Current location - Recipe Complete Network - Catering industry - How to check and accept the house decoration? There are several matters needing attention.
How to check and accept the house decoration? There are several matters needing attention.

How to check and accept the house decoration is really a headache for the majority of homeowners. In the acceptance of houses, many homeowners who don't know how to accept them are sure to overlook many details. As for how to check and accept the house decoration, different areas need to pay attention to different issues. How to check and accept the house after it is decorated? There are several points for attention: 1. Hydropower Project

Hydropower belongs to the concealed works of houses. Therefore, after the hydropower project is completed, it should be accepted as soon as possible, and don't wait until all the projects are completed. Check whether the water and electricity lines are straight, whether there are protective materials on the surface, and whether you pay attention to safety issues. After the overall renovation, check whether the water and electricity can be used normally, and pay attention to whether the water outlet and drainage problems are unobstructed. Second, the wall

In the acceptance, it is important to pay attention to whether the wall is flat and crack-free. If it is latex paint, check whether the color on the wall is uniform, whether there are blisters, wrinkles, etc. If you use wallpaper, you should also pay attention to whether the pattern splicing of wallpaper is correct, whether the cutting of wallpaper is smooth, and there are no tear marks. Third, the ground

When accepting the ground, because the naked eye can't directly see whether the ground is flat or not, it can be checked by the vertical measuring ruler. The bathroom floor should have a slope of about 15 degrees and a floor drain at the lowest point, which is a qualified bathroom floor. If there are tiles on the floor, you can tap lightly to check whether there is a hollow condition. Generally, hollow tiles account for about 21% of the total tile area, which are all qualified. Iv. others

after checking the front part, check the waterproof situation in the house. In particular, the bathroom must pass the 24-hour closed water test to be considered qualified. Acceptance of doors and windows at home is also very important, to see if there are gaps and so on.

how to check and accept the house decoration, and master the above four parts. Remember, the water and electricity should be checked as soon as possible after the completion of the renovation, so as not to solve the problem as soon as it is discovered after the completion of the renovation. Waterproofing is the most important thing, and if it is not done well, it will be a lot of trouble in the event of water leakage and seepage in future life. Doors and windows should be tight, the walls should be free of cracks, and the ground should be flat.

Tuba Rabbit online provides you with "decoration quotations, 1-4 local decoration companies, 3 sets of decoration design schemes" for free, as well as the decoration pit avoidance strategy! Click this link: /yezhu/zxbj-cszy.php? to8to_from=seo_zhidao_m_jiare& Wb, you can get it for free ~