and personnel without safety education shall not be arranged to enter the workplace.
(2) Educate its own construction personnel to strictly abide by Party A's safety and security rules and regulations and various construction technology specifications, and consciously obey the on-site safety management of Party A's project management director and security personnel;
(3) Strictly abide by the safety production rules and regulations, consciously accept the safety supervision, management and guidance of Party A's unit, and do a good job in safe and civilized construction.
(4) All construction personnel entering and leaving the site must wear temporary passes issued by Party A's security department and accept the supervision and inspection of Party A's management personnel;
(5) Implement the construction progress. If the construction is carried out outside the planned time (Party A's abnormal working hours), an application shall be made to Party A's project leader in advance and reported to Party A's security department for approval and filing. Except for approved special circumstances, all construction personnel shall leave the site before 19: 00 every day;
(six) do not engage in any form of commercial activities in the construction site;
(seven) consciously protect the property of the construction site and fire, electrical appliances, network, office, decoration and other equipment and facilities in good condition;
(8) With the consent of Party A, temporary electricity, water and hot work laid in accordance with relevant safety specifications shall be equipped with safety facilities such as leakage protection and fire prevention, and wires shall not be connected without authorization;
(9) For complex and dangerous engineering projects, separate safety technical measures shall be formulated and implemented after being examined and qualified by Party A's unit.
(ten) shall not be arranged without the relevant departments of the training and assessment of undocumented personnel engaged in special types of work.
(1 1) When working at high altitude, safety protection must be carried out under or above the working platform, and special personnel shall be assigned for supervision. Personnel must wear safety belts and helmets correctly, and scaffolding or ladders must be safe and reliable, with anti-dumping measures. (12) Keep the construction site clean, do not pile up construction sundries everywhere, and properly place flammable materials for construction.
(13) Don't talk loudly, make noise, boo and fight. At the construction site;
(fourteen) not smoking, drinking and influencing others in the construction site uncivilized behavior; (15) Do not stay at the construction site. In case of special circumstances, it must be approved by Party A; (16) If a safety accident occurs due to our reasons, we will bear all the consequences;
(17) If the above commitment is violated, we agree to deduct relevant expenses from the final accounts of the project.
Unit name:
Letter of Commitment for Safe and Civilized Construction 3 Project Name:
Construction unit:
Supervision unit:
Construction unit:
Xinzhou Jinghua Real Estate Development Co., Ltd. New Jinghua Commercial Office Building Project earnestly implements the national, provincial and municipal laws, regulations, standards and norms related to quality and safety in production, coordinates with each other, and earnestly fulfills the responsibilities and obligations of project quality and safety in production. These commitments are as follows:
1. Obtain the qualification certificate of the corresponding level according to law, and undertake the project within the scope permitted by the qualification level.
2, the main person in charge shall be fully responsible for the safety production work of this unit according to law. Establish and improve the safety production responsibility system and safety production education and training system, formulate safety production rules and regulations and operating procedures, ensure the investment of funds required for the safety production conditions of the unit, conduct regular and special safety inspections on the projects undertaken, and make safety inspection records. The person in charge of the project shall be a person with corresponding professional qualifications, who shall be responsible for the safe construction of the project, implement the safe production responsibility system, safe production rules and regulations and operating procedures, ensure the effective use of safe production expenses, organize the formulation of safe construction measures according to the characteristics of the project, eliminate hidden dangers of safety accidents, and report production safety accidents in a timely and truthful manner.
3, the establishment of safety production management institutions, equipped with full-time safety production management personnel. Full-time safety production management personnel are responsible for on-site supervision and inspection of safety production. Timely report the hidden dangers of safety accidents to the project leader and the safety production management organization; Those who command or operate in violation of regulations should be stopped immediately.
4. Operators of vertical transport machinery, installers and dismantlers, blasters, signal workers, climbers and other special operators shall receive special safety operation training in accordance with the relevant provisions of the state, and can only work at their posts after obtaining the qualification certificate for special operations.
5, in the construction organization design, the preparation of safety technical measures and the construction site temporary electricity scheme. For high-risk partial projects, according to the relevant provisions of the state, province and city, prepare, review and demonstrate special construction plans, and organize their implementation after meeting the requirements.
6. Before the construction of a building project, the technical personnel in charge of project management shall explain the technical requirements for safe construction to the construction team and operators in detail, and both parties shall sign for confirmation.
7, at the entrance to the construction site, construction hoisting machinery, temporary electricity facilities, scaffolding, access, stairs, elevator wellhead, hole, bridge mouth, tunnel mouth, foundation pit, explosives and harmful gases, liquid storage places and other dangerous parts, set up obvious safety warning signs. According to the changes of different construction stages, surrounding environment, seasons and climate, corresponding safety construction measures are taken at the construction site. If the construction site temporarily stops construction, do a good job in site protection.
8. Separate the office, living area and working area of the construction site and keep a safe distance; The site selection of office and living quarters meets the safety requirements. Workers' meals, drinking water, rest places, etc. Meet health standards. Staff quarters shall not be set up in uncompleted residential flats.
9. Take special protective measures for adjacent buildings, structures and underground pipelines that may be damaged during construction. Abide by the laws and regulations on environmental protection and take measures at the construction site to prevent or reduce the harm and pollution of dust, waste gas, waste water, solid waste, noise, vibration and construction lighting to people and the environment. Construction projects in urban areas shall be fenced on the construction site.
10. Establish the responsibility system for fire control safety in the construction site, determine the person responsible for fire control safety, formulate various fire control safety management systems and operating procedures such as fire, electricity, inflammable and explosive articles, set fire exits and fire water sources, equip with fire control facilities and fire fighting equipment, and set up obvious signs at the entrance to the construction site.
1 1. Provide operators with safety protection articles and safety protective clothing, and inform them in writing of the operating procedures of dangerous posts and the hazards of illegal operations.
12. Operators shall abide by the mandatory standards, rules and regulations and operating procedures for safe construction, and use safety protection appliances and mechanical equipment correctly.
13. Purchase and lease safety protection appliances, machinery and equipment, construction tools and accessories with production (manufacturing) licenses and product certificates, and conduct inspection before entering the construction site. Safety protection appliances, mechanical equipment, construction tools and accessories on the construction site shall be managed by special personnel, regularly inspected, repaired and maintained, corresponding data files shall be established, and scrapped in time according to relevant state regulations.
14. Before using jack-up erection facilities such as construction hoisting machinery, integral lifting scaffolding and formwork, organize relevant units to carry out acceptance inspection, or entrust inspection and testing institutions with corresponding qualifications to carry out acceptance inspection; Use leased machinery and equipment, construction machinery and accessories, and use them after acceptance.
15. The main person in charge, project leader and full-time safety production management personnel shall take up their posts after passing the examination by the construction administrative department or other relevant departments. Conduct safety education and training for managers and operators at least once a year, and record the education and training in personal work files.
16, handle accidental injury insurance for personnel engaged in dangerous operations on the construction site.
Construction date:
Construction unit:
Commitment letter of safe and civilized construction. According to the Construction Law of People's Republic of China (PRC), the Law of People's Republic of China (PRC) on Safety in Production, the Regulations on Quality Management of Construction Projects, the Regulations on Safety in Production of Construction Projects and related laws and regulations, in order to strengthen the quality and safety production of construction projects, promote our unit to strengthen the sense of quality and safety responsibility, and ensure zero quality accidents and zero safety production accidents, we solemnly promise as follows.
(a) before the construction project starts, my unit shall apply to the construction administrative department at or above the county level where the project is located for a construction permit in accordance with the relevant provisions of the state;
(two) my unit shall submit the construction drawing design documents to the construction administrative department at or above the county level or other relevant departments for review.
(3) Before receiving the construction permit or commencement report, our unit shall go through the project quality supervision procedures according to the relevant provisions of the state.
(four) the construction project contractor shall not force the contractor to bid at a price lower than the cost, and shall not arbitrarily shorten the reasonable construction period.
(five) our unit shall not express or imply that the design unit or the construction unit violates the mandatory standards of engineering construction and reduces the quality of construction projects.
(six) advocate the implementation of general contracting of construction projects, and prohibit the dismemberment of construction projects.
(7) Our unit shall, within 15 days from the date of completion and acceptance of the construction project, report the completion and acceptance report of the construction project and the approval documents or permission documents of the planning, public security, fire protection and environmental protection departments to the construction administrative department or other relevant departments for the record.
(eight) in the preparation of the project budget, our unit shall determine the cost of the safe working environment and safe construction measures for the construction project.
(9) Our unit shall not express or imply that the construction unit purchases, leases or uses safety protection appliances, machinery and equipment, construction machines and accessories, fire control facilities and equipment that do not meet the requirements of safe construction.
(10) Our company promises that if it fails to perform its duties in the project construction, it will be punished according to the following principles:
In violation of relevant laws and regulations such as People's Republic of China (PRC) Construction Law, People's Republic of China (PRC) Law on Work Safety, Regulations on Quality Management of Construction Projects and Regulations on Work Safety Management of Construction Projects, strict upper limit punishment shall be imposed in accordance with its provisions.
Construction unit (official seal):
Date:
Commitment to Safe and Civilized Construction 5 All parties concerned:
Our company has the honor of winning the bid for the construction of investment projects. In order to realize safe production and civilized construction and ensure the smooth progress of the project, our company and the project manager solemnly promise to relevant parties:
1. Conscientiously implement the safety production laws and regulations such as the Construction Law, the Law on Work Safety and the Regulations on the Administration of Work Safety in Construction Projects, adhere to the principle of "safety first, prevention first", establish and improve the safety production management system of enterprises and project departments, and make it run normally and effectively;
Second, set up a project management team in accordance with the regulations, with full-time safety production management personnel, part-time safety officers for each team, and establish a safety production supervision and management network;
Third, the cost of safety and civilized measures paid by the construction unit will all be used for the purchase and update of construction safety protection appliances and facilities, the implementation of safety construction measures and the improvement of safety production conditions, and will never be used for other purposes;
Fourth, strengthen the safety education and training for the operators entering the site. Special operations personnel should hold valid certificates; All operators have received "Level 3" safety education and training, and can only take up their posts after passing the examination;
Five, the implementation of mandatory standards for production safety in engineering construction, strict and comprehensive implementation of the approved construction organization design and special construction scheme and its safety technical measures, and in accordance with the provisions, do a good job of safety technical disclosure;
Six, the company and the project department are in accordance with the provisions, hierarchical implementation of supervision and inspection, timely eliminate all kinds of accidents, and timely report according to the relevant provisions;
Seven, strengthen the civilized construction management of the construction site, educate employees to consciously resist the "four chaos" behavior, the fence, gate, washing table, road hardening, material stacking, building facade, overlay and catering, etc. Meet the requirements of civilization and hygiene;
Eight, accept the supervision of the administrative department of construction and construction, supervision, survey and design and social stakeholders, take seriously the instructions or opinions and suggestions put forward, and eliminate all kinds of hidden dangers in time;
Nine, the occurrence of production safety accidents, in accordance with the provisions of the accident management, timely report to the construction administrative departments, local production safety supervision departments and other relevant departments, and actively cooperate with the accident investigation and handling, and never conceal or delay the report.
The above commitment is the expression of the true consciousness of the enterprise and the project manager. If it is violated, it is willing to accept the punishment given by the relevant parties according to law or regulations.
Letter of Commitment (official seal): _ _ _ _ _ _ _ Project Manager (signature): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Commitment to Safe and Civilized Construction 6 Xi 'an Textile Industrial Park promises to strengthen the civilized and standardized management of urban roads occupied by excavation on the construction site, ensure that the municipal facilities are in good condition, the city appearance and environment are clean and tidy, and ensure the safe and smooth progress of the construction project. According to the relevant provisions of the Regulations on the Administration of Urban Roads and the Regulations on the Administration of Xi Municipal Engineering Facilities, the following provisions are made for the excavation and occupation of urban roads in the textile industrial park, the opening of enterprises entering the park, and the connection of pipe networks:
1. Carry out the construction in strict accordance with the examination and approval opinions of the planning and construction section of Xi 'an Textile Industrial Park and the approved location, area and construction period. If it is necessary to change due to special circumstances during construction, it shall go through the formalities for examination and approval of change at the Planning and Construction Section of Textile Industrial Park in time.
2, the construction site must post the corresponding project approval documents, set up eye-catching safety warning signs, identification; Set up a hard barrier (wall) with uniform color specifications, firm stability and closed construction site, a brick external powder retaining wall with a height of ≥ 1.8m and a lower part of 0.3m, without skew defects, and keep it neat, straight and clean. Open-air operation is strictly prohibited.
3. The construction unit shall take dust-proof measures such as sprinkling water and covering, and the site shall have special personnel responsible for wiping and cleaning the partition (wall) every day to ensure that the partition (wall) is clean and free of dust and dirt, and materials, garbage and sewage shall not be piled up outside the partition (wall) to ensure that the surrounding environment of the construction site is clean and tidy.
4. The exposed loess shall not be piled up at will on the construction site. If it is really necessary to pile up, it should be covered with green sand net to prevent dust, and the muck generated by construction operation must be removed in time.
Go away. Temporary stacking of muck on the lawn must be lined with nylon cloth to protect the lawn.
5. When digging roads, detailed construction protection measures and schemes must be formulated to ensure smooth traffic and the safety of supporting pipe network facilities attached to roads.
6. The entrance to the construction site must be hardened, and the construction machinery and vehicles shall be scrubbed, dismantled and dustproof by special personnel. Vehicles with muddy bodies and wheels are not allowed to leave the construction site. The construction unit shall strictly manage the transport vehicles according to the requirements of "two points and one line" (land release, dumping site and transport route). The transport vehicles shall have complete licenses and be safely sealed, and shall not be overloaded, overspeed or spilled along the way to prevent leakage.
7, the construction site must have a full-time security officer responsible for maintaining and diverting traffic, to ensure safe and smooth.
8. After the project construction is completed and the road surface is restored, the construction unit can remove the safety facilities such as guardrails (walls) and steel plates, so as to finish the work, clean up the materials and clean up the site.
9. During the period of construction and non-acceptance, the construction unit shall bear all economic or legal responsibilities for casualties and property losses caused by the collapse or defect of municipal engineering facilities, the collapse or defect of partition walls or unsafe accidents such as burning, explosion and electric shock.
10. After the project is completed and accepted, the applicant shall take timely measures to repair the road surface collapse caused by the fracture of the pipeline itself and the backfill quality, and the park management committee has the right to investigate the responsibility of the construction unit.
1 1. In case of violation of the above contents and failure to make rectification within the time limit, the administrative committee of textile industrial park will take measures to make rectification, and the required expenses will be borne by the applicant (or deducted from the deposit) and punished according to regulations.
Project name: natural gas pipe jacking operation
Construction unit: Shaanxi Ao Bai Regenerative Medicine Co., Ltd.
Substitution table:
Construction unit: Xilan Natural Gas Co., Ltd.
Substitution table:
Approve or not. : telephone: telephone: MM DD YY.